Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Maharashtra Enviro Power Limited
(b)Name of the Company / Organisation MAHARASHTRA ENVIRO POWER LIMITED
(c)Registered Address CHW-01, Butibori-Hingna, Nagpur, Maharashtra,,Nagpur,Maharashtra-441110
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Asif Hussain
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Maharashtra Enviro Power Limited, C/O. SMS Envocare Limited, 301, Pentagon P3, Magarpatta City, Hadapsar, Pune,,Pune City,Pune,Maharashtra-411028
(d)Pin code 411028
(e)E-mail rovena.anthony@smsl.co.in
(f)STD Code. 20(f)Telephone No. 66801111
(g)Fax No. 66801100
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIS/62901/2017
(d)Master Proposal Number(Single Window) SW/104399/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 56, MIDC Ranjangaon, Village-Ranjangaon,
(b)Pincode 412209
(c)Bounded Latitudes (North)
From
Degree 18
Minutes
Second
From
Degree 18
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74
Minutes
Second
From
Degree 74
Minutes
Second
(e)Survey of India Topo Sheet No. 47J1, 47J5, 47J6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 640
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraPuneShirur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-16/2017-IA-III
(c)Date of Apply of TOR 04 Mar 2017
(d)Date of Issue of TOR / Standard ToR 06 Jul 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located in Notified Industrial Are
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Common HWTSDF FacilityEnhancement of Incineration Capacity72 TPD to 152 TPD
(2.)Common HWTSDF FacilityInstallation of Common MEE200 KLD
(3.)Common HWTSDF FacilityInstallation of Common Spray Dryer200 KLD
(4.)Common HWTSDF FacilityInstallation of Cement pre-processing facility80 TPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hazardous Waste Incinerator152OthersTons per DayRoad
(2.)Common MEE200Kilo Litre per DayOthersTanker
(3.)Common Spray Dryer200Kilo Litre per DayOthersTanker
(4.)Secured Landfill60000Tons per AnnumRoad
(5.)Stand by Liquid Incinerator24OthersTons per DayRoad
(6.)Cement Pre-Processing Facility80OthersTons per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Jul 2016
(iv)Valid Upto 31 Oct 2020
(v)File No. BO/RO(HQ)/HWMD/EIC/NO. PN-27617-15/CR/CC-9363
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 119
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.95
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.8925
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.322
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 41.2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 41.2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coke2100Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(2.)Caustic Lye3000Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(3.)Hydrated Lime3000Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(4.)Activated Carbon360Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(5.)Misc. Auxiliary Chemicals300Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(6.)Limestone2400Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
(7.)Binding Chemicals1200Tons per AnnumLocal MarketRoad3 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 18 Sep 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube41.37.536.280
(2.)PM2.5Micro Gram per Meter Cube5812.556.760
(3.)SO2Micro Gram per Meter Cube47.84.740.480
(4.)PM10Micro Gram per Meter Cube119.323.8113.4100
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l32784865002000
(3.)Total Hardnessmg/l1215210200600
(4.)Chloridesmg/l562402501000
(5.)pHNA7.787.098.58.5
(6.)Fluoridemg/l0011.5
(7.)Heavy MetalsBoronmg/l1.560.720.51
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00A
(2.)CODmg/l00A
(3.)pHNA8.617.35A
(4.)DOmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.345.575
(2.)Leq(Night)A-weighted decibels(dB(A))67.740.770
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.727.66
(2.)P(Phosphorus)Milliequivalents per 100 Gram00
(3.)N(Nitrogen)Milliequivalents per 100 Gram00
(4.)Electric ConductivityOthersmmoh/cm1.8070.194
(5.)K(Potassium)Milliequivalents per 100 Gram2.261.13
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 6.5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Ranjangaon4990Copy of Permission LetterPipelineOthersMIDC Ranjangaon-19 Apr 2019499
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic4040Packaged STPGreen Belt Renewal Plant40
(2.)Industrial9292ETP with Tertiary TreatmentReuse within the Plant & Recycling92
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 132
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 132
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre0RoadOthersUsed as Lubricant or Sent to Recycler
(2.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Incineration AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3600Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)80Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)MEE Salt from Common MEEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1000Tons0RoadOthersLandfill or Salt Recovery
(6.)Spray Dryer SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2000Tons0RoadOthersLandfill or Salt Recovery
(7.)USed Drum/Barrels/Bags/ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0Tons0RoadOthersAuthorized Recycler or CHTSDF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)TSPMMicrogram per Meter Cube00.430.490.494150
(2.)PM10Microgram per Meter Cube00010
(3.)NOxMicrogram per Meter Cube230.351.3824.38394
(4.)SO2Microgram per Meter Cube31.80.421.1832.98840
(5.)PM2.5Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Plasma Gasification PlantLDO451.2OthersPM HCL SO2 CO TOC HF NOX Dioxin and Furan MetalsContinuous
(2.)Haz Waste IncineratorLDO451.5OthersPM HCL SO2 CO TOC HF NOx Dioxin and Furan MetalsContinuous
(3.)Spray DryerHot Air451.2OthersPM SOx NOx VOCsContinuous
(4.)Pre processing facilityNIL200.6OthersVOCsPartial
(5.)Hot Air GeneratorCoal301OthersPM SOx NOxContinuous
(6.)Steam BoilerCoal451.2OthersPM SOx NOxPartial
(7.)DG SetLDO100.1OthersPM SOx NOxPartial
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4500
(b)Source Maharashtra State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 320 KVA * 3 NOS
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 30
    Total Land (ha.) 30
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11750
(b)Waste/Barren Land (ha.) 813.22
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1636.52
(e)Settlements (ha.) 3724.28
(f)Industrial (ha.) 3843.68
(g)Forest (ha.) 4113.11
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Roads and Open shrub 5832.06
    Total (ha.) 31712.87
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt5.5884
(2.)Built Up Area0.631887Storage area, haz. waste storage, ETP area
(3.)OthersRoad, Open to Sky12.46191
(4.)LandFill9.107804
(5.)Main Plant2.209999Incinerator, MEE, Spray Dryer, Pre processing
Total (ha.) 30
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNo WLS within 10 kilometers0-
(2.)NPANo NPA within 10 kilometers0-
(3.)ESAsNo ESAs within 10 kilometers0-
(4.)ESZsNo ESZs in 10 kilometers0-
(5.)CorridorsNo Corridors within 10 kilometers0-
(6.)Critically Polluted AreaNo Critically Polluted Area within 10 kilometers0-
(7.)Wildlife CorridorsNo wildlife corridors in 10 kilometers0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNo Archaeological Sites within 10 kilometers0-
(2.)Defence InstallationsNo Defence Installation within 10 kilometers0-
(3.)ForestDagya Dongar Reserve Forest3.5Largest Reserve Forest within 10 km in North Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ghod Nadi
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 15
(e)No. of working days 25
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.5884
(b)Percentage of Total Project Area 18.63
(c)No. of Plants to be Planted 875
(d)Funds Allocated for Plantation 15
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed project will 60 new employment for surrounding area of project site.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2100 m2
5.
Energy Saving Measures:
(a)Source/Mode 0
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Not Applicable
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0122
(ii)Name of the EIA Consultant ENPRO Enviro Tech and Engineers Pvt. Ltd.
(iii)Address 306, Royal Park, Adajan Road, Surat-395 009, Gujarat, INDIA
(iv)Mobile No. 8160483760
(v)Landline No. 0261278961
(vi)Email Id enpro.eia@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 12 Jan 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAsif Hussain
DesignationDirector
Name of Company (Applicant Name should not be given here)MAHARASHTRA ENVIRO POWER LIMITED
Address20, IT Park, Parsodi, Nagpur
Print