1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Modernization and Expansion Plan (MEP) of Existing Paper/Board Manufacturing Plant at JKPL Unit: CPM, Fort Songadh, Dist Tapi, Gujarat | (b)Name of the Company / Organisation | JK PAPER LTD | (c)Registered Address | PO CENTRAL PULP MILLS,FORT SONGADH, DIST TAPI, GUJARAT,Tapi,Gujarat-394660 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Brij Mohan Dhiman | (b)Designation (Owner/ Partner/ CEO) | Senior General Manager- Commercial | (c)Address | PO CENTRAL PULP MILLS,FORT SONGADH, DIST TAPI, GUJARAT,Songadh,Tapi,Gujarat-394660 | (d)Pin code | 394660 | (e)E-mail | nkkhanna@cpmjk.jkmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | 02624220138 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(i) Pulp & paper industry excluding manufacturing of paper from waste
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/GJ/IND/4883/2008 | (d)Master Proposal Number(Single Window) | SW/104677/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Village Gunsada: 222/1, 222/2/A, 222/2/B, 222/3/A | (b)Pincode | 394660 | (c)Bounded Latitudes (North) | | From | | Degree | 21.2081 | Minutes | | Second | | From | | Degree | 21.2134 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.5670 | Minutes | | Second | | From | | Degree | 73.5701 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 46G/7, 46G/8, 46G/11, 46G/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 90 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/416/2008-IA.II(I) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 28 May 2008 | (c)Date of Issue of EC | 17 Oct 2008 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 30 Apr 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| CPM Colony Ground, JK Paper Ltd | State : | Gujarat | District : | Tapi | Tehsil : | Songadh | Village : | Gunsada, Bhimpura, Singalkhanch, Fort Songadh |
| 247 | issues related to discharge of treated wastewater, employment opportunities, CSR implementation, odour and air emissions | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-266/2008(ENV)/316 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 19 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | BCTMP Mill | 0 | 100000 | 100000 | Tons per Annum(TPA) | | Others | Captive | (2.) | paper/board production | 160800 | 200000 | 360800 | Tons per Annum(TPA) | | Road | | (3.) | Bleached Chemical Wood Pulp Mill | 60000 | 100000 | 160000 | Tons per Annum(TPA) | | Others | Captive | (4.) | Captive Power Plant | 30.25 | 41.75 | 72 | Mega Watt(MW) | | Others | Captive | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Secondary Fibre Treatment (SFT) Plant | 200 BD TPD | 400 BD TPD | 600 BD TPD | Existing facility will be used with New 400 tpd SFT plant | (2.) | Bleached Chemical Wood Pulp Mill | 60,000 BD TPA | 1,00,000 BD TPA | 1,60,000 BD TPA | Replacing existing hard wood pulp mill with RDH cooking and ECF bleaching mill | (3.) | BCTMP Mill | 0 | 1,00,000 AD TPA | 1,00,000 AD TPA | New unit | (4.) | Total paper/board production | 160800 | 200000 | 360800 | Installation of One (1) New Multi-Layer Coated Board Machine of capacity 2,00,000 tpa | (5.) | Captive Power Plant | 30.25 MW | 41.75 MW | 72 MW | Existing two TGs. New TG of 30 MW and 18 MW will be installed. | (6.) | De-Inking Plant | 0 | 150 BD TPD | 150 BD TPD | New DIP will be installed. | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 06 May 2019 | (iv)Valid Upto | 10 Apr 2024 | (v)File No. | AWH-101342 | (vi)Application No. | CCA-Renewal No. 153670 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1500 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 55 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 352000 | (b)Existing quantity of raw material/fuel | 163000 | (c)Total quantity of raw material/fuel | 515000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Waste Paper | 82000 | Tons per Annum | | Local | Road | | 100 | Open Market | | Copy of Linkage | (2.) | Bleached Chemi Thermo Mechanical Pulp (BCTMP) | 58700 | Tons per Annum | | Captive | Others | Captive | 0 | Captive | | Copy of Linkage | (3.) | Indian Coal | 200000 | Tons per Annum | | Western Coalfields | Rail | | 500 | Linkage | | Copy of Linkage | (4.) | Wood | 515000 | Tons per Annum | | Social and farm forestry | Road | | 350 | Others | Social and farm forestry | Copy of Linkage | (5.) | Lignite | 100000 | Tons per Annum | | local | Road | | 100 | Linkage | | Copy of Linkage | (6.) | Soft Wood Pulp (SWP) | 9900 | Tons per Annum | | Imported | Road | | 100 | Open Market | | Copy of Linkage | (7.) | Imported Coal | 200000 | Tons per Annum | | Indonesia | Road | | 100 | Open Market | | Copy of Linkage | (8.) | Furnace oil | 3200 | Others | Kilo Litres per Annum | local | Road | | 100 | Open Market | | Copy of Linkage | (9.) | Hard Wood Pulp (HWP) | 26000 | Tons per Annum | | Captive | Road | | 0 | Others | Captive | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 24 Sep 2018 To 23 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 38.6 | 7.5 | 27.4 | 80 | (2.) | Others | ozone | Micro Gram per Meter Cube | 19.2 | 10.2 | 18.4 | 400 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 57.3 | 22.3 | 42 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 48.2 | 14.3 | 38.4 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 94.3 | 52.2 | 77.3 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 670 | 351.21 | 500 | 2000 | (2.) | Chlorides | | | mg/l | | 116.48 | 52.29 | 250 | 1000 | (3.) | Heavy Metals | | Copper | mg/l | | 0.26 | 0 | 0.05 | 1.5 | (4.) | Others | Zinc | | mg/l | | 0.88 | 0.28 | 5 | 15 | (5.) | Total Hardness | | | mg/l | | 335.01 | 253.31 | 200 | 600 | (6.) | pH | | | NA | | 8.2 | 7.2 | 6.5 | 8.5 | (7.) | Fluoride | | | mg/l | | 0.35 | 0.18 | 1.0 | 1.5 | (8.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.05 | 8.04 | B | (2.) | DO | | mg/l | | 6.1 | 6.0 | B | (3.) | COD | | mg/l | | 0 | 0 | B | (4.) | BOD | | mg/l | | 0 | 0 | B | (5.) | Others | Iron | mg/l | | 0.37 | 0.30 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.8 | 50.15 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.5 | 41.34 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 362 | 196 | (2.) | pH | | | 8.32 | 7.24 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.00052 | 0.00020 | (4.) | K(Potassium) | Others | mg per 100 g | 245 | 40.56 | (5.) | P(Phosphorus) | Kilogram per hectare | | 36.1 | 11.34 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.9 To 9.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.3 To 7.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 37000 | 5 | Not Appliacble | Pipeline | | Intake Well | | letter dated 12-07-2018 | 12 Jul 2018 | 45000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | total wastewater generated from mill | 30000 | 45000 | biological unit with tertiary treatment | Others | Land Irrigation | 2000 | 28000 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 30000 | (b)Total Discharged Water (Kilolitre per Day) | 28000 | (c)Total Reused Water (Kilolitre per Day) | 2000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 19040 | Tons | 100 | Road | | Others | Will be sold to board manufacturers | (2.) | Fly ash | Fly Ash | | 142800 | Tons | 100 | Road | | Others | Will be used for Cement/Brick manufacturing | (3.) | Spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20700 | Kilolitre | 100 | Road | | Authorized Recyclers | | (4.) | Spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20700 | Kilolitre | 100 | Road | | Authorized Recyclers | | (5.) | wood dust | Industrial Waste | | 20400 | Tons | 0 | Others | will be used within the site | Others | Used as alternative fuel in Boiler | (6.) | Lime sludge/grit | Industrial Waste | | 13600 | Tons | 0 | Others | will be used within the site | Others | lime grit will be used as backfilling material | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 26 | 2 | 9.48 | 35.5 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 86.5 | 0.5 | 1.59 | 88.10 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 35.85 | 0.5 | 1 | 36.86 | 60 | (4.) | NOx | | Microgram per Meter Cube | 28.9 | 0.9 | 6.03 | 34.95 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 150 tph boiler | Mix of imported, indian coal and lignite | 75 | 2 | PM10 | | 1.3 | (2.) | 150 tph boiler | mix of imported, indian coal and lignite | 75 | 2 | NOx | | 4 | (3.) | chemical recovery boiler | biomass | 70 | 3.3 | NOx | | 9.33 | (4.) | Chemical recovery boiler | biomass | 70 | 3.3 | PM10 | | 0.93 | (5.) | Chemical recovery boiler | biomass | 70 | 3.3 | SO2 | | 18.67 | (6.) | 150 tph boiler | MIx of imported, indian coal and lignite | 75 | 2 | SO2 | | 4 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60000 | (b)Source | captive power plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 146.901 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 146.901 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 146.901 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 146.901 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 8.09 | Existing available vacant land will be used | (2.) | Green belt | | 4.4046 | Existing available vacant land will be used | (3.) | Others | material storage, roads | 16.1846 | Existing available vacant land will be used | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | not applicable | 0 | not applicable | (2.) | ESZs | not applicable | 0 | not applicable | (3.) | Wildlife Corridors | not applicable | 0 | not applicable | (4.) | ESAs | not applicable | 0 | not applicable | (5.) | WLS | not applicable | 0 | not applicable | (6.) | Corridors | not applicable | 0 | not applicable | (7.) | NPA | not applicable | 0 | not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Not applicable | 0 | Not applicable | (2.) | Defence Installations | | Not applicable | 0 | Not applicable | (3.) | Forest | | Vyara | 5 | North | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 146.901 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable. The mill has already acquired 146. | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tapi River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 300 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 1000 | (e)No. of working days | 365 | (f)Total Manpower | 2300 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 120 | 10 | 130 | (2.) | Percentage of Total Project Area | 33 | 2 | 35 | (3.) | No. of Plants | 132500 | 15000 | 147500 | (4.) | Funds Allocated | 1500000 | 200000 | 1700000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Replacing existing chlorine-based pulp mill with Elemental Chlorine Free (ECF) process
and existing conventional old digesters with state-of-the-art RDH cooking | (2.) | Social | Rs. 375 Lakhs has been embarked for the local community development within the vicinity of the project area for 5 years under CER | (3.) | Financial | The project is likely to generate income to the state by way of Goods and Service Tax (GST) to the tune of Rs 120 crores per annum and by way of income tax and other taxes to the tune of Rs. 30 crores per annum. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 076 | (ii)Name of the EIA Consultant | Cholamandalam MS Risk Services Limited | (iii)Address | Parry House, 3rd Floor, No.2, NSC Bose Road, Chennai- 600001 | (iv)Mobile No. | 9677003778 | (v)Landline No. | 0444044562 | (vi)Email Id | bhaskarvs@cholams.murugappa.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 23 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Brij Mohan Dhiman | Designation | Senior General Manager- Commercial | Name of Company (Applicant Name should not be given here) | JK PAPER LTD | Address | PO CENTRAL PULP MILLS |
|