1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | EIA Study for Development of Passenger Ropeway between Palchan and Rohtang,Himachal Pradesh | (b)Name of the Company / Organisation | MANALI ROPEWAYS PRIVATE LIMITED | (c)Registered Address | Solang Nala, Post Office Palchan, Tehsil Manali,,Kullu,Himachal Pradesh-175103 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Suresh Singh Pathania | (b)Designation (Owner/ Partner/ CEO) | Project Head | (c)Address | Solang Nala, Post Office Palcha, Tehsil Manali,,Manali(T),Kullu,Himachal Pradesh-175103 | (d)Pin code | 175103 | (e)E-mail | sspathania@tata.com | (f)STD Code. | 22(f)Telephone No. | 66100052 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(g) Aerial ropeways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HP/MIS/104323/2016 | (d)Master Proposal Number(Single Window) | SW/104302/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | kothi 567,568,569,570 ;Gulaba :Tukda no 3 to 6,Ma | (b)Pincode | 175103 | (c)Bounded Latitudes (North) | | From | | Degree | 32199.20 | Minutes | | Second | | From | | Degree | 322152.37 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 771137.4 | Minutes | | Second | | From | | Degree | 771443.41 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 52H/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 3985.47 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Himachal Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-52/2016-IA.III | (c)Date of Apply of TOR | 30 Jun 2016 | (d)Date of Issue of TOR / Standard ToR | 20 Sep 2016 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | All linear projects in border states PH is Exempte | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Passanger aerial ropeway | Monocable Detachable Grip Gondola System | carbon credit | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 9 | 1 | Hectares | | Arial Ropeway | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Apr 2019 | (iv)Valid Upto | 30 Apr 2019 | (v)File No. | not applicable | (vi)Application No. | not applicable | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 584 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.785 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.84 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.24 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 335 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 335 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Reinforcement Steel | 57.23 | Tons per Annum | | Local | Road | | 60 | Linkage | | Copy of Linkage | (2.) | Sand | 808 | Tons per Annum | | Local | Road | | 40 | Linkage | | Copy of Linkage | (3.) | Structural Steel | 57.23 | Tons per Annum | | Local | Road | | 60 | Linkage | | Copy of Linkage | (4.) | Haulage rope | 33.23 | Tons per Annum | | Imported | Others | Sea/Road | 7000 | Linkage | | Copy of Linkage | (5.) | Steel for tower | 48 | Tons per Annum | | Imported | Others | Sea/Road | 7000 | Linkage | | Copy of Linkage | (6.) | Coarse Aggregate | 1423.07 | Tons per Annum | | Local | Road | | 40 | Linkage | | Copy of Linkage | (7.) | cement | 280 | Tons per Annum | | Local | Road | | 130 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 05 Oct 2016 To 27 Nov 2016 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 44.2 | 30.5 | 44.2 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.26 | 6.29 | 9.19 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 16.3 | 10.5 | 15.90 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 1.5 | 1.5 | 1.5 | 2 | (5.) | PM10 | | Micro Gram per Meter Cube | 63.1 | 41.3 | 62.75 | 100 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | arsenic | mg/l | | 0.019 | 0.0 | 0.002 | 0.002 | (2.) | TSS | | | mg/l | | 37 | 3 | 500 | 500 | (3.) | TDS | | | mg/l | | 112 | 31 | 500 | 2000 | (4.) | Heavy Metals | | cadmium | mg/l | | 0.0 | 0.0 | 0.003 | 0.003 | (5.) | Total Hardness | | | mg/l | | 75.8 | 12 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 14.4 | 8.6 | 250 | 1000 | (7.) | Heavy Metals | | mercury | mg/l | | 0.0 | 0.0 | 0.0002 | 0.0002 | (8.) | pH | | | NA | | 7.53 | 6.56 | 8.5 | 8.5 | (9.) | Fluoride | | | mg/l | | 0.99 | 0.1 | 1 | 1.5 | (10.) | Heavy Metals | | chromium | mg/l | | 0.02 | 0.001 | .05 | 0.05 | (11.) | Others | nitrate | | mg/l | | 1.2 | 1 | 45 | 45 | (12.) | Heavy Metals | | lead | mg/l | | 0.0 | 0.0 | 0.002 | 0.002 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6 | 5.9 | B | (2.) | Others | coliform count | Others | MPN/100 ml | 43 | 35 | B | (3.) | pH | | NA | | 8.09 | 7.48 | B | (4.) | COD | | mg/l | | 16 | 8 | B | (5.) | BOD | | mg/l | | 7 | 3 | B | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.9 | 57.3 | National Ambient Noise Standards | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.4 | 44.6 | National Ambient Noise Standards | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 367 | 208 | (2.) | P(Phosphorus) | Kilogram per hectare | | 33.1 | 23.18 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.36 | 0.17 | (4.) | pH | | | 6.9 | 5.22 | (5.) | K(Potassium) | Milligram per Kilogram | | 128.45 | 106.54 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.18 To 5.16 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.98 To 7.31 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tapping of Near by Nalla | 112 | 1 | Copy of Permission Letter | Pipeline | | Others | Tapping | 510-11 | 22 Jul 2019 | 112 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | WC | 90 | 100 | Packaged STP | Reuse within the Plant & Recycling,Others | REused in Toilet Flushing and plantation | 76 | 14 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 90 | (b)Total Discharged Water (Kilolitre per Day) | 14 | (c)Total Reused Water (Kilolitre per Day) | 76 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid waste | Municipal Solid Waste | | 243 | Tons | 14 | Others | covered truck | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | Others(Specify) | CO | Microgram per Meter Cube | 1.15 | 0.54 | 0.45 | 1.6 | 2 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.2 | 0.51 | 0.069 | 44.27 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 9.19 | 0.51 | 0.72 | 9.92 | 80 | (4.) | NOx | | Microgram per Meter Cube | 15.90 | 0.51 | 4.47 | 20.38 | 80 | (5.) | PM10 | | Microgram per Meter Cube | 62.75 | .51 | 0.114 | 63.864 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | Others | Not Relevant | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2240 | (b)Source | Himachal Pradesh State Electicity Board | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 5 No of DG set of capacity 50 KVA(2 Nos) and 1000 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 9 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.00001 | (b)Waste/Barren Land (ha.) | 0.00001 | (c)Grazing/ Community Land (ha.) | 0.00001 | (d)Surface Water Bodies (ha.) | 0.00001 | (e)Settlements (ha.) | 0.00001 | (f)Industrial (ha.) | 0.00001 | (g)Forest (ha.) | 8.9899 | (h)Mangroves (ha.) | 0.00001 | (i)Marine Area (ha.) | 0.00001 | (j)Others (ha.) : NA | 0.00001 | Total (ha.) | 8.989989999999999 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Aerial Passenger Ropeway | 8.9899 | Nil | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Not Applicable | 0 | NA | (2.) | Critically Polluted Area | Not Applicable | 0 | NA | (3.) | Wildlife Corridors | Not Applicable | 0 | NA | (4.) | ESZs | Not Applicable | 0 | NA | (5.) | WLS | Manali Wildlife sanctuary | 6.92 | MWLS possesses many varieties of Himalayan wildlife species | (6.) | ESAs | Not Applicable | 0 | NA | (7.) | Corridors | Not Applicable | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | nil | 0 | NA | (2.) | Archaeological Sites | | nil | 0 | NA | (3.) | Forest | | DPF in two stretches and UPF in one streach | 0 | Manali forest range,Kullu forest division | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Protected | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 8.9899 | (c)Status of Land acquisition if not acquired | FC-Stage-I | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Panthera pardus andUrsus thibetanus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Raolikhol,Shikharikhol,Beas River(Bet Gulaba Marhi) and Rani ka Nala (bet Marhi-Rohtang).these water bodies crossing the alignment | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Beas Spring (approx.100m North of Rohtang Upper Terminal), Chenab River (approx.3km North of Rohtang Upper terminal),Beas River(within 100m east of alignment),KhanoraNala and Siander Nala :approx.1km South-east of Kothi,KholaNala(approx 1km),SaraiNala(approx.1.5km),Patalsu/GhararhNala(3km),ShalasarNala(1km)West of alignment | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 58 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 6 | (f)Total Manpower | 158 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.56 | (b)Percentage of Total Project Area | 6.22 | (c)No. of Plants to be Planted | 1100 | (d)Funds Allocated for Plantation | 22900000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Reduction in carbon emission | (2.) | Social | Increase in Tourism Potential ,Increase in Employment Opportunities,Improvement in Aesthetics ,Better Connectivity,Cheaper mode of Transport , Reduced Distance and Saving of Time | (3.) | Financial | Revenue Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 21 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 8 | (d)Total plot area (sqm) | 21072 | (e)Total built up area (sqm) | 35499 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 2 | (b)Capacity | 600 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Buses-20,Cars-300 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar/LED | (b)Percentage | 6.2 | (c)Quantity | 182 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0056 | (ii)Name of the EIA Consultant | RITES Ltd | (iii)Address | Plot No:1,Sector-29,Gurgaon-122001 | (iv)Mobile No. | 8800218003 | (v)Landline No. | 0124281872 | (vi)Email Id | ue.rites@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 21 Aug 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per EIA/EMP report, following needs to be submitted;
1. As per the ToR condition No. xiii- “Public hearing to be conducted and issues raised and commitments made by the project proponent on the same should be included in EIA/EMP Report in the form of tabular chart with financial budget for complying with the commitments made. No details has been provided regarding Public Hearing”. However, in the Point wise ToR compliance in the EIA report it is claimed that MoEF&CC vide circular dated 23.10.2017 has considered ropeway project as linear project. Kindly submit the copy of circular dated 23.10.2017.
2. All the annexure as mentioned in the EIA/EMP report including Forest Clearance and justification for non requirement of Wildlife Clearance.
3. S.No./paras of headings mentioned in Chapter 2 of the EIA/EMP report is not in order.
4. Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 09 Sep 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Suresh Singh Pathania | Designation | Project Head | Name of Company (Applicant Name should not be given here) | MANALI ROPEWAYS PRIVATE LIMITED | Address | Solang Nala, Post Office Palchan, Tehsil Manali |
|