Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) ESTABLISHMENT OF INTEGRATED SUGAR INDUSTRY (Sugar 5000 TCD, Cogeneration 29.5 MW, Grain based distillery 45 KLPD & Molasses/sugarcane juice/ Sugar Beet based distillery 60 KLPD)
(b)Name of the Company / Organisation VITTHAL REFINED SUGARS LTD.
(c)Registered Address At post Nimgaon, Tal. Madha, Dist. Solapur,,,Solapur,Maharashtra-413210
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant vikramsinh Babanrao Shinde
(b)Designation (Owner/ Partner/ CEO) Chairman
(c)Address At post Nimgaon, Tal. Madha, Dist. Solapur,,Madha,Solapur,Maharashtra-413210
(d)Pin code 413210
(e)E-mail vrslsugar555@gmail.com
(f)STD Code. 217(f)Telephone No. 00000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/82830/2018
(d)Master Proposal Number(Single Window) SW/104126/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 235, 238, 247, 248, 252, 254, 256
(b)Pincode 413208
(c)Bounded Latitudes (North)
From
Degree 18.405584
Minutes
Second
From
Degree 75.218196
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 18.403682
Minutes
Second
From
Degree 75.220973
Minutes
Second
(e)Survey of India Topo Sheet No. 47N/3 and 47N/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 584
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSolapurKarmala
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/335/2018-IA-II(I)
(b)Date of Apply of TOR 17 Nov 2018
(c)Date of Issue of TOR / Standard ToR 24 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 May 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Jun 2017
Distance of Public Hearing Venue from the Proposed Project :0
factory site, village Pande
State :Maharashtra
District :Solapur
Tehsil :Karmala
Village :Pande
90discussion on Pollution and industry establishment effect on Kamalaaai temple, treatment of waste water, odour managementOthersAdditional district Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Grain based distillery45 KLPDNone
(2.)Sugar5000 TCDNone
(3.)Co-generation29.5 MWNone
(4.)IMFL Bottling plant100000 Cases/MNone
(5.)Molasses and sugarcane juice distillery60 KLPDNone
(6.)Country liquor bottling plant200000 Cases/MNone
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Grape Spirit5Kilo Litre per DayRoad
(2.)Malt Spirit5Kilo Litre per DayRoad
(3.)IMFL Bottling plant1OthersCases/MRoad
(4.)Power plant29.5Mega Watt(MW)Road
(5.)Molasses based distillery Unit60Kilo Litre per DayRoad
(6.)Distillery CO2 Recovery Plant50Tons Crushed per DayRoad
(7.)Cyclodextrin Plant2.5OthersTPDRoad
(8.)Sugar Unit5000Tons Crushed per DayRoad
(9.)Grain based distillery45Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Mar 2019
(iv)Valid Upto 31 Jul 2021
(v)File No. Format 1.0/BO/CAC-CELL/UAN no.0000052215/R/CAC-190
(vi)Application No. UAN No.0000052215
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 305.86
(b) Funds Allocated for Environment Management (Capital) (in Crores) 12.95
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.4735
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lime1280Tons per Annumnear by marketRoad100 Open MarketCopy of Linkage
(2.)Sugar cane800000Tons per Annumcommand areaRoad50 Open MarketCopy of Linkage
(3.)Alpha- Amylase16875Tons per AnnummarketRoad100 Open MarketCopy of Linkage
(4.)Barley for malting3900Tons per AnnummarketRoad100 Open MarketCopy of Linkage
(5.)Grapes for grape spirit23400Tons per AnnumMarketRoad100 Open MarketCopy of Linkage
(6.)Bagasse221952Tons per Annumown factoryRoad0 OthersOwnCopy of Linkage
(7.)Lubricant (oil & grease)150Kilo Litre per DaymarketRoad50 Open MarketCopy of Linkage
(8.)Molasses72900Tons per Annumown factory+ from otherRoad40 Othersown factory+ from otherCopy of Linkage
(9.)Grains31200Tons per Annumcommand area- nearby villagesRoad100 Open MarketCopy of Linkage
(10.)Gluco- amylase16875Tons per AnnummarketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube49.129.648.7100
(2.)NOxMicro Gram per Meter Cube16.210.414.380
(3.)SO2Micro Gram per Meter Cube13.26.210.380
(4.)PM2.5Micro Gram per Meter Cube39.328.238.860
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l001.01.5
(2.)Total Hardnessmg/l192.0141.5200600
(3.)Chloridesmg/l63.5234.22501000
(4.)TDSmg/l494384500500
(5.)pHNA7.767.246.58.5
(6.)TSSmg/l5500
(7.)Heavy MetalsLeadOthersppm000.010.01
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.25.8A
(2.)CODmg/l55A
(3.)BODmg/l11A
(4.)pHNA7.537.32A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.650.255
(2.)Leq(Night)A-weighted decibels(dB(A))43.438.245
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare164.2136.4
(2.)P(Phosphorus)Kilogram per hectare20.210.7
(3.)K(Potassium)Kilogram per hectare268.4180.4
(4.)Electric ConductivityOthersµs/cm667.3412.2
(5.)pH7.977.57
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 19.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1812.447Copy of Permission LetterPipelineIntake Well194408 Apr 20152645
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)45 KLPD grain based Distillery4581000anaerobic followed by aerobicReuse within the Plant & Recycling458
(2.)60 KLPD Molasses based Distillery6971000anaerobic followed by aerobicReuse within the Plant & Recycling697
(3.)Domestic180180MBBR/septic tank/Soak pitReuse within the Plant & Recycling180
(4.)Sugar545.281000Aerobic anaerobic treatmentReuse within the Plant & Recycling545.28
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1880.28
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1880.28
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeIndustrial Waste52Tons0RoadOthersDrying beds & compost
(2.)Incineration boiler ashIndustrial Waste25218Tons0RoadOthersTo brick manufacturer
(3.)Distillery sludgeIndustrial Waste75Tons0RoadOthersCompost
(4.)PressmudIndustrial Waste5120000Tons0RoadOthersCompost
(5.)Bagasse ashIndustrial Waste3329.6Tons0RoadOthersmix with Pressmud for compost
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube42.20.75004360
(2.)SO2Microgram per Meter Cube10.30.958.21980
(3.)NOxMicrogram per Meter Cube15.10.925.320.580
(4.)PM10Microgram per Meter Cube42.10.7500.6642.8100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBagasse752.0PM102.3 g/s
(2.)Incineration boilerSpent wash+ Coal703.77SO249.54 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8500
(b)Source Own factory
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Two DG set of capacity 1000 and 500 kVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 44.33
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 44.33
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 26134
(b)Waste/Barren Land (ha.) 3787
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 604
(e)Settlements (ha.) 861
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31386
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant44.33NA
Total (ha.) 44.33
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0None
(2.)WLSNA0None
(3.)ESZsNA0None
(4.)CorridorsNA0None
(5.)Wildlife CorridorsNA0None
(6.)NPANA0None
(7.)Critically Polluted AreaNA0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sina river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 25
(d)Temporary Employment- During Operation 50
(e)No. of working days 300
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 14.52
(b)Percentage of Total Project Area 32.75
(c)No. of Plants to be Planted 8000
(d)Funds Allocated for Plantation 3500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 0075
(ii)Name of the EIA Consultant MITCON Consultancy & Engineering Services Ltd.
(iii)Address Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune – 411 005, Maharashtra (INDIA)
(iv)Mobile No. 9665043400
(v)Landline No. 0206628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 17 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform about firm commitment (in English) of the concerned regulatory authority to supply 1812.44 cum/day for different industrial operations. 11 May 2019
2.NAThe correction have been made as per the instruction received 20 May 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWith reference to clarification asked in the 9th EAC (Ind-2) dated 28.06.2019 for, ’Proposed Integrated Sugar Industry Sugar 5000 TCD, Co-generation 29.5 MW, Grain based distillery 45 KLPD & Molasses/sugarcane juice/ Sugar Beet based distillery 60 KLPD at Pande, Tal. Karmala. Dist. Solapur by Vitthal Refined Sugars Ltd.’ We are submitting the information herewith. 05 Nov 2020
2.NA