1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Amtipani Chirodih Bauxite Mining Project (M L Area- 130.01 ha) with production capacity of 4.5 Lac TPA (ROM) near Villages: Amtipani Chirodih Bahagara, Taluka: Bishunpur, District: Gumla (Jharkhand). | (b)Name of the Company / Organisation | M/S. MINERAL & MINERAL LTD | (c)Registered Address | Court Road, Lohardaga, Jharkhand,,Lohardaga,Jharkhand-835302 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Basudev Gangopadhyay | (b)Designation (Owner/ Partner/ CEO) | Generalmanager | (c)Address | M/s. Mineral Mineral Ltd, Court Road, PO Lohardaga, Jharkhand,,Lohardaga,Lohardaga,Jharkhand-835302 | (d)Pin code | 835302 | (e)E-mail | basudev1965@yahoo.co.in | (f)STD Code. | 6526(f)Telephone No. | 224118 | (g)Fax No. | 224118 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/JH/MIN/63495/2017 | (d)Master Proposal Number(Single Window) | SW/104279/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra Map is enclosed with EIA/EMP Report | (b)Pincode | 835302 | (c)Bounded Latitudes (North) | | From | | Degree | 232010.801 | Minutes | | Second | | From | | Degree | 232125.361 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 841706 | Minutes | | Second | | From | | Degree | 841741 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73A3, 73A7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1065 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Jharkhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Bokaro | Nawadih | | (2.) | Jharkhand | Gumla | Bishunpur | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/31/2017-IA-II(M) | (b)Date of Apply of TOR | 27 Mar 2017 | (c)Date of Issue of TOR / Standard ToR | 07 Jun 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Jul 2018 | Distance of Public Hearing Venue from the Proposed Project : | 8.6 |
| Village Banari, Block Bishunpur, District: Gumla (Jharkhand) | State : | Jharkhand | District : | Gumla | Tehsil : | Bishunpur | Village : | Banari |
| 254 | Educational
facility, Health
facility,
drinking water
facility,
infrastructure
facility, issue
of
transportation,
electricity,
dirct
employment,
women
empowerment,
use of reclaimed land, | Others | Director of DRDA | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Amtipani Chirodih Bauxite Mine | Area- 130.01 ha | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mining lease area | 130.01 | Hectares | | Others | . | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 26.70 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.25 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.6675 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.05 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 361350 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 361350 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 361350 | Others | Liter | Open market | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 29 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 86.4 | 56 | 85.792 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.3 | 6.5 | 13.164 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 44.5 | 26.7 | 44.144 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 18.6 | 8.6 | 18.4 | 80 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | . | . | . | . | (2.) | pH | | | NA | | 7.62 | 7.12 | 6.5 | 8.5 | (3.) | Fluoride | | | mg/l | | 0.15 | 0.08 | 1.0 | 1.5 | (4.) | Heavy Metals | | . | NA | | . | . | . | . | (5.) | Chlorides | | | mg/l | | 19.57 | 9.78 | 250 | 1000 | (6.) | TDS | | | mg/l | | 130 | 98 | 500 | 2000 | (7.) | Total Hardness | | | mg/l | | 88.43 | 40.80 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 102.40 | 20.40 | E | (2.) | pH | | NA | | 7.77 | 7.42 | E | (3.) | BOD | | mg/l | | 29.70 | 6.0 | E | (4.) | DO | | mg/l | | 5.60 | 5.10 | D | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.8 | 42.5 | I-70-75,C-55-65,R-45-55, S-40-50 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.1 | 39.2 | I-70-75, C-55-65, R-45-55, S-40-50 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 6.29 | 5.76 | (2.) | P(Phosphorus) | Kilogram per hectare | | 143.81 | 84.76 | (3.) | K(Potassium) | Kilogram per hectare | | 264.03 | 145.92 | (4.) | N(Nitrogen) | Kilogram per hectare | | 248.87 | 148.04 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.21 | 0.13 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 02.28 To 11.87 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.10 To 6.25 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine sump | 30 | 0 | Not Appliacble | Pipeline | | Others | Mine sump | Nil | 07 Jun 2017 | 30 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Doemstic from mine office | 2 | 10 | Soak Pit Via septic tank | Others | Disposed in soak pit via septic tank | 0 | 2 | (2.) | vehicular equipment maintenance | 2 | 20 | Oil Water separator | Others | . | 2 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4 | (b)Total Discharged Water (Kilolitre per Day) | 2 | (c)Total Reused Water (Kilolitre per Day) | 2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Soil | Others | Mine waste | 540876 | Tons | 0 | Others | Haul Road | Others | Greenbelt/Plantation | (2.) | Waste | Others | Mine waste | 1183442 | Tons | 0 | Others | Haul Road | Others | Backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 10.3 | 0 | 2.10 | 12.5 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 39.4 | 0 | 0.72 | 40.13 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 70.2 | 0 | 1.87 | 72.08 | 100 | (4.) | NOx | | Microgram per Meter Cube | 15.3 | 0 | 3.19 | 18.50 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | . | . | . | . | Others | . | . | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | 0 | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 25 KVA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 123.59 | (c)Government Land (ha.) | 6.42 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 130.01 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 123.59 | (b)Waste/Barren Land (ha.) | 6.42 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : . | 0 | Total (ha.) | 130.01 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 77 | 77.0 (Backfilled 73.93 ha & water body 3.07 ha) | (2.) | Green belt | | 7.15 | | (3.) | Others | Road, builtup area & undisturbed area | 45.86 | Road, Builtup area & undisturbed area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | No CPA within 10 km of mine site | (2.) | ESZs | Palamau Wildlife sanctuary | 8.09 | . | (3.) | Corridors | None | 0 | No Corridors within 10 km of mine site | (4.) | ESAs | None | 0 | No ESA within 10 km of mine site | (5.) | NPA | None | 0 | No NPA within 10 km of mine site | (6.) | WLS | Palamau Wildlife sanctuary | 8.09 | . | (7.) | Wildlife Corridors | None | 0 | No Wildlife corridors with in 10 km of mine site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | 22 PF & 7 RF | . | Forest exist in study area (adjacent to 9.5 km) | (2.) | Archaeological Sites | | None | 0 | No | (3.) | Defence Installations | | None | 0 | No | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | Yes | (i)Status of NBWL | NIL | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | . | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 123.59 | (c)Status of Land acquisition if not acquired | Mining lease is falling under CNT land, hence land | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 3 | (b)No. of Households | 871 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 265 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | As per Biological study report, there are 8 number of Schedule I species found within study area i.e. Wild Dog (Cuon alpines), Wolf (Canis lupus), Asian Elephant (Elephas maximus), Sloth Bear (Melurs | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 200 lakh | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | 1015 | (iii)Date of issue | 11 Jun 2018 | (iv)Recommendation | None | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | North Koel River & 10 nalas | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 6.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 155 | (e)No. of working days | 295 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 7.15 | (b)Percentage of Total Project Area | 5.50 | (c)No. of Plants to be Planted | 17875 | (d)Funds Allocated for Plantation | 3575000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue generation will be due to the project | (2.) | Environmental | Greenbelt/Plantation will be developed within the ML Area | (3.) | Social | Employement will be generated due to this project | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Bauxite | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 4.5 Lakh TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | RAN/GML/BX/MP-04/2017-18 | (b)Date of Approval | 26 May 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 130.01 | (f)Approved Capacity | 450000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 2.45 | (b)Mineable Reserves (Million Ton) | 1.93 | (c)Extractable Reserves(Million Ton) | 1.93 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | siutable for alumina refineries | (f)Stripping Ratio | 1 : 3.26 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | None | (h)Average Gradient(Degree) | None | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 7 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 130.01 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 10 Jan 2017 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | B.M-4-1047/94/59/M | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 130.01 | (iii)Validity of the lease deed | From : 11 Jan 2017 To : 10 Jan 2067 | (iv)Date of Execution of Mining Lese | 11 Jan 2017 | (v)Reference Number | JH04416033189259P | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | This is fresh Mine | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 1456204 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 1456204 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 77 | (b)Depth (in meter) | 10 | (c)Volume (in Million Cubic meter) | 7.70 | |
|
12. | Details of Quarry: | (a)Final Void of 3.07 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 77 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | By trucks with tarpaulin cover | (b)Surface to Siding/Loading | By Rail from siding to the Plant | (c)Transportation / Conveyor Details | By Road | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 123.59 | 0 | 123.59 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 6.42 | 0 | 6.42 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 130.01 | 0 | 130.01 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 7.15 | 0 | 0 | | 7.15 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | ROADS | | 0 | 0 | 2.68 | | 2.68 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.50 | | 0.5 | (6.) | EXCAVATION/QUARRY | | 0 | 3.07 | 73.93 | | 77 | (7.) | VIRGIN AREA | | 0 | 0 | 42.68 | | 42.68 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 7.15 | 3.07 | 119.79 | 0 | 130.01 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 77 | (d)Safety Zone(in hectare) | 7.15 | (e)Final Void of 3.07 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 2.68 | (h)Total afforestation plant (in hectare) | 7.15 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | . | . | . | . | . | . | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0069 | (ii)Name of the EIA Consultant | JM EnviroNet Pvt Ltd | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001 | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting ADS Reply | 25 Jun 2021 | 2. | NA | Based on the presentation made by PP and the discussion held, the Committee
observed the following and deferred the proposal and asked the PP to submit
following information for further consideration.
(i). The public hearing was conducted 25 km away from the affected villages.
Furthermore, public hearing was presided by Mr. Mustakeem Ansari, Director
Accounts Administration &Self employment programmes, District- Rural
development agency. However, as per the OM dated 28th September 2011,
the public hearing should be headed by “the District Magistrate/ District
Collector/Deputy Commissioner or his or her representative not below the
rank of an Additional District Magistrate assisted by a representative of SPCB
or UTPCC shall supervise and preside over the entire public hearing process.
Therefore, the Committee suggested the Ministry that details of public
hearing should be subjected to get the confirmation from the State Pollution
Control Board.
(ii). The responses prepared for public hearing issues are generic. PP needs to
submit the revised responses with timeline for achieving/overcoming the
issues and associated year wise budget details.
(iii). The conservation plans for wildlife was found not satisfactory. PP is required
to revise the wild life conservation plan with special emphasis on monitoring
mechanism which are going to be implemented.
(iv). PP submitted that the bauxite zone found within the matrix of Laterite, so,
the PP proposed to carry out the mining of Laterite as well. Thus, the
Committee asked the PP to submit the details of quantity of Laterite
extraction as well as their impact on the environment. Furthermore, the
details of total excavationand the usage of Laterite should also be included
in the report. Furthermore, the mineralogical analysis for laterite mineral
should be submitted from the IBM.
(v). PP reported that no forest land in the mine lease area and submitted the
letter from Circle Officer, Bishunpur. However, the Committee is of the view
that Circle Officer not a responsible for providing the no forest land
certificate. PP needs to submit certificate from the Competent Authority
(PCCF and Chief Wildlife Warden) and the certificate should mention the
name, designation, official seal of the person signing the certificate and letter
number.
(vi). PP submitted that the total lease area granted by the State Government is
321.26 ha, out of which 130.01 ha is the total mine lease area for this current
proposal. PP needs to submit the land use details for complete lease area
(321.26-130.01 = 191.25 ha).
(vii). The environmental impact analysis on the total excavation is not properly
addressed in the EIA report. PP needs to submit the details of total excavation
and also redo the analysis.
(viii). The funds allocated for CER is not as per the OM F. No. 22-65/2017-IA-III
dated 01 May 2018. So, the EIA report needs to be revised in terms of the
CER and EMP.
(ix). PP submitted village road is passing through the mine lease area and
mentioned that the road will be diverted and alternative routes will made for
accessing by the village people. PP needs to submit the plans with budgetary
provision and safety procedure for the alternative route.
(x). PP mentioned that water required will be fulfilled from the nearby mines and
the details are not provided, so the same needs to be provided.
(xi). PP submitted that there will be significant cumulative effect on transport and
infrastructure due to transportation of minerals, excavation and waste
dumping from the mines in the region. The Committee asked the PP to submit
the details of nearby mines using common transport infrastructure. PP also
required to submit adequacy of transport infrastructure.
(xii). PP submitted the land use pattern of the project area which are not matching
with the claimed total mine lease area. PP needs to submit the clarification
for the same.
(xiii). PP submitted the flow chart of environmental management cell; however,
the Committee noted that there is no individual person with assign
responsibility for environmental monitoring and measurement. PP needs to
submit the revised plans. | 17 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Basudev Gangopadhyay | Designation | Generalmanager | Name of Company (Applicant Name should not be given here) | M/S. MINERAL & MINERAL LTD | Address | Court Road, Lohardaga, Jharkhand |
|