1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jagannath OCP EXPANSION
(b)Name of the Company / Organisation JAGANNATH OCP OF MAHANADI COALFIELDS LIMITED
(c)Registered Address Project Officer, Jagannath Open Cast Project, AT + P.O. – Balanda, Talcher,,Angul,Orissa-759116
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Santa Kumar Choudhary
(b)Designation (Owner/ Partner/ CEO) Project Officer
(c)Address Project Officer, Jagannath Open Cast Project, AT + P.O. – Balanda, Talcher,,Talcher Sadar,Angul,Orissa-759116
(d)Pin code 759116
(e)E-mail pojagannathmcl@gmail.com
(f)STD Code. 6760(f)Telephone No. 260212
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Category A
(c)Proposal Number IA/OR/CMIN/57703/2016
(d)Master Proposal Number(Single Window) SW/103611/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 103, 105, 106, 113, 115, 116
(b)Pincode 759116
(c)Bounded Latitudes (North)
From
Degree 205614
Minutes
Second
From
Degree 205842
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 850710
Minutes
Second
From
Degree 850955
Minutes
Second
(e)Survey of India Topo Sheet No. 73 H/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 135
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 100
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKendujharBarbilNuagaon, Guali, Topadihi, Barpada & Katasahi
(2.)OrissaAngulTalcher Sadar
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/177/2005-IA.II(M)
(c)Date of Issue of TOR 16 Aug 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 May 2018
(c)Date of Issue of EC 06 Sep 2018
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :2
Jagannath Kalakendra
State :Orissa
District :Angul
Tehsil :Talcher Sadar
Village :Jagannath Area
45Issues were regarding employment,education,health care facility, drinking water facility,afforestation,dust control,pollution control measures etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-1063/EPE/48
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 18 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Mining61.57.5OthersMTPARoad,Rail,Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Opencast Coal Mining61.57.5
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Mar 2019
(iv)Valid Upto 30 Sep 2019
(v)File No. 3372/IND-I-CON-199
(vi)Application No. 2304930
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 409.08
(b) Funds Allocated for Environment Management (Capital) (in Crores) 6.27
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.54
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 17.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 27.66
(b)Existing quantity of raw material/fuel 20.30
(c)Total quantity of raw material/fuel 47.96
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel Energy9127Tons per AnnumLocalRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Nov 2017 To 02 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.7461.2093.16100
(2.)PM2.5Micro Gram per Meter Cube58.8423.6655.2460
(3.)SO2Micro Gram per Meter Cube25.407.4024.2680
(4.)NOxMicro Gram per Meter Cube35.9712.4133.5280
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l341885002000
(2.)Total Hardnessmg/l18844200600
(3.)Fluoridemg/l1.110.0611.5
(4.)TSSmg/l0000
(5.)Chloridesmg/l2842501000
(6.)pHOthersNA7.57.236.58.5
(7.)Heavy MetalsIron as Femg/l0.190.080.31
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.487.11C
(2.)OthersTDSmg/l448175C
(3.)BODmg/l22C
(4.)CODmg/l00C
(5.)DOmg/l5.64.9C
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.350.375
(2.)Leq(Night)A-weighted decibels(dB(A))56.241.670
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersmhos/cm154128
(2.)N(Nitrogen)Milligram per Kilogram190136
(3.)pH7.216.12
(4.)P(Phosphorus)Milligram per Kilogram124.5
(5.)K(Potassium)Milligram per Kilogram21474
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.80 To 13.27
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 9.85
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/1902/OR/MIN/2018
(f)Date of Issue 29 Jun 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface507.57.5Copy of Permission LetterPipelineOtherspumpingAgreement no. 01 (tw) 2000-2001-912 Jan 2010507.5
(2.)OthersMine Water1711.80Copy of Permission LetterPipelineOtherspumpingNA26 Apr 20191711.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Mine Water29589600ETPReuse within the Plant & Recycling2958
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2958
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2958
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenIndustrial Waste18130560Tons0RoadOtherslandfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.16034112.167300
(2.)NOxMicrogram per Meter Cube33.5202.4535.978120
(3.)Others(Specify)NANA0000.00001NA
(4.)PM2.5Microgram per Meter Cube43.5708.5052.071NA
(5.)SO2Microgram per Meter Cube24.2601.1425.41120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60000
(b)Source 132/33 kV, Nandira Substation (MCL)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 82.736
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 495.69
    Total Land (ha.) 578.426
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 106.75
(b)Waste/Barren Land (ha.) 182.52
(c)Grazing/ Community Land (ha.) 151.42
(d)Surface Water Bodies (ha.) 55
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 82.736
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 578.4259999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OB Dump Area36.470
(2.)Quarry Area476.726
(3.)Built Up Area40.750
(4.)OthersWasteland24.480
(5.)Main Plant0
(6.)Township0
(7.)Green belt0
(8.)Ash Pond0
(9.)Safety Zone0
(10.)Tailing Pond0
(11.)LandFill0
(12.)Water Reservoir0
(13.)Desalination Plant0
(14.)Area for Solid Waste Management0
Total (ha.) 578.426
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaJagannath OCP0Mine is itself under CPA
(2.)NPANA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)ESZsNA0NA
(6.)ESAsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMakundanali1.8Reserve Forest
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 578.426
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 2
(b)No. of Households 2079
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 230
(e)Funds Allocated for R&R(in INR) (in Lacs) 919
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Brahmani River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 194
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 194
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt8.1508.15
(2.)No. of Plants20375020375
(3.)Percentage of Total Project Area1.401.4
(4.)Funds Allocated6100000510000011200000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project is likely to give a boost to the economy of the area and providing primary and secondary sectors employment to the local people. The project will lead to the development of ancillary industries and the overall economic growth of nearby towns to supplement the population of the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 7.5
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. F.N0.34012/(04)/2011-CPAM
(b)Date of Approval 16 May 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 553.946
(f)Approved Capacity 7.5
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 82.97
(b)Mineable Reserves (Million Ton) 72.14
(c)Extractable Reserves(Million Ton) 72.14
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral G 12
(f)Stripping Ratio 1.09 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 3-5
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 6
(c)Thickness of seams to be worked on 19.125
(d)Maximum Thickness of Seams (metres) 36.55
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 553.946
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Acquired under CBA(A&D) act 1957
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Acquired under CBA(A&D) act 1957
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Acquired under CBA(A&D) act 1957
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.002
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 2.5107
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 227.401 (hectare) at a Depth of 165 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 476.726
13.
Details of Transportation:
(a)In Pit/Underground to Surface 7.5 MT Surface Miner Coal through Tippers
(b)Surface to Siding/Loading Surface to TTPS : 2 MTPA through belt conveyor,Sur
(c)Transportation / Conveyor Details NA
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND106.750106.75
(2.)FOREST LAND82.736082.736
(3.)SURFACE WATER BODIES55055
(4.)SETTLEMENTS000
(5.)OTHERS(Specify)NA000
(6.)WASTE LAND158.0424.48182.52
(7.)GRAZING LAND151.420151.42
TOTAL553.94624.48578.426
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY229.15227.4010456.551
(2.)EXTERNAL OB DUMPS36.470036.47
(3.)GREEN BELT8.15008.15
(4.)TOP SOIL STORAGE0000
(5.)ROADS0000
(6.)BUILT UP AREA (COLONY/OFFICE)0032.6032.6
(7.)OtherWasteland0024.4824.48
(8.)INTERNAL OB DUMPS0000
(9.)VIRGIN AREA20.1750020.175
TOTAL293.945227.40157.080578.426
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 36.47
(b)Internal Dump(in hectare) 249.325
(c)Quarry(in hectare) 476.726
(d)Safety Zone(in hectare) 0
(e)Final Void of 227.401 (hectare) at a Depth of 165 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 13.05
(h)Total afforestation plant (in hectare) 144.62
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 355.656
Total Area Backfilled after Excavation (in hectare) 199.65
Total Area Reclaimed (in hectare) 129.15
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201166660
(2.)20076065.310
(3.)20066065.570
(4.)20020005.200
(5.)19980005.400
(6.)19940005.510
(7.)19870002.200
(8.)19850002.330
(9.)19810000.870
(10.)19750000.400
(11.)19730000.150
(12.)19830001.750
(13.)20187.57.57.55.0140
(14.)20176663.610
(15.)20166663.340
(16.)201366660
(17.)201266660
(18.)201064.466.330.33
(19.)20096065.700
(20.)20086065.420
(21.)20056064.450
(22.)20040003.570
(23.)20010005.690
(24.)20000005.430
(25.)19970005.490
(26.)19960005.600
(27.)19950005.530
(28.)19930005.150
(29.)19920005.500
(30.)19910005.180
(31.)20156664.360
(32.)20030004.340
(33.)19900004.300
(34.)19890003.210
(35.)19880002.500
(36.)19860002.020
(37.)19840002.210
(38.)19800000.890
(39.)19780000.620
(40.)19770000.420
(41.)19760000.390
(42.)19740000.210
(43.)19710000.030
(44.)19790000.580
(45.)19720000.060
(46.)20146662.650
(47.)19990005.020
(48.)19820001.170
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/01/12/002
(ii)Name of the EIA Consultant CMPDIL
(iii)Address Gondwana Palace, Kanke Road Ranchi
(iv)Mobile No. 8987788960
(v)Landline No. 0651223005
(vi)Email Id gmenv.cmpdi@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe proposal is already under consideration as violation case by the concerned EAC in pursuance of the Ministry's Notification dated 14/3/2017. 11 May 2019
2.NAThe correction have been made as per the instruction received 15 May 2019
3.NAPlease see our observations dated 11/5/2019 for necessary action at your end. 18 May 2019
4.NAThe correction have been made as per the instruction received 19 Jun 2019
5.NAPlease confirm present status of the proposal under consideration by EAC (Violation). 11 Aug 2019
6.NAThe correction have been made as per the instruction received 12 Aug 2019
7.NAMay kindly peruse the statement against the sl.no.1 in Form-2 and covering letter. The declaration regarding involvement of violation is contradictory. Since the proposal involves the violation of EIA Notification, 2006, you are requested to make application in violation sector under the provisions of SO 804(E). Reverting the proposal in the coal mining sector, where no violation cases dealt will not have any use. Kindly understand the provisions and make the application in the proper sector. 11 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanta Kumar Choudhary
DesignationProject Officer
Name of Company (Applicant Name should not be given here)JAGANNATH OCP OF MAHANADI COALFIELDS LIMITED
AddressProject Officer, Jagannath Open Cast Project, AT + P.O. – Balanda, Talcher