Details of Project:
(a)Name of the project(s) Modernization and Expansion Plan (MEP) of Existing Paper/Board Manufacturing Plant at JKPL Unit: CPM, Fort Songadh, Dist Tapi, Gujarat
(b)Name of the Company / Organisation JK PAPER LTD
(c)Registered Address PO CENTRAL PULP MILLS,FORT SONGADH, DIST TAPI, GUJARAT,Tapi,Gujarat-394660
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Brij Mohan Dhiman
(b)Designation (Owner/ Partner/ CEO) Senior General Manager- Commercial
(c)Address PO CENTRAL PULP MILLS,FORT SONGADH, DIST TAPI, GUJARAT,Songadh,Tapi,Gujarat-394660
(d)Pin code 394660
(e)E-mail nkkhanna@cpmjk.jkmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No. 02624220138
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/GJ/IND/4883/2008
(d)Master Proposal Number(Single Window) SW/104677/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village Gunsada: 222/1, 222/2/A, 222/2/B, 222/3/A
(b)Pincode 394660
(c)Bounded Latitudes (North)
From
Degree 21.2081
Minutes
Second
From
Degree 21.2134
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.5670
Minutes
Second
From
Degree 73.5701
Minutes
Second
(e)Survey of India Topo Sheet No. 46G/7, 46G/8, 46G/11, 46G/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 90
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/416/2008-IA.II(I)
(c)Date of Issue of TOR
(f)Previous TOR Letter NA
(b)Date of Apply of EC 28 May 2008
(c)Date of Issue of EC 17 Oct 2008
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Mar 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Apr 2019
Distance of Public Hearing Venue from the Proposed Project :0
CPM Colony Ground, JK Paper Ltd
State :Gujarat
District :Tapi
Tehsil :Songadh
Village :Gunsada, Bhimpura, Singalkhanch, Fort Songadh
247issues related to discharge of treated wastewater, employment opportunities, CSR implementation, odour and air emissionsDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-266/2008(ENV)/316
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 19 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)BCTMP Mill0100000100000Tons per Annum(TPA)OthersCaptive
(2.)paper/board production160800200000360800Tons per Annum(TPA)Road
(3.)Bleached Chemical Wood Pulp Mill60000100000160000Tons per Annum(TPA)OthersCaptive
(4.)Captive Power Plant30.2541.7572Mega Watt(MW)OthersCaptive
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Secondary Fibre Treatment (SFT) Plant200 BD TPD400 BD TPD600 BD TPDExisting facility will be used with New 400 tpd SFT plant
(2.)Bleached Chemical Wood Pulp Mill60,000 BD TPA1,00,000 BD TPA1,60,000 BD TPAReplacing existing hard wood pulp mill with RDH cooking and ECF bleaching mill
(3.)BCTMP Mill01,00,000 AD TPA1,00,000 AD TPANew unit
(4.)Total paper/board production160800200000360800Installation of One (1) New Multi-Layer Coated Board Machine of capacity 2,00,000 tpa
(5.)Captive Power Plant30.25 MW41.75 MW72 MWExisting two TGs. New TG of 30 MW and 18 MW will be installed.
(6.)De-Inking Plant0150 BD TPD150 BD TPDNew DIP will be installed.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 May 2019
(iv)Valid Upto 10 Apr 2024
(v)File No. AWH-101342
(vi)Application No. CCA-Renewal No. 153670
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 55
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 352000
(b)Existing quantity of raw material/fuel 163000
(c)Total quantity of raw material/fuel 515000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Waste Paper82000Tons per AnnumLocalRoad100 Open MarketCopy of Linkage
(2.)Bleached Chemi Thermo Mechanical Pulp (BCTMP)58700Tons per AnnumCaptiveOthersCaptive0 CaptiveCopy of Linkage
(3.)Indian Coal200000Tons per AnnumWestern CoalfieldsRail500 LinkageCopy of Linkage
(4.)Wood515000Tons per AnnumSocial and farm forestryRoad350 OthersSocial and farm forestryCopy of Linkage
(5.)Lignite100000Tons per AnnumlocalRoad100 LinkageCopy of Linkage
(6.)Soft Wood Pulp (SWP)9900Tons per AnnumImportedRoad100 Open MarketCopy of Linkage
(7.)Imported Coal200000Tons per AnnumIndonesiaRoad100 Open MarketCopy of Linkage
(8.)Furnace oil3200OthersKilo Litres per AnnumlocalRoad100 Open MarketCopy of Linkage
(9.)Hard Wood Pulp (HWP)26000Tons per AnnumCaptiveRoad0 OthersCaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 24 Sep 2018 To 23 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube38.67.527.480
(2.)OthersozoneMicro Gram per Meter Cube19.210.218.4400
(3.)PM2.5Micro Gram per Meter Cube57.322.34260
(4.)NOxMicro Gram per Meter Cube48.214.338.480
(5.)PM10Micro Gram per Meter Cube94.352.277.3100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l670351.215002000
(2.)Chloridesmg/l116.4852.292501000
(3.)Heavy MetalsCoppermg/l0.2600.051.5
(4.)OthersZincmg/l0.880.28515
(5.)Total Hardnessmg/l335.01253.31200600
(6.)pHNA8.27.26.58.5
(7.)Fluoridemg/l0.350.181.01.5
(8.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.058.04B
(2.)DOmg/l6.16.0B
(3.)CODmg/l00B
(4.)BODmg/l00B
(5.)OthersIronmg/l0.370.30B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.850.1555
(2.)Leq(Night)A-weighted decibels(dB(A))44.541.3445
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare362196
(2.)pH8.327.24
(3.)Electric ConductivityMillisiemens per Centimetre0.000520.00020
(4.)K(Potassium)Othersmg per 100 g24540.56
(5.)P(Phosphorus)Kilogram per hectare36.111.34
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.9 To 9.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.3 To 7.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface370005 Not Appliacble PipelineIntake Wellletter dated 12-07-201812 Jul 201845000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)total wastewater generated from mill3000045000biological unit with tertiary treatmentOthersLand Irrigation200028000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 30000
(b)Total Discharged Water (Kilolitre per Day) 28000
(c)Total Reused Water (Kilolitre per Day) 2000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)19040Tons100RoadOthersWill be sold to board manufacturers
(2.)Fly ashFly Ash142800Tons100RoadOthersWill be used for Cement/Brick manufacturing
(3.)Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20700Kilolitre100RoadAuthorized Recyclers
(4.)Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)20700Kilolitre100RoadAuthorized Recyclers
(5.)wood dustIndustrial Waste20400Tons0Otherswill be used within the siteOthersUsed as alternative fuel in Boiler
(6.)Lime sludge/gritIndustrial Waste13600Tons0Otherswill be used within the siteOtherslime grit will be used as backfilling material
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube2629.4835.580
(2.)PM10Microgram per Meter Cube86.50.51.5988.10100
(3.)PM2.5Microgram per Meter Cube35.850.5136.8660
(4.)NOxMicrogram per Meter Cube28.90.96.0334.9580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)150 tph boilerMix of imported, indian coal and lignite752PM101.3
(2.)150 tph boilermix of imported, indian coal and lignite752NOx4
(3.)chemical recovery boilerbiomass703.3NOx9.33
(4.)Chemical recovery boilerbiomass703.3PM100.93
(5.)Chemical recovery boilerbiomass703.3SO218.67
(6.)150 tph boilerMIx of imported, indian coal and lignite752SO24
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60000
(b)Source captive power plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 146.901
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 146.901
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 146.901
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 146.901
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant8.09Existing available vacant land will be used
(2.)Green belt4.4046Existing available vacant land will be used
(3.)Othersmaterial storage, roads16.1846Existing available vacant land will be used
Total (ha.) 28.6792
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanot applicable0not applicable
(2.)ESZsnot applicable0not applicable
(3.)Wildlife Corridorsnot applicable0not applicable
(4.)ESAsnot applicable0not applicable
(5.)WLSnot applicable0not applicable
(6.)Corridorsnot applicable0not applicable
(7.)NPAnot applicable0not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot applicable0Not applicable
(2.)Defence InstallationsNot applicable0Not applicable
(3.)ForestVyara5North
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 146.901
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable. The mill has already acquired 146.
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tapi River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 1000
(e)No. of working days 365
(f)Total Manpower 2300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt12010130
(2.)Percentage of Total Project Area33235
(3.)No. of Plants13250015000147500
(4.)Funds Allocated15000002000001700000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalReplacing existing chlorine-based pulp mill with Elemental Chlorine Free (ECF) process and existing conventional old digesters with state-of-the-art RDH cooking
(2.)SocialRs. 375 Lakhs has been embarked for the local community development within the vicinity of the project area for 5 years under CER
(3.)FinancialThe project is likely to generate income to the state by way of Goods and Service Tax (GST) to the tune of Rs 120 crores per annum and by way of income tax and other taxes to the tune of Rs. 30 crores per annum.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Parry House, 3rd Floor, No.2, NSC Bose Road, Chennai- 600001
(iv)Mobile No. 9677003778
(v)Landline No. 0444044562
(vi)Email Id bhaskarvs@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBrij Mohan Dhiman
DesignationSenior General Manager- Commercial
Name of Company (Applicant Name should not be given here)JK PAPER LTD
AddressPO CENTRAL PULP MILLS
Print