1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | J K Industries | (b)Name of the Company / Organisation | J K INDUSTRIES | (c)Registered Address | Khasra No. 57/1, Village: Dungariya, Tehsil & Dist: Seoni, Madhya Pradesh,,Seoni,Madhya Pradesh-480661 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ritesh Jain | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | NIL | (d)Pin code | 480001 | (e)E-mail | jkindustrieschw@gmail.com | (f)STD Code. | 79(f)Telephone No. | 26583099 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/MP/IND2/72950/2018 | (d)Master Proposal Number(Single Window) | SW/104179/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra No. 57/1, Madhya Pradesh Audyogik Kendra Vi | (b)Pincode | 480888 | (c)Bounded Latitudes (North) | | From | | Degree | 22.104219 | Minutes | | Second | | From | | Degree | 22.104758 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.625539 | Minutes | | Second | | From | | Degree | 79.628114 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F44H12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 570 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 26 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Seoni | Seoni | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/55/2018-IA-II(I) | (b)Date of Apply of TOR | 13 Feb 2018 | (c)Date of Issue of TOR / Standard ToR | 22 Mar 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Project site (Khasra No. 57/1 MPAKVN) | State : | Madhya Pradesh | District : | Seoni | Tehsil : | Seoni | Village : | Dungariya |
| 75 | Employment to locals and proper treatment of wastewater | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SS Vessels | 12 KL each | 4 nos | (2.) | MS Distillation Vessel | 25 KL each | 4 nos | (3.) | Slurry vessel | 10 KL each | 1 nos | (4.) | Pigmentation Vessel | 25 KL each | 2 nos | (5.) | Ball Mill | 3 MT | 8 nos | (6.) | GL Reactors | 10 KL each | 18 nos | (7.) | Alkali Purification Vessel | 40 KL each | 1 nos | (8.) | Filter press | 48’ x 48’ x 60 plates | 14 nos | (9.) | Filter press | 36’ x 36’ x 60 plates | 4 nos | (10.) | Slurry vessel | 10 KL each | 1 nos | (11.) | Slurry vessel | 10 KL each | 1 nos | (12.) | MSRL vessel | 40 KL each | 16 nos | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Copper Phthalocyanine Blue | 12000 | Tons per Annum | | Road | | (2.) | Beta Blue-15.3 & 15.4 | 4800 | Tons per Annum | | Road | | (3.) | Azo Pigment-Red 3,4,8,48.2,49.1,53.1,57.1, 63.1,112 | 1200 | Tons per Annum | | Road | | (4.) | Azo Pigment-Yellow 12,13,74,83 | 720 | Tons per Annum | | Road | | (5.) | Metallic Pigments-Lemon Chrome/Middle Chrome,Scarlet Chrome | 2400 | Tons per Annum | | Road | | (6.) | Copper Phthalocyanine Green | 3600 | Tons per Annum | | Road | | (7.) | Azo Pigment-Orange 5,13 | 480 | Tons per Annum | | Road | | (8.) | Pigment Violet 23 | 120 | Tons per Annum | | Road | | (9.) | Alpha Blue-15.0, 15.1 & 15B | 2400 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 48 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 12 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.2 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 34650 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 34650 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | attached as pdf | 34650 | Tons per Annum | | open market | Road | | 124 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2018 To 31 Mar 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 69.0 | 43.3 | 59.7 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 21.3 | 11.3 | 18.7 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 16.8 | 8.1 | 14.7 | 80 | (4.) | PM2.5 | | Nano Gram per Meter Cube | 40.0 | 23.9 | 35.4 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | mg/l | | 7.8 | 7.2 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 14.4 | 7.9 | 00 | 00 | (3.) | TDS | | | mg/l | | 610 | 495 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 341 | 246 | 300 | 600 | (5.) | Chlorides | | | mg/l | | 251 | 172 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.32 | 0.16 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.6 | 7.4 | A | (2.) | COD | | mg/l | | 32 | 20 | D | (3.) | BOD | | mg/l | | 14 | 8 | D | (4.) | DO | | mg/l | | 5.1 | 3.9 | B | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 50.8 | 49.3 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 39.3 | 37.2 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 85 | 52 | (2.) | K(Potassium) | Milligram per Kilogram | | 249 | 172 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 294 | 192 | (4.) | pH | | | 7.8 | 7.5 | (5.) | Electric Conductivity | Others | dS/m | 4.2 | 2.5 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 22 To 27 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14 To 18 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MPAKVN | 633 | 1 | Copy of Permission Letter | Pipeline | | Others | PipelinE | MPAKVN2905 | 18 Dec 2018 | 750 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 1723 | 1800 | ETP-RO-MEE | Reuse within the Plant & Recycling,Others | Drying loss | 1678 | 45 | (2.) | Domestic | 12.5 | 12.5 | Soakpit | Others | soakpit | 0 | 12.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1735.5 | (b)Total Discharged Water (Kilolitre per Day) | 57.5 | (c)Total Reused Water (Kilolitre per Day) | 1678 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4800 | Tons | 155 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2700 | Tons | 155 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Inorganic acid (H2SO4) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 17400 | Tons | 0 | Others | Captive reuse | Others | Captive reuse in CPC Blue production | (4.) | Inorganic acid (HCl) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10500 | Tons | 50 | Road | | Others | reuse inhouse and excess sold to actual users | (5.) | Fly ash | Fly Ash | | 1200 | Tons | 35 | Road | | Others | sold to brick manufacturer | (6.) | Discarded containers/liners | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 81 | Tons | 45 | Road | | Authorized Recyclers | | (7.) | Copper earth | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4632 | Tons | 75 | Road | | Authorized Recyclers | | (8.) | Halogenated compounds (Aluminum Chloride) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 14040 | Tons | 50 | Road | | Others | sold to actual users | (9.) | Ammonium Sulphate | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4200 | Tons | 100 | Road | | Others | sold to actual users | (10.) | Copper Sulphate | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 246 | Tons | 100 | Road | | Others | sold to actual users | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 54.7 | 1 | 3.761 | 58.5 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 11.6 | 1 | 1.537 | 13.2 | 80 | (3.) | NOx | | Microgram per Meter Cube | 15.4 | 1 | 1.268 | 16.7 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 31.7 | 1 | 3.761 | 35.5 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Reaction vessel System (CPC green-7) | none | 15 | 0.375 | Others | HCl, Cl2 | 00 | (2.) | Boiler 8 TPH (2 nos) | Coal | 41 | 0.625 | Others | PM, SO2, NOx | 00 | (3.) | Thermic Fluid Heater (25 Lakhs KCal/hr.) | Coal | 25 | 0.45 | Others | PM, SO2, NOx | 00 | (4.) | Process Stack-1 (CPC blue | none | 15 | 0.375 | Others | NH3 | 00 | (5.) | Process Stack-2 (CPC blue) | none | 15 | 0.375 | Others | NH3 | 00 | (6.) | Hot Air Generator (25 Lakhs KCal/hr.) | Coal | 25 | 0.45 | Others | PM, SO2, NOx | 00 | (7.) | D.G. Set (1000 kVA) | Diesel | 11 | 0.3 | Others | PM, SO2, NOx | 00 | (8.) | Reaction vessel System (Alpha blue) | none | 15 | 0.375 | SO2 | | 00 | (9.) | Spin Flash dryer (4 nos.) | none | 15 | 0.375 | PM10 | | 00 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 600 | (b)Source | Madhya Pradesh Paschim Kshetra Vidyut Vitaran Comp | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1000 | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 11.8 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 11.8 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 16919 | (b)Waste/Barren Land (ha.) | 6299 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 1267 | (e)Settlements (ha.) | 1374 | (f)Industrial (ha.) | 96 | (g)Forest (ha.) | 5232 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Transportation | 232 | Total (ha.) | 31419 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 3.077 | | (2.) | Main Plant | | 4.14 | | (3.) | Built Up Area | | 1.5020 | | (4.) | Others | Roads and other margins | 3.0810 | Roads and other margins | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None within 10 km radius | 00 | None within 10 km radius | (2.) | WLS | None within 10 km radius | 00 | None within 10 km radius | (3.) | NPA | None within 10 km radius | 00 | None within 10 km radius | (4.) | Corridors | None within 10 km radius | 00 | None within 10 km radius | (5.) | ESAs | None within 10 km radius | 00 | None within 10 km radius | (6.) | ESZs | None within 10 km radius | 00 | None within 10 km radius | (7.) | Wildlife Corridors | None within 10 km radius | 00 | None within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None within 10 km radius | 00 | None within 10 km radius | (2.) | Archaeological Sites | | None within 10 km radius | 00 | None within 10 km radius | (3.) | Defence Installations | | None within 10 km radius | 00 | None within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 11.8 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Pond Nr. Chichband | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Dal Sagar Pond, Seoni and Pond Nr. Pipariya | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 145 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 26 | (f)Total Manpower | 175 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 4 | (b)Percentage of Total Project Area | 33.90 | (c)No. of Plants to be Planted | 4000 | (d)Funds Allocated for Plantation | 10 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | CSR and employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd. | (iii)Address | 424, Medicine Market, Paldi Cross Road, Ahmedabad-380006, Gujarat | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | mahendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 23 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Whether the proposed industrial operations are in conformity with permitted land use of the area. That needs to be established along with supporting documents.
- Whether such polluting units are allowed by the SPCB in the given area. Any in-principle approval required in this regard.
- List of proposed products contains certain chemicals (Inorganic/by-products), which are not covered under the ambit of the EIA Notification, 2006. The proposal needs to be restructured accordingly.
- Firm commitment for water supply of 633 cum/day by MPAVKN Ltd. How the said agency shall manage the same. | 18 May 2019 | 2. | NA | The correction have been made as per the instruction received | 28 May 2019 | 3. | NA | In case of project site located in notified industrial area of the State Government, the proposal would require consideration at the State level. As desired earlier, the proposal is yet to be restructured vis-a-vis the ambit of the EIA Notification, 2006. | 02 Jun 2019 | 4. | NA | The correction have been made as per the instruction received | 03 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply of ADS is attached herewith | 15 Oct 2019 | 2. | NA | NA | 20 Aug 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ritesh Jain | Designation | Partner | Name of Company (Applicant Name should not be given here) | J K INDUSTRIES | Address | Khasra No. 57/1, Village: Dungariya, Tehsil & Dist: Seoni, Madhya Pradesh |
|