Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Satdharu Medium Irrigation Project in CCA of 7555 ha. At village Badyau, Tehsil & District Damoh (M.P.)
(b)Name of the Company / Organisation WRD DAMOH
(c)Registered Address WRD EE Damoh,Damoh,Damoh,Rajasthan-470661
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S K Jatav
(b)Designation (Owner/ Partner/ CEO) Executive Engineer
(c)Address WRD EE Damoh,Damoh,Damoh,Damoh,Madhya Pradesh-470661
(d)Pin code 470661
(e)E-mail wrddamoh@gmail.com
(f)STD Code. 7812(f)Telephone No. 222779
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/RIV/67589/2017
(d)Master Proposal Number(Single Window) SW/103858/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. -
(b)Pincode 470661
(c)Bounded Latitudes (North)
From
Degree 2620964.00
Minutes
Second
From
Degree 2621450.79
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 342099.00
Minutes
Second
From
Degree 342279.58
Minutes
Second
(e)Survey of India Topo Sheet No. 55M/6, 55M/3 and 55M/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 422
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshDamohDamoh
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/27/2017-IA.I (R)
(b)Date of Apply of TOR 29 Aug 2017
(c)Date of Issue of TOR / Standard ToR 12 Oct 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :28 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :2
Gram Panchayat Bhawan
State :Madhya Pradesh
District :Damoh
Tehsil :Damoh
Village :Badyau
48Adequate Compensation for their assets, adequate provision for drinking waterOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)57.5 m long spillwayPiped gravity pipe lines for Irrigation
(2.)Distribution network (18.70 kms)-119.86% annual irrigation intensity
(3.)755m long, height 24.5m earthern damHydraulic structure of Composite dam
(4.)1 RCC irrigation sluice(7.5mX6.65m)-
(5.)5.5 km rising main-Irrigation project for CCA of 7555 ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CCA7555HectaresOthersPiped gravity pipe lines
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 315.65
(b) Funds Allocated for Environment Management (Capital) (in Crores) 124.41
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.77
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 374727
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 374727
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Earth for Dam320026OtherscumLocalRoad80 OthersAgreementCopy of Linkage
(2.)Aggregate/ Boulder54701OtherscumLocalRoad50 OthersRiverbedCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 14 Mar 2018 To 11 Jun 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 06
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube35.9531.8935.9160
(2.)SO2Micro Gram per Meter Cube6.865.376.8480
(3.)NOxMicro Gram per Meter Cube16.4414.3516.3780
(4.)PM10Micro Gram per Meter Cube59.355.159.24100
    14.2.     No. of Ground Water monitoring locations : 04
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4904705002000
(2.)Total Hardnessmg/l432.9411.8200600
(3.)OthersNitratemg/l28.7212.69450
(4.)TSSNA0000
(5.)Chloridesmg/l139.5101.62501000
(6.)pHNA7.756.966.58.5
(7.)Fluoridemg/l0.940.621.01.5
    14.3.     No. of Surface Water monitoring locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA87.8C
(2.)DOmg/l5.14.8C
(3.)CODmg/l14.414.1C
(4.)BODmg/l9.69.4C
    14.4.     No. of Ambient Noise monitoring locations : 06
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))50.148.355
(2.)Leq(Night)A-weighted decibels(dB(A))38.336.045
    14.5.     No. of Soil Sample Monitored locations : 06
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram396.85138.26
(2.)Electric ConductivityOthersmicro seimens per centimeter383.4211.3
(3.)pH7.697.54
(4.)N(Nitrogen)Milligram per Kilogram7661
(5.)P(Phosphorus)Milligram per Kilogram6.895.48
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.62 To 25.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.20 To 10.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGround & Surface Water2000Copy of Permission LetterPipelineTube WellNA30 Apr 201900
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater by 160 persons12.815STPGreen Belt Renewal Plant12.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 12.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 12.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DomesticMunicipal Solid Waste43.2Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube56.42.445.562100
(2.)PM2.5Microgram per Meter Cube02.4400.00160
(3.)NOxNA02.4400.000180
(4.)SO2NA02.4400.000180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00NOx0
(2.)NANA00PM100
(3.)NANA00SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 220
(b)Source Nearest sub-station
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2*125KVA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 789.93
(b)Private Land (ha.) 212.86
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 223.55
(e)Other Land (ha.) 0
    Total Land (ha.) 1226.34
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19175
(b)Waste/Barren Land (ha.) 4327
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 705
(e)Settlements (ha.) 279
(f)Industrial (ha.) 0
(g)Forest (ha.) 13039
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 37525
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersSubmergence/Dam seat1226.34Agri:212.86 ha,Forest:789.93 ha: Rev (223.55 ha)
Total (ha.) 1226.34
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNauradehi WLS5Within 10km from project's reservoir tip. more than 5 km of ESZ- WLS
(2.)Wildlife CorridorsNA0Not Applicable
(3.)WLSNA0Not Applicable
(4.)ESAsNA0Not Applicable
(5.)NPANA0Not Applicable
(6.)Critically Polluted AreaNA0Not Applicable
(7.)CorridorsNA0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Defence InstallationsNA00
(3.)Archaeological SitesNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/MP/IRRIG/29283/2017
(ii)Date of In-Principle (Stage-I) approval 11 May 2018
(iii)Area diverted 0
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved/Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 212.86
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 5
(b)No. of Households 130
(c)No. of PDFs (Project Displaced Families) 84
(d)No. of PAFs (Project Affected Families) 526
(e)Funds Allocated for R&R(in INR) (in Lacs) 3030.0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 1 Schedule I species (Grey Wolf).
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 30 lakhs
(iii)Period of Implementation Within Project time frame
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Satdharu Nala, Bearma River
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Yes, water for irrigation shall be diverted
(ii)Details of Study Conducted Water Availability Studies carried out
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chakra Nala
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 485
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Total Area of Green Belt 37
(b)Percentage of Total Project Area 3.02
(c)No. of Plants to be Planted 56500
(d)Funds Allocated for Plantation 6600000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncreased Green cover, Improvement in Ground Water Level, Conservation of Forest and fuel, Social Forestry
(2.)SocialEmployment Potential / Fisheries, Sustained Water Availability for Agriculture, Industrialization, Drinking and Cattle rearing., Increase in Health Care Facilities, Improvement in Life Style, Status and Confidence-building, Command Area Development, Solution of the problem of migration
(3.)FinancialIncreased Irrigation Potential, Improved Market Facilities, Tourism / Recreation Facilities, Economic Upliftment due to Draw Down Cultivation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Satdharu River, tributary of Bearma
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam24.87551226.3411623755590557555
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %86.971987Storage Capacity in MCM
(2.)75 %63.031986Storage Capacity in MCM
(3.)90 %23.561989Storage Capacity in MCM
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 344457
(c) Utilized for Construction (in cubic meter)87712
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)24
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 3
(c) Name of the umbrella Fish Species (Scientific Name)Carps Catla (Catla catla), Rohu (Labeo rohita) & M
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Non-Lean Non-Monsoon0.000.0044
(2.)Monsoon15.330
(3.)Lean0.000.0044
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0114
(ii)Name of the EIA Consultant VOYANTS SOLUTIONS PRIVATE LIMITED
(iii)Address 403, 4TH FLOOR, PARK CENTRA, SECTOR-30, NH-8, GURUGRAM-122001, INDIA
(iv)Mobile No. 9989673334
(v)Landline No. 0124459820
(vi)Email Id santosh@voyants.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 09 Jun 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterPoint wise replies to the Additional Details Sought for Item No. 24.4 {proposal reference No. IA/MP/RIV/67589/2018 & F. No. J-12011/27/2017-IA. I (R)} as per 24th EAC Meeting, MoM dated 27th of May, 2019 uploaded herein. 17 Aug 2020
2.NA

ok

25 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS K Jatav
DesignationExecutive Engineer
Name of Company (Applicant Name should not be given here)WRD DAMOH
AddressWRD EE Damoh
Print