Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of Rajiv Gandhi International Airport from 25 MPPA to 50 MPPA, Shamshabad Village, Hyderabad, Telangana
(b)Name of the Company / Organisation HYDERABAD INTERNATIONAL AIRPORT LIMITED
(c)Registered Address GMR Aero Towers, Rajiv Gandhi International Airport. Shamshabad, Hyderabad,,Hyderabad,Telangana-500409
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ravinder Reddy Alumalla
(b)Designation (Owner/ Partner/ CEO) Associate Vice President
(c)Address GMR HIAL Airport Office,Rajiv Gandhi International Airport,Shamshabad,,Bahadurpura,Hyderabad,Telangana-500409
(d)Pin code 500409
(e)E-mail alumallaravinder.reddy@gmrgroup.in
(f)STD Code. 40(f)Telephone No. 67394100
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity7(a) Air ports
(b)Category A
(c)Proposal Number IA/TG/MIS/52885/2016
(d)Master Proposal Number(Single Window) SW/104152/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 0
(b)Pincode 500108
(c)Bounded Latitudes (North)
From
Degree 171334
Minutes
Second
From
Degree 171514
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 782316
Minutes
Second
From
Degree 782756
Minutes
Second
(e)Survey of India Topo Sheet No. 56k/7,k/8,k/11,k/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 601
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaHyderabadBahadurpura
(2.)TelanganaRangareddiShamshabad
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-35/2016-IA-III
(c)Date of Issue of TOR 11 Jul 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 28 Mar 2017
(c)Date of Issue of EC 28 Jul 2017
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason EAC exempted the public hearing as per para 7(ii)
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. F.No.EP/12.1/867/AP
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 23 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Passengers252550OthersMPPAOthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)0000Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Apr 2016
(iv)Valid Upto 31 Jan 2021
(v)File No. TSPCB/214/RO-RR-I/CFO/HO/2016-106
(vi)Application No. TSPCB/214/RO-RR-I/CFO/HO/2016-106
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.34
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.02148
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.34
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0OthersNALocalOthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Oct 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube48.917.248.860
(2.)SO2Micro Gram per Meter Cube19.210.317.080
(3.)NOxMicro Gram per Meter Cube32.514.130.380
(4.)PM10Micro Gram per Meter Cube74.332.874.2100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l570339200600
(2.)pHOthersNil8.17.16.58.5
(3.)Chloridesmg/l225.779.12501000
(4.)Fluoridemg/l0.80.051.01.5
(5.)Heavy MetalsIronmg/l0.180.030.30.3
(6.)TSSmg/l0000
(7.)TDSmg/l11856905002000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.25.0A
(2.)CODmg/l3.42.9A
(3.)pHNA8.37.8A
(4.)BODmg/l2.82.2A
    14.4.     No. of Ambient Noise monitoring locations : 11
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))74.153.670
(2.)Leq(Night)A-weighted decibels(dB(A))69.749.665
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare397.1110.6
(2.)K(Potassium)Kilogram per hectare540.974.8
(3.)Electric ConductivityMillisiemens per Centimetre396118
(4.)pH8.07.4
(5.)N(Nitrogen)Kilogram per hectare396118
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 33.50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.20 To 28.32
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWS&SB530510Copy of Permission LetterPipelineOthersPipelineGO.No.113230 Nov 200610000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2758.23000Activated Sludge ProcessReuse within the Plant & Recycling2758.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2758.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2758.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid waste from Cargo ComplexOthersSolid waste from Cargo Complex300Tons10RoadAuthorized Recyclers
(2.)Bio-Degradable wasteOthers(Food waste, paper etc)10273Tons30RoadAuthorized Recyclers
(3.)SludgeOthersSTP Sludge605Tons0RoadOthersUsed as Manure within the Airport Premises
(4.)Waste GreaseOthersWaste Grease0.51Tons10RoadAuthorized Recyclers
(5.)Used/waste Aviation turbine FuelOtherswaste Aviation turbine Fuel100Kilolitre10RoadAuthorized Recyclers
(6.)Cleaning materialsOtherscontaminated Cotton rags/ material5Tons10RoadAuthorized Recyclers
(7.)E wasteE Waste75Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Bio-Medical WasteBio-Medical Waste7Tons10RoadAuthorized Recyclers
(9.)Oil FiltersOthersOil Filters100Kilolitre10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube48.91.41.95160
(2.)NOxMicrogram per Meter Cube29.21.446.37680
(3.)SO2Microgram per Meter Cube16.61.44.52280
(4.)PM10Microgram per Meter Cube74.31.44.379100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
(2.)NANA00NOx0
(3.)NANA00SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15700
(b)Source TSTRANSCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 6 X 2 MVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 2223.748
    Total Land (ha.) 2223.748
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 2223.748
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 2223.748
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plot area113.316Total Plot area
Total (ha.) 113.316
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0NIL
(2.)Critically Polluted AreaNil0NIL
(3.)ESAsNehru Zoological Park12NIL
(4.)ESZsNil0NIL
(5.)CorridorsNil0NIL
(6.)NPANil0NIL
(7.)Wildlife CorridorsNil0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Nil
(2.)Archaeological SitesFalaknuma Palace10.1NNE to Project site
(3.)Defence InstallationsNational Police Academy9.0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 585
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2223.748
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NIL
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl, Black Kite, Black Winged Kite
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Nil
(iii)Period of Implementation Will be implemented
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area umda sagar,Rawiral cheruvu, Himmayat sagar, Mir Alam Tank,
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 4000
(b)Permanent Employment-During Operation 3000
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 1000
(e)No. of working days 365
(f)Total Manpower 9000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt64755702
(2.)Percentage of Total Project Area292.531.5
(3.)Funds Allocated3.50.43.9
(4.)No. of Plants537581344067198
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 35
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 1133160
(e)Total built up area (sqm) 554589
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 3
(b)Capacity 4.35
(c)No. of Recharge Pits 10
(d)Capacity 0.185
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Open Parking & MLCP
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 25
(c)Quantity 25000
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Not Applicable
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 088
(ii)Name of the EIA Consultant Vimta Labs Limited
(iii)Address 142, IDA, Phase-II, Cherlapally, Hyderbad-500051, Telangana State
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id env@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 19 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRavinder Reddy Alumalla
DesignationAssociate Vice President
Name of Company (Applicant Name should not be given here)HYDERABAD INTERNATIONAL AIRPORT LIMITED
AddressGMR Aero Towers, Rajiv Gandhi International Airport. Shamshabad, Hyderabad
Print