1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Tawa-II UG Expansion | (b)Name of the Company / Organisation | Western Coalfields Limited | (c)Registered Address | Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kaushik Chakraborty | (b)Designation (Owner/ Partner/ CEO) | G.M (MINING)/ ENVIRONMENT. | (c)Address | NIL | (d)Pin code | 440001 | (e)E-mail | gmenvironment.wcl@coalindia.in | (f)STD Code. | 712(f)Telephone No. | 2510151 | (g)Fax No. | 2510151 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 2(b) Mineral beneficiation
| (b)Category | A | (c)Proposal Number | IA/MP/CMIN/103388/2006 | (d)Master Proposal Number(Single Window) | SW/103381/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Hirapalla Village, Ghoradongri Tehsil, Betul Distr | (b)Pincode | 460443 | (c)Bounded Latitudes (North) | | From | | Degree | 20.166666 | Minutes | | Second | | From | | Degree | 78.166666 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 22.13333 | Minutes | | Second | | From | | Degree | 78.20000 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 55 J/4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 561.80 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.10 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Bellary | Sandur | Ittanahalli / Taranagar | (2.) | Orissa | Kendujhar | Barbil | Nuagaon, Guali, Topadihi, Barpada & Katasahi | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/53/2006-IA.II(M) | (c)Date of Issue of TOR | 25 Apr 2006 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 15 May 2019 | (c)Date of Issue of EC | 15 Jan 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 16 Dec 2011 | Distance of Public Hearing Venue from the Proposed Project : | 0.10 |
| Workshop, Tawa II mine area | State : | Madhya Pradesh | District : | Betul | Tehsil : | Ghoradongri | Village : | Hirapalla |
| 47 | 1.Plantation/Afforestation
2.Employment & compensation
3.Water conservation
4.Construction of Pucca road from Tawa Dam to Hirapalla village & transportation facility from Rajegoankhapa and Krishn | Others | Deputy Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 3-50/2006(Env)/809 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Oct 9 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 523.75 ha | 0.60 | 0.35 | 0.95 | Others | MTPA | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal Mine | UG Mine | UG Mine | UG Mine | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 29 Aug 2018 | (iv)Valid Upto | 31 Aug 2019 | (v)File No. | 19080 | (vi)Application No. | 48714 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 51.8213 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.2562 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.45 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0.209 | (b)Existing quantity of raw material/fuel | 1.159 | (c)Total quantity of raw material/fuel | 1.368 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Explosives | 750 | Others | KG/day | CIL approved vendors | Road | | 0 | LOA | | Copy of Linkage | (2.) | Power | 1.368 | Others | MW | MP Electricity Board | Others | Transmission lines | 0 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2010 To 31 Dec 2010 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 0 | (2.) | SO2 | | Micro Gram per Meter Cube | 8.9 | 6 | 8.9 | 120 | (3.) | Others | SPM | Micro Gram per Meter Cube | 254 | 106 | 250.3 | 600 | (4.) | NOx | | Micro Gram per Meter Cube | 14.9 | 8.7 | 14.4 | 120 | (5.) | PM10 | | Micro Gram per Meter Cube | 78 | 41 | 77 | 300 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | 0 to 14 | 7.3 | 6.9 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 8 | 6 | 0 | 0 | (3.) | Chlorides | | | mg/l | | 312 | 310 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | TDS | | | mg/l | | 1130 | 1070 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 562 | 482 | 300 | 600 | (7.) | Heavy Metals | | Iron | mg/l | | 0.8 | 0.6 | 0.30 | 1 | (8.) | Others | Nitrate | | mg/l | | 1.5 | 1.5 | 45 | 45 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.6 | 5.6 | C | (2.) | Others | Iron | mg/l | | 0.06 | 0.06 | C | (3.) | pH | | Others | 0 to 14 | 7.5 | 7.3 | C | (4.) | BOD | | mg/l | | 2.3 | 2.0 | C | (5.) | COD | | mg/l | | 6 | 4 | C | |
14.4. No. of Ambient Noise monitoring locations : 2 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.6 | 44.3 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.3 | 35.8 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | 0 to 14 | 7.9 | 7.9 | (2.) | P(Phosphorus) | Kilogram per hectare | | 12.2 | 10.5 | (3.) | Electric Conductivity | Others | m-mho/cm at 20 degree celcius | 0.23 | 0.21 | (4.) | K(Potassium) | Kilogram per hectare | | 36.9 | 34.5 | (5.) | N(Nitrogen) | Kilogram per hectare | | 148 | 145 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.45 To 6.20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.50 To 3.95 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/563/MP/MIN/2017 | (f)Date of Issue | 14 Dec 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine water | 875 | 0.2 | Not Appliacble | Pipeline | | Others | Pumping | 21-4/563/MP/MIN/2017 | 14 Dec 2017 | 875 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine water | 365 | 1240 | Sedimentation Tank & Pressure Filter | Discharge into Surface Water Body | | | 365 | (2.) | Mine water | 875 | 1240 | Sedimentation Tank & Pressure Filter | Reuse within the Plant & Recycling | | 875 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1240 | (b)Total Discharged Water (Kilolitre per Day) | 365 | (c)Total Reused Water (Kilolitre per Day) | 875 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Over Burden | Others | Over Burden | 0 | Tons | 0 | Others | Not applicable as it is Underground mine | Others | Not applicable as it is Underground mine | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (2.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (4.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (5.) | Others(Specify) | SPM | Microgram per Meter Cube | 254 | 0.25 | 14.25 | 269 | 300 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | NOx | | 0 | (2.) | NA | NA | 0 | 0 | SO2 | | 0 | (3.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1368 | (b)Source | MP State Electricity Board | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 400.029 | (b)Private Land (ha.) | 69.265 | (c)Government Land (ha.) | 54.456 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 523.75 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 69.265 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 400.029 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Government land | 54.456 | Total (ha.) | 523.75 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 0 | | (2.) | Ash Pond | | 0 | | (3.) | Green belt | | 0 | | (4.) | Built Up Area | | 5.2 | | (5.) | Main Plant | | 5.908 | road & infra | (6.) | Quarry Area | | 508.892 | mining area of 520 ha | (7.) | OB Dump Area | | 0 | not applicable | (8.) | Safety Zone | | 0 | Not applicable | (9.) | Tailing Pond | | 0 | Not applicable | (10.) | LandFill | | 0 | Not applicable | (11.) | Water Reservoir | | 0 | Not applicable | (12.) | Desalination Plant | | 0 | Not applicable | (13.) | Area for Solid Waste Management | | 0 | Not applicable | (14.) | Others | 33kv Powerline diversion | 3.75 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | Not applicable | 0 | Not applicable | (2.) | ESZs | not applicable | 0 | not applicable | (3.) | Critically Polluted Area | Not applicable | 0 | Not applicable | (4.) | NPA | Not applicable | 0 | Not applicable | (5.) | Corridors | Not applicable | 0 | Not applicable | (6.) | Wildlife Corridors | Tiger corridor | 7 | Tiger corridor and pachmadi bio-reserve is 7km from the mine | (7.) | WLS | Not applicable | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserved Forests | 2 | Reserved forest & asir reserved forests are nearby with an average distance of 2 km | (2.) | Defence Installations | | not applicable | 0 | not applicable | (3.) | Archaeological Sites | | not applicable | 0 | not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 523.75 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tawa Reservoir near by the mine boundary | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 0.1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 61 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 61 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 498 | 0 | 498 | (2.) | Percentage of Total Project Area | 95 | 0 | 95 | (3.) | No. of Plants | 0 | 0 | 0 | (4.) | Funds Allocated | 0 | 0 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will lead to development of roads, ancillary industries, Improvement in social
& living standards by providing opportunities of direct & indirect employment to local
community | (2.) | Financial | A substantial percentage of population is dependent on mining industry directly or
indirectly. Because of this mining project some of the local population may take direct
employment but a substantial impact will be on creation of indirect job opportunities and
employment. | (3.) | Environmental | Conservation of coal. Also it will lead to positive environmental impacts like green cover,
mine water utilization , etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 0.95 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | WCL/BD/SECTT/BM-282/2016/738 | (b)Date of Approval | 05 Nov 2016 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | WCL Board | (e)Approved Mining Lease Area | 523.75 | (f)Approved Capacity | 1.075 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 26.507 | (b)Mineable Reserves (Million Ton) | 19.727 | (c)Extractable Reserves(Million Ton) | 7.504 | (d)Percent(%) of Extraction | 56 | (e)Grade of Coal /Ore /Mineral | G-8 | (f)Stripping Ratio | 00 : 00 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Degree-II | (h)Average Gradient(Degree) | 14 | (i)Mining Method | Underground | (j)Life of Mine (Years) | 11 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 2 | (c)Thickness of seams to be worked on | 1.50 | (d)Maximum Thickness of Seams (metres) | 3.34 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 523.75 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Not Applicable as it is under CBA Act | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Not Applicable as it is under CBA Act | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Not Applicable as it is under CBA Act | |
|
9. | OB (Over Burden) Management: | Details Not Applicable | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 325 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 520 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | conveyor belt | (b)Surface to Siding/Loading | by road through coal transportation trucks | (c)Transportation / Conveyor Details | by road through coal transportation trucks | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | AGRICULTURE LAND | | 69.265 | 0 | 69.265 | (3.) | WASTE LAND | | 54.456 | 0 | 54.456 | (4.) | FOREST LAND | | 400.029 | 0 | 400.029 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 523.75 | 0 | 523.75 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | GREEN BELT | | 498 | 0 | 0 | | 498 | (5.) | Other | Powerline diversion | 0 | 0 | 3.75 | | 3.75 | (6.) | VIRGIN AREA | | 0 | 0 | 7.05 | | 7.05 | (7.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (8.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 5.2 | | 5.2 | (9.) | ROADS | | 0 | 0 | 6 | | 6 | |
TOTAL | 498 | 0 | 22 | 0 | 520 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | | (b)Internal Dump(in hectare) | | (c)Quarry(in hectare) | | (d)Safety Zone(in hectare) | | (e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | | (h)Total afforestation plant (in hectare) | | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2008 | 0.6 | 0.6 | 0.6 | 0.188 | 0 | (2.) | 2012 | 0.6 | 0.6 | 0.6 | 0.412 | 0 | (3.) | 2010 | 0.6 | 0.6 | 0.6 | 0.330 | 0 | (4.) | 2015 | 0.6 | 0.6 | 0.6 | 0.522 | 0 | (5.) | 2016 | 0.6 | 0.6 | 0.6 | 0.50 | 0 | (6.) | 2017 | 0.6 | 0.6 | 0.6 | 0.480 | 0 | (7.) | 2018 | 0.60 | 0.60 | 0.60 | 0.401 | 0 | (8.) | 2019 | 0.60 | 0.60 | 0.60 | 0.374 | 0 | (9.) | 2007 | 0.6 | 0.6 | 0.6 | 0.103 | 0 | (10.) | 2009 | 0.6 | 0.6 | 0.6 | 0.234 | 0 | (11.) | 2011 | 0.6 | 0.6 | 0.6 | 0.361 | 0 | (12.) | 2014 | 0.6 | 0.6 | 0.6 | 0.532 | 0 | (13.) | 2013 | 0.6 | 0.6 | 0.6 | 0.435 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0092 valid till 01.10.2020 | (ii)Name of the EIA Consultant | CMPDIL, RI-IV | (iii)Address | Jaripatka, Nagpur | (iv)Mobile No. | 8275970074 | (v)Landline No. | 0712264213 | (vi)Email Id | rdriv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Forest clearance for diversion of an area of 396.279 ha (195.200 + 201.079) has been obtained against total forest land of 400.029 ha.
- Compliance of all observations of the EAC in its meeting held on 27/9/2018 for re-validation of the EC dated 2/8/2006.
- Relevant project details to be mentioned in column 6 of Form-2. | 11 May 2019 | 2. | NA | The correction have been made as per the instruction received | 15 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Our above submission pertaining to Expansion of Tawa II UG may kindly be considered for grant of EC for expansion in production in capacity & re-validation of Existing EC. | 06 Nov 2020 | 2. | NA | The proposal was deferred on above lines.
| 10 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kaushik Chakraborty | Designation | G.M (MINING)/ ENVIRONMENT. | Name of Company (Applicant Name should not be given here) | Western Coalfields Limited | Address | Coal Estate Civil lines, Nagpur-440001 |
|