1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Development Drilling wells and Testing of Hydrocarbons in Charaideo Block in Charaideo District, Assam By M/s. Oilmax Energy Private Limited
(b)Name of the Company / Organisation OILMAX ENERGY PRIVATE LIMITED
(c)Registered Address 3-A,Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion (E), Mumbai,,Tinsukia,Assam-400022
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rabi Bastia
(b)Designation (Owner/ Partner/ CEO) President
(c)Address 3-A, Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion East, Mumbai,,Pynursla,Mumbai (Suburban),Maharashtra-400022
(d)Pin code 400022
(e)E-mail oilmaxenergy.ec@gmail.com
(f)STD Code. 22(f)Telephone No. 42441100
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/AS/IND2/71708/2017
(d)Master Proposal Number(Single Window) SW/103501/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. not applicable
(b)Pincode 782445
(c)Bounded Latitudes (North)
From
Degree 25.58
Minutes
Second
From
Degree 26.25
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 94.50
Minutes
Second
From
Degree 94.54
Minutes
Second
(e)Survey of India Topo Sheet No. G46F03, G46F08
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 119
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamSibsagarSonari
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/571/2017-IA-II(I)
(b)Date of Apply of TOR 19 Dec 2017
(c)Date of Issue of TOR / Standard ToR 28 Jan 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :2
Siringpukhuri Prathamik Vidyalaya premises, Nimonagar, P.S: Mathurapur, Distt: Charaideo, Assam
State :Assam
District :Sibsagar
Tehsil :Sonari
Village :Mathurapur
120EmploymentOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Drilling rig equipment & facilities1000 HP & 2000 HP rigs
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Facilities and wells11.75HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 35.7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.72
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FUEL4Kilo Litre per DayCAPTIVERoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 27 Dec 2017 To 27 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube756.880
(2.)NOxMicro Gram per Meter Cube13.16.212.780
(3.)OthersCOMili Gram per Meter Cube0.10.10.12
(4.)PM10Micro Gram per Meter Cube48.714.148.3100
(5.)PM2.5Micro Gram per Meter Cube24.113.124.160
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.756.746.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l123305002000
(4.)Total Hardnessmg/l10013200600
(5.)Chloridesmg/l1882501000
(6.)Fluoridemg/l0.160.111.5
(7.)OthersSulphatemg/l112200400
(8.)Heavy MetalsLeadmg/l0.0010.0010.0010.001
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.117.58C
(2.)DOmg/l6.45.4C
(3.)CODmg/l166.9C
(4.)OthersTDSmg/l17098C
(5.)BODmg/l2.42C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))38.131.845
(2.)Leq(Day)A-weighted decibels(dB(A))45.840.455
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare325217
(2.)P(Phosphorus)Kilogram per hectare14873.7
(3.)Electric ConductivityMillisiemens per Centimetre0.1450.075
(4.)pH8.075.97
(5.)N(Nitrogen)Kilogram per hectare412211
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply205Copy of Permission LetterPipelineOthersTanker Supplyxyz01 Apr 201920
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater1020Modular STPReuse within the Plant & Recycling10
(2.)Drilling and rig wash45Mobile ETPReuse within the Plant & Recycling4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 14
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 14
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill cuttingsIndustrial Waste250Tons1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube24.10.2024.260
(2.)SO2Microgram per Meter Cube70.20.0757.07680
(3.)NOxMicrogram per Meter Cube13.10.20.2113.3280
(4.)PM10Microgram per Meter Cube48.70.20.2748.98100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD180.52SO20.106
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1250
(b)Source DG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVA X1
(e)Stack Height (in m) 16
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 11.75
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 11.75
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2436.52
(b)Waste/Barren Land (ha.) 11708.6
(c)Grazing/ Community Land (ha.) 10413.11
(d)Surface Water Bodies (ha.) 1836.52
(e)Settlements (ha.) 1924.28
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : roads, rail 3189.18
    Total (ha.) 31508.210000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant11
(2.)OthersDrilling0.75
Total (ha.) 11.75
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0Not applicable
(2.)NPANil0Not applicable
(3.)ESZsNil0Not applicable
(4.)CorridorsNil0Not applicable
(5.)Critically Polluted AreaNil0Not applicable
(6.)Wildlife CorridorsNil0Not applicable
(7.)ESAsNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Not applicable
(2.)Archaeological SitesNil0Not applicable
(3.)Defence InstallationsNil0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 11.75
(c)Status of Land acquisition if not acquired Ongoing
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Disang River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 25
(e)No. of working days 365
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.3
(b)Percentage of Total Project Area 28.09
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit approval of the State Government intending to permit mining of oil & gas in the said Block, and also copy of the mining lease, if any. 04 May 2019
2.NAThe correction have been made as per the instruction received 14 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRabi Bastia
DesignationPresident
Name of Company (Applicant Name should not be given here)OILMAX ENERGY PRIVATE LIMITED
Address3-A,Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion (E), Mumbai
Print