|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Total Production Capacity and augmentation of integrating melting and rolling facility (from 54,000 TPA to 92,500 TPA) by M/s. Kundlas Loh Udyog located at Village Balyana, Post Barotiwal | (b)Name of the Company / Organisation | KUNDLAS LOH UDYOG | (c)Registered Address | Vill: Baliana, Post: Barotiwala, Tehsil: Baddi,,Solan,Himachal Pradesh-141001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajeev Singla | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Vill- Baliana, Post-Barotiwala, Tehsil-Baddi, Dist-Solan, HP,,Baddi,Solan,Himachal Pradesh-141001 | (d)Pin code | 141001 | (e)E-mail | kundlaslohudyog123@gmail.com | (f)STD Code. | 9816(f)Telephone No. | 666000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HP/IND/65822/2017 | (d)Master Proposal Number(Single Window) | SW/104519/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 414, 415, 416, 418, 133 | (b)Pincode | 141001 | (c)Bounded Latitudes (North) | | From | | Degree | 30.91618 | Minutes | | Second | | From | | Degree | 30.91652 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.83292 | Minutes | | Second | | From | | Degree | 76.83297 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53B13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 447 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 10 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Himachal Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Himachal Pradesh | Solan | Baddi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/350/2017-IA-II(I) | (b)Date of Apply of TOR | 30 Jun 2017 | (c)Date of Issue of TOR / Standard ToR | 19 Sep 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 04 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Mauza Baliana | State : | Himachal Pradesh | District : | Solan | Tehsil : | Baddi | Village : | Baliana |
| 100 | raised issue
regarding
smoke
emission
from these
kind of iron
and steel
units and
emphasized
upon further
improvisation
in the air
pollution
control
devices
asked the
consultant
regar | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Integrated Melting and Rolling facility | 92500 MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | TMT Bars | 92500 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 23 Sep 2018 | (iv)Valid Upto | 31 Mar 2021 | (v)File No. | No. HPSPCB / PCB-ID15312/8069-71 | (vi)Application No. | 8069 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10.20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.56 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.135 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.08 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 102300 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 102300 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | MS Scrap | 102300 | Tons per Annum | | India | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 58.93 | 30.02 | 58.67 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 16.15 | 6.25 | 16.08 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 33.34 | 17.55 | 33.25 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 87.57 | 60.59 | 86.86 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.84 | 7.41 | 6.5 | 8.5 | (2.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 360 | 336 | 500 | 2000 | (4.) | Chlorides | | | mg/l | | 33.98 | 25.48 | 250 | 1000 | (5.) | Heavy Metals | | Zinc | mg/l | | 0.46 | 0.17 | 5 | 15 | (6.) | Total Hardness | | | mg/l | | 239.81 | 190.87 | 200 | 600 | (7.) | Fluoride | | | mg/l | | 0.81 | 0.27 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.5 | 4.5 | B | (2.) | BOD | | mg/l | | 28.07 | 3.28 | B | (3.) | COD | | mg/l | | 116.14 | 20.74 | B | (4.) | pH | | NA | | 7.85 | 7.71 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.4 | 50.61 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 65.03 | 58.3 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 334 | 312 | (2.) | P(Phosphorus) | Kilogram per hectare | | 5.8 | 4.5 | (3.) | K(Potassium) | Kilogram per hectare | | 0 | 0 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.16 | 0.11 | (5.) | pH | | | 7.85 | 7.48 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 28.76 To 5.01 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 27.57 To 3.02 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 65 | 0 | Copy of Permission Letter | modeOthers | Borewell | Others | Borewell | 00 | 06 Apr 2019 | 65 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Waste | 7 | 8 | STP | Green Belt Renewal Plant | | 7 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | APCD Dust | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 264 | Tons | 50 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Mill Scale | Others | Mill Scale | 3630 | Tons | 50 | Road | | Authorized Recyclers | | (3.) | Slag | Industrial Waste | | 6930 | Tons | 40 | Road | | Others | Metal extract from slag and send to Paber industry | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 87.57 | 1.414 | 1.23 | 88.9 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 16.15 | 1.414 | 0 | 16.151 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 58.93 | 1.414 | 0 | 58.94 | 60 | (4.) | NOx | | Microgram per Meter Cube | 33.34 | 1.414 | 0 | 33.341 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Furnace | Induction Heating | 30 | 0.45 | PM10 | | 88.8 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 11000 | (b)Source | HPSEB | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 x 125 KVA | (e)Stack Height (in m) | 8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.7789 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.7789 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 8065 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 80 | (e)Settlements (ha.) | 3320 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 19945 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrub | 0 | Total (ha.) | 31410 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.3108 | | (2.) | Green belt | | 0.26 | | (3.) | Others | Open Area | 0.2081 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | ESAs | None | 0 | NA | (3.) | Wildlife Corridors | None | 0 | NA | (4.) | Corridors | Noe | 0 | NA | (5.) | NPA | None | 0 | NA | (6.) | WLS | NA | 0 | NA | (7.) | ESZs | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None | 0 | NA | (2.) | Archaeological Sites | | None | 0 | NA | (3.) | Forest | | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.7789 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sirsa River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 3.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 321 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 321 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.26 | (b)Percentage of Total Project Area | 33.38 | (c)No. of Plants to be Planted | 750 | (d)Funds Allocated for Plantation | 500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will create extra opportunities of direct and indirect employment for
which skilled and unskilled manpower will be needed | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0040 | (ii)Name of the EIA Consultant | Shivalik Solid Waste Management Limited | (iii)Address | SCO 20-21, II floor, Near Hotel Dolphin, Baltana, Zirakpur (Punjab) 140 604 | (iv)Mobile No. | 8288079363 | (v)Landline No. | 0176250949 | (vi)Email Id | s.brahma@beil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 16 Aug 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Our Project for Expansion of Total Production Capacity and augmentation of integrating melting and rolling facility (from 54,000 TPA to 92,500 TPA) by M/s. Kundlas Loh Udyog was Re-considered for appraisal of environmental clearance in the 13thmeeting Re-constituted EAC (Industry-I) held on 27th November, 2019 at item No. 13.2 wherein the EAC had rose some observations. The point-wise reply of observations is as follow | 07 Jan 2020 | 2. | NA | Nil | 18 Dec 2019 | 3. | NA | Nil | 17 Dec 2019 | 4. | ADS Reply Letter | Additional information asked in 7th EAC meeting(Ind.1)held on 30.05.19 | 16 Oct 2019 | 5. | NA | NIL | 14 Jun 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rajeev Singla | Designation | Partner | Name of Company (Applicant Name should not be given here) | KUNDLAS LOH UDYOG | Address | Vill: Baliana, Post: Barotiwala, Tehsil: Baddi |
|