Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Commercial Building Project (2.518 Acres)
(b)Name of the Company / Organisation M/S VASAVI DEVELOPERS REP. BY SRI. VIJAY KUMAR YERRAM & OTHERS
(c)Registered Address 8-2-269/S/59 Sagar Society Road No 2 Banjara Hills Hyderabad,,Rangareddi,Telangana-500034
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kanday Ramesh
(b)Designation (Owner/ Partner/ CEO) AuthorizationSignatory
(c)Address 8-2-269/S/59 Sagar Society Road No 2 Banjara Hills Hyderabad,,Serilingampalle,Rangareddi,Telangana-500034
(d)Pin code 500034
(e)E-mail telangana2518@gmail.com
(f)STD Code. 40(f)Telephone No. 40038621
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/MIS/103514/2019
(d)Master Proposal Number(Single Window) SW/103512/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 123,124,125,126, 136, 137
(b)Pincode 500008
(c)Bounded Latitudes (North)
From
Degree 17.424322
Minutes
Second
From
Degree 78.342102
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 17.423092
Minutes
Second
From
Degree 78.342341
Minutes
Second
(e)Survey of India Topo Sheet No. 56k7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 576
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 519
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is Schedule 8 a
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CommerciaL Project1,24,068.05Built-Up area in sq. metre
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Commercial Project124068.05Otherssq. m.Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 32
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.90
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.64
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.20
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 124068.05
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 124068.05
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)It is a construction project.0OthersNANILRoad0 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Mar 2019 To 30 Mar 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube34.928.434.480
(2.)OthersCOMicro Gram per Meter Cube9505709494000
(3.)PM2.5Micro Gram per Meter Cube53.438.253.160
(4.)SO2Micro Gram per Meter Cube7.65.97.680
(5.)PM10Micro Gram per Meter Cube90.167.489.240
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l460460200600
(2.)Heavy MetalsZincmg/l0.080.08515
(3.)pHNA7.257.256.58.5
(4.)TDSmg/l125012505002000
(5.)Fluoridemg/l0.50.511.5
(6.)TSSmg/l0000
(7.)Chloridesmg/l3263262501000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00D
(2.)BODmg/l00D
(3.)CODmg/l00D
(4.)pHNA00D
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.256.265
(2.)Leq(Night)A-weighted decibels(dB(A))44.644.655
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.86.8
(2.)K(Potassium)Milligram per Kilogram5858
(3.)N(Nitrogen)Milligram per Kilogram00
(4.)P(Phosphorus)Milligram per Kilogram00
(5.)Electric ConductivityOthersMicromhos per Centimetre418418
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Supply55110Copy of Permission LetterPipelineIntake Well022 Apr 2019551
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)commercial building307400STPGreen Belt Renewal Plant307
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 307
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 307
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal solid wasteMunicipal Solid Waste758Tons10RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube34.903.7238.6380
(2.)Others(Specify)COMicrogram per Meter Cube95000.42950.434000
(3.)PM2.5Microgram per Meter Cube53.400.20453.60560
(4.)SO2Microgram per Meter Cube7.600.628.2280
(5.)PM10Microgram per Meter Cube90.100.20490.30440
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setsdiesel850.50NOx3.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2.5
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4 DG sets 9000 KVA (4 x 2250)
(e)Stack Height (in m) 85
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.019
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.019
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Private land 0
    Total (ha.) 0
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.01Commercial building
Total (ha.) 1.01
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)ESAsMrugvani National Park6.3SSE
(3.)Wildlife CorridorsNA00
(4.)WLSKasu Brahmananda Reddy National Park13East
(5.)NPANA00
(6.)CorridorsNA00
(7.)ESZsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)OthersNANA00
(3.)ForestKotaguda RF, Gajularamaram RF3.153.15 km from kotaguda, 14.43 km from gajularamaram
(4.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.019
(b)Land yet to be acquired(Ha) 1.019
(c)Status of Land acquisition if not acquired Land has been acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 7633
(c)Temporary Employment- During Construction 4217
(d)Temporary Employment- During Operation 100
(e)No. of working days 365
(f)Total Manpower 12000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.191
(b)Percentage of Total Project Area 18.74
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 2
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 79.80
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 10192.89
(e)Total built up area (sqm) 124068.05
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 4
(d)Capacity 21.195
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2910 ECS
5.
Energy Saving Measures:
(a)Source/Mode LED lights, solar panels etc.,
(b)Percentage 30
(c)Quantity 500
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0064
(ii)Name of the EIA Consultant Grass Root Research and Creation Pvt. Ltd
(iii)Address F-375, Sector-63, Noida-201301
(iv)Mobile No. 8377904041
(v)Landline No. 0120404463
(vi)Email Id info@grc-india.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 04 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAKindly submit the following: (i) Kasu Brahmananda Reddy National Park is at a distance of 7.13 km towards East direction from the project site and Mrugvani National Park is at a distance of 6.3 km towards SSE direction. Submit status of NBWL clearance, (ii) Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 02 May 2019
2.NAThe correction have been made as per the instruction received 03 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKanday Ramesh
DesignationAuthorizationSignatory
Name of Company (Applicant Name should not be given here)M/S VASAVI DEVELOPERS REP. BY SRI. VIJAY KUMAR YERRAM & OTHERS
Address8-2-269/S/59 Sagar Society Road No 2 Banjara Hills Hyderabad
Print