Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development and production of oil & gas from 4 wells in CB-OSN-2003/1, Bharuch district, Gujarat
(b)Name of the Company / Organisation ONGC
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) ChiefGeneralManager
(c)Address NIL
(d)Pin code 110070
(e)E-mail kumar_rajeeva@ongc.co.in
(f)STD Code. (f)Telephone No.
(g)Fax No. 26129067
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/60507/2016
(d)Master Proposal Number(Single Window) SW/104190/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. CB-OSN-2003/1 block
(b)Pincode 392130
(c)Bounded Latitudes (North)
From
Degree 21.5777
Minutes
Second
From
Degree 21.6050
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.6444
Minutes
Second
From
Degree 72.6561
Minutes
Second
(e)Survey of India Topo Sheet No. 46C/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 8
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratSuratSurat City
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J- 11011/339/2016-IA.II(I)
(b)Date of Apply of TOR 20 Nov 2016
(c)Date of Issue of TOR / Standard ToR 29 Apr 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Exempted in TOR
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Onland wells44 ONLAND WELLS
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Natural Gas325000Cubic Meter per DayOthersPipeline
(2.)Condensate23.1Cubic Meter per DayOthersPipeline or Tankers
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 156.40
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.17
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.17
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel3Kilo Litre per DayOpen MarketRoad45 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2017 To 30 Jun 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube21.37.421.280
(2.)NOxMicro Gram per Meter Cube297.422.780
(3.)PM2.5Micro Gram per Meter Cube49.822.948.460
(4.)PM10Micro Gram per Meter Cube98.85597.8100
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l14754405002000
(2.)pHNA7.967.866.58.5
(3.)Fluoridemg/l0.70.51.01.5
(4.)Total Hardnessmg/l790348200600
(5.)TSSmg/l1111
(6.)Heavy MetalsFemg/l0.240.180.30.3
(7.)Chloridesmg/l404542501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.24.9B
(2.)BODmg/l54E
(3.)CODmg/l186E
(4.)pHNA7.687.59E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.754.975
(2.)Leq(Night)A-weighted decibels(dB(A))6044.970
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.147.46
(2.)N(Nitrogen)Milligram per Kilogram23521
(3.)K(Potassium)Milligram per Kilogram148
(4.)Electric ConductivityOthersdS/m2.450.4
(5.)P(Phosphorus)Milligram per Kilogram25018
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 3
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTANKERS250 Not Appliacble modeOthersTANKERSOthersTANKERSNA29 Apr 201725
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste Water during drilling55EvaoprationOthersEvaporation50
(2.)Domestic Wastewater44Septic TankOthersSeptic Tank40
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste Drilling MudOthersWaste Drilling Mud6.8Tons0OthersNAOthersHDPE LINED PIT
(2.)Drill CuttingsOthersDrill Cuttings640Tons0OthersNAOthersHDPE LINED PIT
(3.)Oily waste, used/spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons0OthersROADAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube98.81.80.198.9100
(2.)PM2.5Microgram per Meter Cube49.81.80.0249.960
(3.)SO2Microgram per Meter Cube21.30.50.722.180
(4.)NOxMicrogram per Meter Cube29.30.23.032.480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel90.2SO20.03 g/s
(2.)DG SetDiesel90.2NOx0.06 g/s
(3.)DG SetDiesel90.2PM100.005 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1250
(b)Source DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 DG sets, 1250 kVA each
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 6.4
    Total Land (ha.) 6.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 734.87
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 8748.04
(d)Surface Water Bodies (ha.) 4831.90
(e)Settlements (ha.) 79.54
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 1149.61
(i)Marine Area (ha.) 18874.19
(j)Others (ha.) : Salt pan area/wetland 3734.26
    Total (ha.) 38152.41
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersDrill Sites6.4
Total (ha.) 6.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)Critically Polluted AreaNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)Archaeological SitesNA0NA
(3.)OthersCoastal ZoneGulf of Khambat4.5Drilling will be within Coastal Zone
(4.)ForestNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 6.4
(c)Status of Land acquisition if not acquired Under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Gulf of Khambhat
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. Ref. No.ENV-10-2018-121-E(T Cell)
(iii)Date of issue 24 Apr 2019
(iv)Recommendation CRZ CLEARANCE granted
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Narmada Estaury
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 15
(e)No. of working days 60
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA007
(ii)Name of the EIA Consultant M/s Global Managment and Engineering Consultants I
(iii)Address Saharan Towers, 308, Officer's Campus Extension, Khatipura, Jaipur
(iv)Mobile No. 9928793002
(v)Landline No. 0141235532
(vi)Email Id info@gmecinternational.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 03 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease confirm that the EIA consultant is accredited for the given sector i.e.1(b), and also certificate of accreditation is valid as on date. 12 May 2019
2.NAThe correction have been made as per the instruction received 13 May 2019
3.NAAs requested earlier also, please submit NABET certificate of accreditation, valid as on date, for the sector 1(b). 18 May 2019
4.NAThe correction have been made as per the instruction received 23 May 2019
5.NAPlease provide detailed justification for exemption from public hearing vis-a-vis the provisions contained in para 7(ii) of the EIA Notification, 2006. Whether the proposal involves any expansion of the project which was earlier granted EC under the said Notification. 01 Jun 2019
6.NAThe correction have been made as per the instruction received 07 Jun 2019
7.NAAs per one of the conditions stipulated in the ToR dated 29/4/2017, please submit CCR for the earlier EC dated 15/10/2008. Also please confirm land acquisition status of 6.4 ha of land and present accreditation status of the EIA consultant. 16 Jun 2019
8.NAThe correction have been made as per the instruction received 27 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationChiefGeneralManager
Name of Company (Applicant Name should not be given here)ONGC
AddressCorporate HSE, 8th Floor Core IV, SCOPE Minar, Delhi 10092
Print