1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Jagannath OCP EXPANSION | (b)Name of the Company / Organisation | JAGANNATH OCP OF MAHANADI COALFIELDS LIMITED | (c)Registered Address | Project Officer,
Jagannath Open Cast Project,
AT + P.O. – Balanda,
Talcher,,Angul,Orissa-759116 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Santa Kumar Choudhary | (b)Designation (Owner/ Partner/ CEO) | Project Officer | (c)Address | Project Officer,
Jagannath Open Cast Project,
AT + P.O. – Balanda,
Talcher,,Talcher Sadar,Angul,Orissa-759116 | (d)Pin code | 759116 | (e)E-mail | pojagannathmcl@gmail.com | (f)STD Code. | 6760(f)Telephone No. | 260212 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 7(h) Common Effluent Treatment Plants (CETPs)
| (b)Category | A | (c)Proposal Number | IA/OR/CMIN/57703/2016 | (d)Master Proposal Number(Single Window) | SW/103611/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 103, 105, 106, 113, 115, 116 | (b)Pincode | 759116 | (c)Bounded Latitudes (North) | | From | | Degree | 205614 | Minutes | | Second | | From | | Degree | 205842 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 850710 | Minutes | | Second | | From | | Degree | 850955 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73 H/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 135 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 100 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Kendujhar | Barbil | Nuagaon, Guali, Topadihi, Barpada & Katasahi | (2.) | Orissa | Angul | Talcher Sadar | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/177/2005-IA.II(M) | (c)Date of Issue of TOR | 16 Aug 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 May 2018 | (c)Date of Issue of EC | 06 Sep 2018 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 19 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| Jagannath Kalakendra | State : | Orissa | District : | Angul | Tehsil : | Talcher Sadar | Village : | Jagannath Area |
| 45 | Issues were regarding employment,education,health care facility, drinking water facility,afforestation,dust control,pollution control measures etc. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-1063/EPE/48 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 18 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal Mining | 6 | 1.5 | 7.5 | Others | MTPA | Road,Rail,Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Opencast Coal Mining | 6 | 1.5 | 7.5 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Mar 2019 | (iv)Valid Upto | 30 Sep 2019 | (v)File No. | 3372/IND-I-CON-199 | (vi)Application No. | 2304930 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 409.08 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 6.27 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.54 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 17.67 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 27.66 | (b)Existing quantity of raw material/fuel | 20.30 | (c)Total quantity of raw material/fuel | 47.96 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Fuel Energy | 9127 | Tons per Annum | | Local | Road | | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Nov 2017 To 02 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.74 | 61.20 | 93.16 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58.84 | 23.66 | 55.24 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 25.40 | 7.40 | 24.26 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 35.97 | 12.41 | 33.52 | 80 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 341 | 88 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 188 | 44 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 1.11 | 0.06 | 1 | 1.5 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | mg/l | | 28 | 4 | 250 | 1000 | (6.) | pH | | | Others | NA | 7.5 | 7.23 | 6.5 | 8.5 | (7.) | Heavy Metals | | Iron as Fe | mg/l | | 0.19 | 0.08 | 0.3 | 1 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.48 | 7.11 | C | (2.) | Others | TDS | mg/l | | 448 | 175 | C | (3.) | BOD | | mg/l | | 2 | 2 | C | (4.) | COD | | mg/l | | 0 | 0 | C | (5.) | DO | | mg/l | | 5.6 | 4.9 | C | |
14.4. No. of Ambient Noise monitoring locations : 4 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 62.3 | 50.3 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 56.2 | 41.6 | 70 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | mhos/cm | 154 | 128 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 190 | 136 | (3.) | pH | | | 7.21 | 6.12 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 12 | 4.5 | (5.) | K(Potassium) | Milligram per Kilogram | | 214 | 74 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.80 To 13.27 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.05 To 9.85 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/1902/OR/MIN/2018 | (f)Date of Issue | 29 Jun 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 507.5 | 7.5 | Copy of Permission Letter | Pipeline | | Others | pumping | Agreement no. 01 (tw) 2000-2001-9 | 12 Jan 2010 | 507.5 | (2.) | Others | Mine Water | 1711.8 | 0 | Copy of Permission Letter | Pipeline | | Others | pumping | NA | 26 Apr 2019 | 1711.8 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine Water | 2958 | 9600 | ETP | Reuse within the Plant & Recycling | | 2958 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2958 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2958 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Overburden | Industrial Waste | | 18130560 | Tons | 0 | Road | | Others | landfills | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 78.16 | 0 | 34 | 112.167 | 300 | (2.) | NOx | | Microgram per Meter Cube | 33.52 | 0 | 2.45 | 35.978 | 120 | (3.) | Others(Specify) | NA | NA | 0 | 0 | 0 | 0.00001 | NA | (4.) | PM2.5 | | Microgram per Meter Cube | 43.57 | 0 | 8.50 | 52.071 | NA | (5.) | SO2 | | Microgram per Meter Cube | 24.26 | 0 | 1.14 | 25.41 | 120 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | Others | NA | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60000 | (b)Source | 132/33 kV, Nandira Substation (MCL) | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 82.736 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 495.69 | Total Land (ha.) | 578.426 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 106.75 | (b)Waste/Barren Land (ha.) | 182.52 | (c)Grazing/ Community Land (ha.) | 151.42 | (d)Surface Water Bodies (ha.) | 55 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 82.736 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 578.4259999999999 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | OB Dump Area | | 36.470 | | (2.) | Quarry Area | | 476.726 | | (3.) | Built Up Area | | 40.750 | | (4.) | Others | Wasteland | 24.480 | | (5.) | Main Plant | | 0 | | (6.) | Township | | 0 | | (7.) | Green belt | | 0 | | (8.) | Ash Pond | | 0 | | (9.) | Safety Zone | | 0 | | (10.) | Tailing Pond | | 0 | | (11.) | LandFill | | 0 | | (12.) | Water Reservoir | | 0 | | (13.) | Desalination Plant | | 0 | | (14.) | Area for Solid Waste Management | | 0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Jagannath OCP | 0 | Mine is itself under CPA | (2.) | NPA | NA | 0 | NA | (3.) | Corridors | NA | 0 | NA | (4.) | Wildlife Corridors | NA | 0 | NA | (5.) | ESZs | NA | 0 | NA | (6.) | ESAs | NA | 0 | NA | (7.) | WLS | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Makundanali | 1.8 | Reserve Forest | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | (4.) | Others | NA | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 578.426 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 2 | (b)No. of Households | 2079 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 230 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 919 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Brahmani River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 7.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 194 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 194 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 8.15 | 0 | 8.15 | (2.) | No. of Plants | 20375 | 0 | 20375 | (3.) | Percentage of Total Project Area | 1.4 | 0 | 1.4 | (4.) | Funds Allocated | 6100000 | 5100000 | 11200000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project is likely to give a boost to the economy of the area and providing primary and secondary sectors employment to the local people. The project will lead to the development of ancillary industries and the overall economic growth of nearby towns to supplement the population of the area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 7.5 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | F.N0.34012/(04)/2011-CPAM | (b)Date of Approval | 16 May 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 553.946 | (f)Approved Capacity | 7.5 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 82.97 | (b)Mineable Reserves (Million Ton) | 72.14 | (c)Extractable Reserves(Million Ton) | 72.14 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | G 12 | (f)Stripping Ratio | 1.09 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 3-5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 10 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 6 | (c)Thickness of seams to be worked on | 19.125 | (d)Maximum Thickness of Seams (metres) | 36.55 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 553.946 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Acquired under CBA(A&D) act 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.002 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 2.5107 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 227.401 (hectare) at a Depth of 165 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 476.726 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | 7.5 MT Surface Miner Coal through Tippers | (b)Surface to Siding/Loading | Surface to TTPS : 2 MTPA through belt conveyor,Sur | (c)Transportation / Conveyor Details | NA | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 106.75 | 0 | 106.75 | (2.) | FOREST LAND | | 82.736 | 0 | 82.736 | (3.) | SURFACE WATER BODIES | | 55 | 0 | 55 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | OTHERS(Specify) | NA | 0 | 0 | 0 | (6.) | WASTE LAND | | 158.04 | 24.48 | 182.52 | (7.) | GRAZING LAND | | 151.42 | 0 | 151.42 | |
TOTAL | 553.946 | 24.48 | 578.426 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 229.15 | 227.401 | 0 | | 456.551 | (2.) | EXTERNAL OB DUMPS | | 36.47 | 0 | 0 | | 36.47 | (3.) | GREEN BELT | | 8.15 | 0 | 0 | | 8.15 | (4.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (5.) | ROADS | | 0 | 0 | 0 | | 0 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 32.60 | | 32.6 | (7.) | Other | Wasteland | 0 | 0 | 24.48 | | 24.48 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (9.) | VIRGIN AREA | | 20.175 | 0 | 0 | | 20.175 | |
TOTAL | 293.945 | 227.401 | 57.08 | 0 | 578.426 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 36.47 | (b)Internal Dump(in hectare) | 249.325 | (c)Quarry(in hectare) | 476.726 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 227.401 (hectare) at a Depth of 165 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 13.05 | (h)Total afforestation plant (in hectare) | 144.62 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2011 | 6 | 6 | 6 | 6 | 0 | (2.) | 2007 | 6 | 0 | 6 | 5.31 | 0 | (3.) | 2006 | 6 | 0 | 6 | 5.57 | 0 | (4.) | 2002 | 0 | 0 | 0 | 5.20 | 0 | (5.) | 1998 | 0 | 0 | 0 | 5.40 | 0 | (6.) | 1994 | 0 | 0 | 0 | 5.51 | 0 | (7.) | 1987 | 0 | 0 | 0 | 2.20 | 0 | (8.) | 1985 | 0 | 0 | 0 | 2.33 | 0 | (9.) | 1981 | 0 | 0 | 0 | 0.87 | 0 | (10.) | 1975 | 0 | 0 | 0 | 0.40 | 0 | (11.) | 1973 | 0 | 0 | 0 | 0.15 | 0 | (12.) | 1983 | 0 | 0 | 0 | 1.75 | 0 | (13.) | 2018 | 7.5 | 7.5 | 7.5 | 5.014 | 0 | (14.) | 2017 | 6 | 6 | 6 | 3.61 | 0 | (15.) | 2016 | 6 | 6 | 6 | 3.34 | 0 | (16.) | 2013 | 6 | 6 | 6 | 6 | 0 | (17.) | 2012 | 6 | 6 | 6 | 6 | 0 | (18.) | 2010 | 6 | 4.4 | 6 | 6.33 | 0.33 | (19.) | 2009 | 6 | 0 | 6 | 5.70 | 0 | (20.) | 2008 | 6 | 0 | 6 | 5.42 | 0 | (21.) | 2005 | 6 | 0 | 6 | 4.45 | 0 | (22.) | 2004 | 0 | 0 | 0 | 3.57 | 0 | (23.) | 2001 | 0 | 0 | 0 | 5.69 | 0 | (24.) | 2000 | 0 | 0 | 0 | 5.43 | 0 | (25.) | 1997 | 0 | 0 | 0 | 5.49 | 0 | (26.) | 1996 | 0 | 0 | 0 | 5.60 | 0 | (27.) | 1995 | 0 | 0 | 0 | 5.53 | 0 | (28.) | 1993 | 0 | 0 | 0 | 5.15 | 0 | (29.) | 1992 | 0 | 0 | 0 | 5.50 | 0 | (30.) | 1991 | 0 | 0 | 0 | 5.18 | 0 | (31.) | 2015 | 6 | 6 | 6 | 4.36 | 0 | (32.) | 2003 | 0 | 0 | 0 | 4.34 | 0 | (33.) | 1990 | 0 | 0 | 0 | 4.30 | 0 | (34.) | 1989 | 0 | 0 | 0 | 3.21 | 0 | (35.) | 1988 | 0 | 0 | 0 | 2.50 | 0 | (36.) | 1986 | 0 | 0 | 0 | 2.02 | 0 | (37.) | 1984 | 0 | 0 | 0 | 2.21 | 0 | (38.) | 1980 | 0 | 0 | 0 | 0.89 | 0 | (39.) | 1978 | 0 | 0 | 0 | 0.62 | 0 | (40.) | 1977 | 0 | 0 | 0 | 0.42 | 0 | (41.) | 1976 | 0 | 0 | 0 | 0.39 | 0 | (42.) | 1974 | 0 | 0 | 0 | 0.21 | 0 | (43.) | 1971 | 0 | 0 | 0 | 0.03 | 0 | (44.) | 1979 | 0 | 0 | 0 | 0.58 | 0 | (45.) | 1972 | 0 | 0 | 0 | 0.06 | 0 | (46.) | 2014 | 6 | 6 | 6 | 2.65 | 0 | (47.) | 1999 | 0 | 0 | 0 | 5.02 | 0 | (48.) | 1982 | 0 | 0 | 0 | 1.17 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/01/12/002 | (ii)Name of the EIA Consultant | CMPDIL | (iii)Address | Gondwana Palace, Kanke Road Ranchi | (iv)Mobile No. | 8987788960 | (v)Landline No. | 0651223005 | (vi)Email Id | gmenv.cmpdi@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The proposal is already under consideration as violation case by the concerned EAC in pursuance of the Ministry's Notification dated 14/3/2017. | 11 May 2019 | 2. | NA | The correction have been made as per the instruction received | 15 May 2019 | 3. | NA | Please see our observations dated 11/5/2019 for necessary action at your end. | 18 May 2019 | 4. | NA | The correction have been made as per the instruction received | 19 Jun 2019 | 5. | NA | Please confirm present status of the proposal under consideration by EAC (Violation). | 11 Aug 2019 | 6. | NA | The correction have been made as per the instruction received | 12 Aug 2019 | 7. | NA | May kindly peruse the statement against the sl.no.1 in Form-2 and covering letter. The declaration regarding involvement of violation is contradictory. Since the proposal involves the violation of EIA Notification, 2006, you are requested to make application in violation sector under the provisions of SO 804(E). Reverting the proposal in the coal mining sector, where no violation cases dealt will not have any use. Kindly understand the provisions and make the application in the proper sector. | 11 Oct 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Santa Kumar Choudhary | Designation | Project Officer | Name of Company (Applicant Name should not be given here) | JAGANNATH OCP OF MAHANADI COALFIELDS LIMITED | Address | Project Officer,
Jagannath Open Cast Project,
AT + P.O. – Balanda,
Talcher |
|