1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Maharashtra Enviro Power Limited | (b)Name of the Company / Organisation | MAHARASHTRA ENVIRO POWER LIMITED | (c)Registered Address | CHW-01, Butibori-Hingna, Nagpur, Maharashtra,,Nagpur,Maharashtra-441110 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Asif Hussain | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Maharashtra Enviro Power Limited, C/O. SMS Envocare Limited, 301, Pentagon P3, Magarpatta City, Hadapsar, Pune,,Pune City,Pune,Maharashtra-411028 | (d)Pin code | 411028 | (e)E-mail | rovena.anthony@smsl.co.in | (f)STD Code. | 20(f)Telephone No. | 66801111 | (g)Fax No. | 66801100 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/MIS/62901/2017 | (d)Master Proposal Number(Single Window) | SW/104399/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot no. 56, MIDC Ranjangaon, Village-Ranjangaon, | (b)Pincode | 412209 | (c)Bounded Latitudes (North) | | From | | Degree | 18 | Minutes | | Second | | From | | Degree | 18 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74 | Minutes | | Second | | From | | Degree | 74 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47J1, 47J5, 47J6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 640 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7.1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Pune | Shirur | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-16/2017-IA-III | (c)Date of Apply of TOR | 04 Mar 2017 | (d)Date of Issue of TOR / Standard ToR | 06 Jul 2017 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project site is located in Notified Industrial Are | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Common HWTSDF Facility | Enhancement of Incineration Capacity | 72 TPD to 152 TPD | (2.) | Common HWTSDF Facility | Installation of Common MEE | 200 KLD | (3.) | Common HWTSDF Facility | Installation of Common Spray Dryer | 200 KLD | (4.) | Common HWTSDF Facility | Installation of Cement pre-processing facility | 80 TPD | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Hazardous Waste Incinerator | 152 | Others | Tons per Day | Road | | (2.) | Common MEE | 200 | Kilo Litre per Day | | Others | Tanker | (3.) | Common Spray Dryer | 200 | Kilo Litre per Day | | Others | Tanker | (4.) | Secured Landfill | 60000 | Tons per Annum | | Road | | (5.) | Stand by Liquid Incinerator | 24 | Others | Tons per Day | Road | | (6.) | Cement Pre-Processing Facility | 80 | Others | Tons per Day | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 22 Jul 2016 | (iv)Valid Upto | 31 Oct 2020 | (v)File No. | BO/RO(HQ)/HWMD/EIC/NO. PN-27617-15/CR/CC-9363 | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 119 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.95 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.8925 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.322 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 41.2 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 41.2 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coke | 2100 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (2.) | Caustic Lye | 3000 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (3.) | Hydrated Lime | 3000 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (4.) | Activated Carbon | 360 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (5.) | Misc. Auxiliary Chemicals | 300 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (6.) | Limestone | 2400 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | (7.) | Binding Chemicals | 1200 | Tons per Annum | | Local Market | Road | | 3 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 18 Sep 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 41.3 | 7.5 | 36.2 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58 | 12.5 | 56.7 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 47.8 | 4.7 | 40.4 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 119.3 | 23.8 | 113.4 | 100 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 3278 | 486 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 1215 | 210 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 562 | 40 | 250 | 1000 | (5.) | pH | | | NA | | 7.78 | 7.09 | 8.5 | 8.5 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | Heavy Metals | | Boron | mg/l | | 1.56 | 0.72 | 0.5 | 1 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 0 | 0 | A | (2.) | COD | | mg/l | | 0 | 0 | A | (3.) | pH | | NA | | 8.61 | 7.35 | A | (4.) | DO | | mg/l | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.3 | 45.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 67.7 | 40.7 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.72 | 7.66 | (2.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 0 | 0 | (3.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 0 | 0 | (4.) | Electric Conductivity | Others | mmoh/cm | 1.807 | 0.194 | (5.) | K(Potassium) | Milliequivalents per 100 Gram | | 2.26 | 1.13 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.5 To 6.5 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC Ranjangaon | 499 | 0 | Copy of Permission Letter | Pipeline | | Others | MIDC Ranjangaon | - | 19 Apr 2019 | 499 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 40 | 40 | Packaged STP | Green Belt Renewal Plant | | 40 | | (2.) | Industrial | 92 | 92 | ETP with Tertiary Treatment | Reuse within the Plant & Recycling | | 92 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 132 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 132 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.05 | Kilolitre | 0 | Road | | Others | Used as Lubricant or Sent to Recycler | (2.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 600 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Incineration Ash | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3600 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 80 | Tons | 0 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | MEE Salt from Common MEE | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1000 | Tons | 0 | Road | | Others | Landfill or Salt Recovery | (6.) | Spray Dryer Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2000 | Tons | 0 | Road | | Others | Landfill or Salt Recovery | (7.) | USed Drum/Barrels/Bags/Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0 | Tons | 0 | Road | | Others | Authorized Recycler or CHTSDF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | TSPM | Microgram per Meter Cube | 0 | 0.43 | 0.49 | 0.494 | 150 | (2.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (3.) | NOx | | Microgram per Meter Cube | 23 | 0.35 | 1.38 | 24.383 | 94 | (4.) | SO2 | | Microgram per Meter Cube | 31.8 | 0.42 | 1.18 | 32.988 | 40 | (5.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Plasma Gasification Plant | LDO | 45 | 1.2 | Others | PM HCL SO2 CO TOC HF NOX Dioxin and Furan Metals | Continuous | (2.) | Haz Waste Incinerator | LDO | 45 | 1.5 | Others | PM HCL SO2 CO TOC HF NOx Dioxin and Furan Metals | Continuous | (3.) | Spray Dryer | Hot Air | 45 | 1.2 | Others | PM SOx NOx VOCs | Continuous | (4.) | Pre processing facility | NIL | 20 | 0.6 | Others | VOCs | Partial | (5.) | Hot Air Generator | Coal | 30 | 1 | Others | PM SOx NOx | Continuous | (6.) | Steam Boiler | Coal | 45 | 1.2 | Others | PM SOx NOx | Partial | (7.) | DG Set | LDO | 10 | 0.1 | Others | PM SOx NOx | Partial | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4500 | (b)Source | Maharashtra State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 320 KVA * 3 NOS | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 30 | Total Land (ha.) | 30 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 11750 | (b)Waste/Barren Land (ha.) | 813.22 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1636.52 | (e)Settlements (ha.) | 3724.28 | (f)Industrial (ha.) | 3843.68 | (g)Forest (ha.) | 4113.11 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Roads and Open shrub | 5832.06 | Total (ha.) | 31712.87 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 5.5884 | | (2.) | Built Up Area | | 0.631887 | Storage area, haz. waste storage, ETP area | (3.) | Others | Road, Open to Sky | 12.46191 | | (4.) | LandFill | | 9.107804 | | (5.) | Main Plant | | 2.209999 | Incinerator, MEE, Spray Dryer, Pre processing | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | No WLS within 10 kilometers | 0 | - | (2.) | NPA | No NPA within 10 kilometers | 0 | - | (3.) | ESAs | No ESAs within 10 kilometers | 0 | - | (4.) | ESZs | No ESZs in 10 kilometers | 0 | - | (5.) | Corridors | No Corridors within 10 kilometers | 0 | - | (6.) | Critically Polluted Area | No Critically Polluted Area within 10 kilometers | 0 | - | (7.) | Wildlife Corridors | No wildlife corridors in 10 kilometers | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | No Archaeological Sites within 10 kilometers | 0 | - | (2.) | Defence Installations | | No Defence Installation within 10 kilometers | 0 | - | (3.) | Forest | | Dagya Dongar Reserve Forest | 3.5 | Largest Reserve Forest within 10 km in North Direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ghod Nadi | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 5.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 15 | (e)No. of working days | 25 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 5.5884 | (b)Percentage of Total Project Area | 18.63 | (c)No. of Plants to be Planted | 875 | (d)Funds Allocated for Plantation | 15 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Proposed project will 60 new employment for surrounding area of project site. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 2100 m2 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | 0 | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0122 | (ii)Name of the EIA Consultant | ENPRO Enviro Tech and Engineers Pvt. Ltd. | (iii)Address | 306, Royal Park, Adajan Road, Surat-395 009, Gujarat, INDIA | (iv)Mobile No. | 8160483760 | (v)Landline No. | 0261278961 | (vi)Email Id | enpro.eia@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 12 Jan 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |