Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EC for Proposed Greenfield CETP, Incineration Plant & other waste recycling facilities
(b)Name of the Company / Organisation UNNATI UDHYOG PVT LTD
(c)Registered Address 108-109, Chowdhary Complex, 9, veer savarkar block, Shakarpur, Delhi,,East,Delhi-110092
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Goel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 4F-303. AWHO, Gurjinder Vihar, Sector-Chi IV, Greater Noida,,Gandhi Nagar,East,Delhi-110092
(d)Pin code 110092
(e)E-mail unnati.udhyog@gmail.com
(f)STD Code. 120(f)Telephone No. 2565192
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
7(h) Common Effluent Treatment Plants (CETPs)
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/MIS/50520/2016
(d)Master Proposal Number(Single Window) SW/104032/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No D-23, 24, 25 & C1
(b)Pincode 203207
(c)Bounded Latitudes (North)
From
Degree 3154902.23
Minutes
Second
From
Degree 3154930.82
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 759846.66
Minutes
Second
From
Degree 759927.01
Minutes
Second
(e)Survey of India Topo Sheet No. H43X10, H43X11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 677
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshBulandshahrSikandrabad
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-26/2016-IA.III
(c)Date of Apply of TOR 09 Mar 2016
(d)Date of Issue of TOR / Standard ToR 04 May 2016
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per TOR Letter dated 4th May 2016, the proposed
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CETP1 MLD-
(2.)Incinerator17,520 tons per annum-
(3.)Detoxification of Contaminated Container5000 nos. per day-
(4.)Recycling of Copper from Copper waste1700 tons per annum-
(5.)Recycling E – Waste5,000 tons per annum-
(6.)Recycling Plastic Waste8,000 tons per annum-
(7.)Recycling of Aluminum Waste1700 tons per annum-
(8.)Recycling of Lead from Battery Scrap1700 tons per annum-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Not applicable as the proposed project is an infrastructure project with CETP, Incinerator and other waste recycling facilities0Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.84
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.18
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0Tons per AnnumLocalRoad0 LinkageCopy of Linkage
(2.)Not Applicable0Tons per AnnumNARoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2016 To 31 May 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube958294.74100
(2.)PM2.5Micro Gram per Meter Cube463245.7260
(3.)SO2Micro Gram per Meter Cube10.38.410.2680
(4.)NOxMicro Gram per Meter Cube21.813.221.6280
(5.)OthersCOMicro Gram per Meter Cube159012321582.844000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l7002325002000
(3.)Chloridesmg/l193482501000
(4.)Heavy MetalsCoppermg/l0.030.020.051.5
(5.)Fluoridemg/l2.80.911.5
(6.)pHNA7.647.136.58.5
(7.)Total Hardnessmg/l380150200600
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)Otherscoppermg/l0.030.01A
(2.)CODmg/l61390E
(3.)DOmg/l4.13.7D
(4.)pHNA8.247.26A
(5.)BODmg/l17529E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.854.575(Industrial),55(Residential)
(2.)Leq(Night)A-weighted decibels(dB(A))56.144.570(Industrial), 45(Residential)
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.947.1
(2.)K(Potassium)Othersgm/kg0.90.29
(3.)N(Nitrogen)00
(4.)Electric ConductivityOthersdS/m0.2860.142
(5.)P(Phosphorus)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.25 To 4.96
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.34 To 4.74
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2540Copy of Permission LettermodeOtherstankerOthersBorewell0001 May 2019254
(2.)GroundWater2500Copy of Permission LettermodeOtherstankerOthersBorewell21-4/7495/UPIND/201902 May 2019272
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Infrastructure and Miscellaneous Projects  +  CRZ11471000CETP & ROReuse within the Plant & Recycling1147
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1147
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1147
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used bags/ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons10RoadAuthorized Recyclers
(2.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons10RoadbagAuthorized RecyclersDispose to own incineration facility
(3.)Lead Bearing ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.4Tons66RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Residue from decontamination facilityHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18Tons0OthersTrollyOthersOwn Incinerator
(5.)Incineration AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6912Tons66RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Sludge and Filter cakeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8Tons0OthersTrollyOthersOwn Incineration facility
(7.)CETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)720Tons66RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Sludge from Alluminum waste recycling facilityHazardous Waste (as per Hazardous and Other Waste Management rules 2016)8.5Tons0OthersTrollyOthersOwn Incinerator
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0.0000.010
(2.)NOxMicrogram per Meter Cube18.70.259.92980
(3.)PM10Microgram per Meter Cube940.251.2896100
(4.)SO2Microgram per Meter Cube9.60.255.381580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Incinerator + Smelting PlantHSD300.7PM10100 mg/m3 permissible
(2.)DG set-2HSD100.1PM1061 mg/m3
(3.)DG set -1HSD100.1PM1061 mg/m3
(4.)DG set-3HSD150.1PM1061 mg/m3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Uttar Pradesh Power Corporation Ltd. (UPPCL)
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Sets - 3 nos. of 250 KVA, 500 KVA and 1500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.1148
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.1148
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2419
(b)Waste/Barren Land (ha.) 1348
(c)Grazing/ Community Land (ha.) 2677
(d)Surface Water Bodies (ha.) 156
(e)Settlements (ha.) 2146
(f)Industrial (ha.) 697
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Forest 0
    Total (ha.) 9443
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.4555
(2.)Green belt0.3101
(3.)Area for Solid Waste Management0.0699
(4.)Built Up Area0.0043
(5.)OthersUtility area, Switch yard, Weigh Bridge, Road area0.275
Total (ha.) 1.1148
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0Ecological sensitive area is not present in the study area
(2.)WLSNone0Ecological sensitive area is not present in the study area
(3.)NPANone0Ecological sensitive area is not present in the study area
(4.)ESAsNone0Ecological sensitive area is not present in the study area
(5.)Wildlife CorridorsNone0Ecological sensitive area is not present in the study area
(6.)ESZsNone0Ecological sensitive area is not present in the study area
(7.)CorridorsNone0Ecological sensitive area is not present in the study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersRiverKotki River6.79NW Directions
(2.)ForestNone0No forest present in the study area
(3.)Archaeological SitesNone0no Archaeological site is present in the study area
(4.)Defence InstallationsNone0No defense installation present in the study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.1148
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Allotted by UPSIDC
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Gopalpur Pond
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kotki River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 6.79
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.3101
(b)Percentage of Total Project Area 27.82
(c)No. of Plants to be Planted 240
(d)Funds Allocated for Plantation 864000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• Education: Providing scholarships, books & uniforms to poor students; • Health: Contributing in community health checkup programs; • Drinking Water: Arranging of Drinking water facilities in nearby villages. • Rain Water Harvestign Systems for Water Conservation • Construction of Approach Roads in nearby villages. • Improvement in local amenities to nearby villages. • Job Opportunities
(2.)Environmental• Provide a common waste treatment facility for waste water generated from Industries in Bulandsahar Industrial Area for safe treatment and disposal thereby saving the Environment. • Provide safe disposal system for Hazardous Waste generated from Industries in the Bulandsahar Industrial Area. • Development of Industries due to availability of safe mode of disposal for waste water and hazardous solid waste
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 6
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 11148
(e)Total built up area (sqm) 43
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 20 sq m area
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area no impacts
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0042
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Vadodara, India – 390 010.
(iv)Mobile No. 9714861611
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 26 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS reply along with Annexures is uploaded above. 23 Sep 2020
2.NA

kindly see the minutes of the 41st EAC infra-II held on 27-29 May 2019

11 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Goel
DesignationDirector
Name of Company (Applicant Name should not be given here)UNNATI UDHYOG PVT LTD
Address108-109, Chowdhary Complex, 9, veer savarkar block, Shakarpur, Delhi