Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EIA Study for Development of Passenger Ropeway between Palchan and Rohtang,Himachal Pradesh
(b)Name of the Company / Organisation MANALI ROPEWAYS PRIVATE LIMITED
(c)Registered Address Solang Nala, Post Office Palchan, Tehsil Manali,,Kullu,Himachal Pradesh-175103
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Suresh Singh Pathania
(b)Designation (Owner/ Partner/ CEO) Project Head
(c)Address Solang Nala, Post Office Palcha, Tehsil Manali,,Manali(T),Kullu,Himachal Pradesh-175103
(d)Pin code 175103
(e)E-mail sspathania@tata.com
(f)STD Code. 22(f)Telephone No. 66100052
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(g) Aerial ropeways
Minor Activity
(b)Category A
(c)Proposal Number IA/HP/MIS/104323/2016
(d)Master Proposal Number(Single Window) SW/104302/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. kothi 567,568,569,570 ;Gulaba :Tukda no 3 to 6,Ma
(b)Pincode 175103
(c)Bounded Latitudes (North)
From
Degree 32199.20
Minutes
Second
From
Degree 322152.37
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 771137.4
Minutes
Second
From
Degree 771443.41
Minutes
Second
(e)Survey of India Topo Sheet No. 52H/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 3985.47
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-52/2016-IA.III
(c)Date of Apply of TOR 30 Jun 2016
(d)Date of Issue of TOR / Standard ToR 20 Sep 2016
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason All linear projects in border states PH is Exempte
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Passanger aerial ropewayMonocable Detachable Grip Gondola Systemcarbon credit
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)91HectaresArial Ropeway
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Apr 2019
(iv)Valid Upto 30 Apr 2019
(v)File No. not applicable
(vi)Application No. not applicable
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 584
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.785
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.84
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.24
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 335
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 335
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Reinforcement Steel57.23Tons per AnnumLocalRoad60 LinkageCopy of Linkage
(2.)Sand808Tons per AnnumLocalRoad40 LinkageCopy of Linkage
(3.)Structural Steel57.23Tons per AnnumLocalRoad60 LinkageCopy of Linkage
(4.)Haulage rope33.23Tons per AnnumImportedOthersSea/Road7000 LinkageCopy of Linkage
(5.)Steel for tower48Tons per AnnumImportedOthersSea/Road7000 LinkageCopy of Linkage
(6.)Coarse Aggregate1423.07Tons per AnnumLocalRoad40 LinkageCopy of Linkage
(7.)cement280Tons per AnnumLocalRoad130 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Oct 2016 To 27 Nov 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.230.544.260
(2.)SO2Micro Gram per Meter Cube9.266.299.1980
(3.)NOxMicro Gram per Meter Cube16.310.515.9080
(4.)OthersCOMili Gram per Meter Cube1.51.51.52
(5.)PM10Micro Gram per Meter Cube63.141.362.75100
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy Metalsarsenicmg/l0.0190.00.0020.002
(2.)TSSmg/l373500500
(3.)TDSmg/l112315002000
(4.)Heavy Metalscadmiummg/l0.00.00.0030.003
(5.)Total Hardnessmg/l75.812200600
(6.)Chloridesmg/l14.48.62501000
(7.)Heavy Metalsmercurymg/l0.00.00.00020.0002
(8.)pHNA7.536.568.58.5
(9.)Fluoridemg/l0.990.111.5
(10.)Heavy Metalschromiummg/l0.020.001.050.05
(11.)Othersnitratemg/l1.214545
(12.)Heavy Metalsleadmg/l0.00.00.0020.002
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l65.9B
(2.)Otherscoliform countOthersMPN/100 ml4335B
(3.)pHNA8.097.48B
(4.)CODmg/l168B
(5.)BODmg/l73B
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.957.3National Ambient Noise Standards
(2.)Leq(Night)A-weighted decibels(dB(A))52.444.6National Ambient Noise Standards
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare367208
(2.)P(Phosphorus)Kilogram per hectare33.123.18
(3.)Electric ConductivityMillisiemens per Centimetre0.360.17
(4.)pH6.95.22
(5.)K(Potassium)Milligram per Kilogram128.45106.54
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.18 To 5.16
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.98 To 7.31
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTapping of Near by Nalla1121Copy of Permission LetterPipelineOthersTapping510-1122 Jul 2019112
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)WC90100Packaged STPReuse within the Plant & Recycling,OthersREused in Toilet Flushing and plantation7614
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 90
(b)Total Discharged Water (Kilolitre per Day) 14
(c)Total Reused Water (Kilolitre per Day) 76
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid wasteMunicipal Solid Waste243Tons14Otherscovered truckSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube1.150.540.451.62
(2.)PM2.5Microgram per Meter Cube44.20.510.06944.2760
(3.)SO2Microgram per Meter Cube9.190.510.729.9280
(4.)NOxMicrogram per Meter Cube15.900.514.4720.3880
(5.)PM10Microgram per Meter Cube62.75.510.11463.864100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNot Relevant0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2240
(b)Source Himachal Pradesh State Electicity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 5 No of DG set of capacity 50 KVA(2 Nos) and 1000
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 9
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.00001
(b)Waste/Barren Land (ha.) 0.00001
(c)Grazing/ Community Land (ha.) 0.00001
(d)Surface Water Bodies (ha.) 0.00001
(e)Settlements (ha.) 0.00001
(f)Industrial (ha.) 0.00001
(g)Forest (ha.) 8.9899
(h)Mangroves (ha.) 0.00001
(i)Marine Area (ha.) 0.00001
(j)Others (ha.) : NA 0.00001
    Total (ha.) 8.989989999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersAerial Passenger Ropeway8.9899Nil
Total (ha.) 8.9899
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANot Applicable0NA
(2.)Critically Polluted AreaNot Applicable0NA
(3.)Wildlife CorridorsNot Applicable0NA
(4.)ESZsNot Applicable0NA
(5.)WLSManali Wildlife sanctuary6.92MWLS possesses many varieties of Himalayan wildlife species
(6.)ESAsNot Applicable0NA
(7.)CorridorsNot Applicable0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil0NA
(2.)Archaeological Sitesnil0NA
(3.)ForestDPF in two stretches and UPF in one streach0Manali forest range,Kullu forest division
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 8.9899
(c)Status of Land acquisition if not acquired FC-Stage-I
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Panthera pardus andUrsus thibetanus
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Raolikhol,Shikharikhol,Beas River(Bet Gulaba Marhi) and Rani ka Nala (bet Marhi-Rohtang).these water bodies crossing the alignment
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Beas Spring (approx.100m North of Rohtang Upper Terminal), Chenab River (approx.3km North of Rohtang Upper terminal),Beas River(within 100m east of alignment),KhanoraNala and Siander Nala :approx.1km South-east of Kothi,KholaNala(approx 1km),SaraiNala(approx.1.5km),Patalsu/GhararhNala(3km),ShalasarNala(1km)West of alignment
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 58
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 158
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.56
(b)Percentage of Total Project Area 6.22
(c)No. of Plants to be Planted 1100
(d)Funds Allocated for Plantation 22900000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalReduction in carbon emission
(2.)SocialIncrease in Tourism Potential ,Increase in Employment Opportunities,Improvement in Aesthetics ,Better Connectivity,Cheaper mode of Transport , Reduced Distance and Saving of Time
(3.)FinancialRevenue Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 21
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 8
(d)Total plot area (sqm) 21072
(e)Total built up area (sqm) 35499
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 600
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Buses-20,Cars-300
5.
Energy Saving Measures:
(a)Source/Mode Solar/LED
(b)Percentage 6.2
(c)Quantity 182
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0056
(ii)Name of the EIA Consultant RITES Ltd
(iii)Address Plot No:1,Sector-29,Gurgaon-122001
(iv)Mobile No. 8800218003
(v)Landline No. 0124281872
(vi)Email Id ue.rites@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per EIA/EMP report, following needs to be submitted; 1. As per the ToR condition No. xiii- “Public hearing to be conducted and issues raised and commitments made by the project proponent on the same should be included in EIA/EMP Report in the form of tabular chart with financial budget for complying with the commitments made. No details has been provided regarding Public Hearing”. However, in the Point wise ToR compliance in the EIA report it is claimed that MoEF&CC vide circular dated 23.10.2017 has considered ropeway project as linear project. Kindly submit the copy of circular dated 23.10.2017. 2. All the annexure as mentioned in the EIA/EMP report including Forest Clearance and justification for non requirement of Wildlife Clearance. 3. S.No./paras of headings mentioned in Chapter 2 of the EIA/EMP report is not in order. 4. Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 09 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSuresh Singh Pathania
DesignationProject Head
Name of Company (Applicant Name should not be given here)MANALI ROPEWAYS PRIVATE LIMITED
AddressSolang Nala, Post Office Palchan, Tehsil Manali
Print