(a)Name of the project(s) Extension of Runway & allied works at Shillong Airport, Barapani, Meghalaya
(b)Name of the Company / Organisation AIRPORTS AUTHORITY OF INDIA SHILLONG
(c)Registered Address SHILLONG AIRPORT UMAROI DISTRICT-RI-BHOI, MEGHALAYA-793103,,Ri Bhoi,Meghalaya-793103
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant PS DEVAKUMAR
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address SHILLONG AIRPORT UMROI DISTRICT-RI-BHOI, MEGHALAYA-793103,,Umsning,Ri Bhoi,Meghalaya-793103
(d)Pin code 793103
(e)E-mail enggcivilbarapani.aai@gmail.com
(f)STD Code. 364(f)Telephone No. 2908974
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/ML/MIS/103943/2018
(d)Master Proposal Number(Single Window) SW/103876/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village Umroi, Tehsil & District Ri-Bhoi, Meghalay
(b)Pincode 793103
(c)Bounded Latitudes (North)
From
Degree 25413627
Minutes
Second
From
Degree 254249.58
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 91586.33
Minutes
Second
From
Degree 915913.65
Minutes
Second
(e)Survey of India Topo Sheet No. 78O/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 886
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 890
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Meghalaya
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-28/2018-1A-III
(c)Date of Issue of TOR 17 May 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 12 Oct 2019
(c)Date of Issue of EC 07 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0
shillong airport RiBhoi, Meghalaya
State :Meghalaya
District :Ri Bhoi
Tehsil :Umsning
Village :umroi
65the major issues raised during public hearing were related to local employment, CSR activities by AAI.OthersM.C.S Additional deputy commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Shillong
(iii)Letter No. MPCB/TB-CON-12(2010)/2017-2018/29
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 6 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)construction192224.16416.15999999999997OthersacresRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)expansion192 Acres224.16 Acres416.16 acresexpansion project
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 11 Sep 2017
(iv)Valid Upto 31 Mar 2020
(v)File No. MPCB/TB-CON-12(2010)/2017-2018/29
(vi)Application No. MPCB/TB-CON-12(2010)/2017-2018/29
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 186
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.390
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Nil0.0OthersNANAOthersNA0.0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2018 To 30 Apr 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube69.1343.4756.80100
(2.)NOxMicro Gram per Meter Cube24.0910.2013.2280
(3.)OthersCOMicro Gram per Meter Cube0.990.110.5904
(4.)PM2.5Micro Gram per Meter Cube55.1527.2441.5560
(5.)SO2Micro Gram per Meter Cube9.994.947.5880
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.386.446.58.5
(2.)TDSmg/l66.153.2500500
(3.)Fluoridemg/l0.10.11.01.5
(4.)Heavy Metalsiron (Fe)mg/l0.10.10.30.3
(5.)TSSmg/l5050100100
(6.)Total Hardnessmg/l4632200600
(7.)Chloridesmg/l9.54.52501000
    14.3.     No. of Surface Water monitoring locations : 03
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.86.3A
(2.)BODmg/l2.21.2A
(3.)OthersTDSmg/l34.828.1A
(4.)CODmg/l00A
(5.)pHNA6.886.72A
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.548.265
(2.)Leq(Night)A-weighted decibels(dB(A))54.248.655
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram16300200
(2.)P(Phosphorus)Milligram per Kilogram180080
(3.)K(Potassium)Milligram per Kilogram407.0673.12
(4.)Electric ConductivityMillisiemens per Centimetre108.249.5
(5.)pH6.925.77
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.75 To 8.47
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.09 To 4.20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Others27 KLD fresh water and 18 KLD STP treated water450Copy of Permission LettermodeOthersNATube WellCGWA/09 Nov 201345
(2.)Others27 KLD Fresh water and 18 KLD STP treated water450Copy of Permission LettermodeOthersNATube WellCGWA/09 Nov 201345.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic4050STPOtherslandscaping, general washing, flushing400
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 40
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 40
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)domestic solid wasteMunicipal Solid Waste3.0Tons0.0RoadOthersmunicipal department
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube24.090.011.9036.080
(2.)PM2.5Microgram per Meter Cube0.00.00.00.160
(3.)PM10Microgram per Meter Cube69.130.00.31769.45100
(4.)SO2Microgram per Meter Cube9.990.02.0812.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD3.80.15PM1069.45
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 150
(b)Source MPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 02 no. DG set (380 kVA)
(e)Stack Height (in m) 3.8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.0
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 168.42
    Total Land (ha.) 168.42
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.0
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : 168.42 168.42
    Total (ha.) 168.42
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersexpansion of airport168.42
Total (ha.) 168.42
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanone10none in 10 km radius
(2.)Wildlife Corridorsnone10none in 10 km radius
(3.)Corridorsnone10none in 10 km radius
(4.)ESAsnone10none in 10 km radius
(5.)NPAnone10none in 10 km radius
(6.)ESZsnone10none in 10 km radius
(7.)WLSnone10none in 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnone10none in 10 km radius
(2.)Archaeological Sitesnone10none in 10 km radius
(3.)Defence Installationsnone10none in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 168.42
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 2
(b)No. of Households 180
(c)No. of PDFs (Project Displaced Families) 100
(d)No. of PAFs (Project Affected Families) 100
(e)Funds Allocated for R&R(in INR) (in Lacs) 3700
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 202500/-
(iii)Period of Implementation project life
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Umiam Lake
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 7.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7.712.520.2
(2.)Percentage of Total Project Area101020
(3.)No. of Plants250018004300
(4.)Funds Allocated550000375000925000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe project will boost economic growth benefiting the whole region through the generation of both direct and indirect economic value. The construction and operation of airport will generate direct employment opportunity, indirectly contributed jobs through supply chain, enhance induced impact through tourism. Thus the project will prove beneficial to the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 140 ECS
5.
Energy Saving Measures:
(a)Source/Mode proposed solar panels
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No adverse impact is envisaged
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Meghalaya
(d)Case No. MCWP(C)No 79 of 2016
(e)Orders/Directions of the court ,if any and its relevance with the proposed project reconstitution of monitoring committee
(f)Case Details MCWP(C)No 79 of 2016
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026
(ii)Name of the EIA Consultant Gaurang Environmental solutions, Jaipur
(iii)Address #102, SNG, Shri Ratna Apartment, near Tambi Petrol Pump, Bani Park,Peetal factory, Jhotwara road, Jaipur-302016
(iv)Mobile No. 9782074776
(v)Landline No. 0141242911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAKindly submit the following: (i) Submit EIA/EMP report containing cover page, index and chapters in conformance with the EIA notification, 2006. (ii) As per ToR conditions Public hearing issues raised and commitments made by the project proponent on the same should be included in EIA/EMP Report in the form of tabular chart with financial budget for complying with the commitments made. (iii) Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018 is not given in EIA/EMP Report. 09 May 2019
2.NAThe correction have been made as per the instruction received 12 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPS DEVAKUMAR
DesignationAGM
Name of Company (Applicant Name should not be given here)AIRPORTS AUTHORITY OF INDIA SHILLONG
AddressSHILLONG AIRPORT UMAROI DISTRICT-RI-BHOI, MEGHALAYA-793103
Print