Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Synthetic Organic Chemical Plant at Khata No. 45, Mouza-Khapri, PO-Kalambi, Tehsil- Kalmeshwar, District Nagpur, MH by M/s. Ran Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation RAN CHEMICALS PVT LTD
(c)Registered Address Ranka Bhavan, 110, Dhantoli, Nagpur,,Nagpur,Maharashtra-440012
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rohit Sushilchandra Khanduri
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Kh No 45, Mouza-Khapri, PO- Kalambi, Tah- Kalmeshwar,,Kalameshwar,Nagpur,Maharashtra-441501
(d)Pin code 441501
(e)E-mail r.khanduri@ranchemicals.in
(f)STD Code. 7104(f)Telephone No. 237663
(g)Fax No. 236417
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/103229/1984
(d)Master Proposal Number(Single Window) SW/103225/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No. 45, Mouza-Khapri, PO-Kalambi, Tehsil- Ka
(b)Pincode 441501
(c)Bounded Latitudes (North)
From
Degree 21.16507
Minutes
Second
From
Degree 21.16661
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.88921
Minutes
Second
From
Degree 78.89091
Minutes
Second
(e)Survey of India Topo Sheet No. 55K/15, 55K/16 of SOI
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 347
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKendujharBarbilNuagaon, Guali, Topadihi, Barpada & Katasahi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 1
(b)Date of Apply of TOR 01 Jan 1984
(c)Date of Issue of TOR / Standard ToR 02 Feb 1981
(d)Date of Apply of EC 03 Dec 1984
(e)Date of Issue of EC 04 Jun 1985
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Apr 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :16 May 2018
Distance of Public Hearing Venue from the Proposed Project :0
Khata No. 45 Mouza-Khapri, PO-Kalambi, Tehsil- Kalmeshwar, District Nagpur Maharashtra
State :Maharashtra
District :Nagpur
Tehsil :Kalameshwar
Village :Kalambi
150Issue raise for local employment and pollution controlOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 1
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 14 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Spent Menthol and Glycol1.20.82OthersMT/dayRoad
(2.)Polyester based Resin & Others Polyesters283664OthersMT/dayRoad
(3.)Finishing agents & preparations used in textile1.414.616OthersMT/dayRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANAProposed expansion will be done within the existing unit area.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Dec 2016
(iv)Valid Upto 21 Mar 2021
(v)File No. UAN No. MPCB-CONSENT-0000001141
(vi)Application No. UAN No. MPCB-CONSENT-0000001141
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.24
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.40
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.20
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Detailed Raw Material is attached0OthersMT/monthLocal marketRoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2017 To 31 Mar 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube65.335.464.70100
(2.)PM2.5Micro Gram per Meter Cube31.415.131.060
(3.)NOxMicro Gram per Meter Cube29.38.328.8880
(4.)SO2Micro Gram per Meter Cube26.21.225.7080
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l6614415002000
(2.)TSSmg/l3200
(3.)pHNA7.87.26.58.5
(4.)Total Hardnessmg/l576268200600
(5.)Chloridesmg/l164682501000
(6.)Fluoridemg/l0.20.11.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.15.8A
(2.)BODmg/l32A
(3.)CODmg/l84A
(4.)pHNA8.68.4A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))51.840.875
(2.)Leq(Night)A-weighted decibels(dB(A))45.837.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare101.774.9
(2.)K(Potassium)Kilogram per hectare478.785.4
(3.)pH7.97.2
(4.)N(Nitrogen)Kilogram per hectare356.9119
(5.)Electric ConductivityOthersmmhos/cm0.40.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.08 To 15.59
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.60 To 10.60
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC NAgpur276.508Copy of Permission LetterPipelineOthersPumpEE (E&M)/D76599/of 201727 Oct 20172.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Plant processes and domestic waste10.535.0Aerobic treatment followed by Solar evaporation to ensure ZLDOthersZLD10.50
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded Containers/Barrels/bagsIndustrial Waste37Tons28RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Spent SolventOthersProcess waste500Tons28RoadAuthorized Recyclers
(3.)Carboy/Drums/bagsIndustrial Waste960Tons28RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)AshFly Ash1800Tons10RoadOthersBrick Manufacture
(5.)ETP SludgeOthersETP Sludge12.8Tons28.0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube260.51.52880
(2.)PM10Microgram per Meter Cube65.30.50.1065.4100
(3.)PM2.5Microgram per Meter Cube31.30.50.33260
(4.)NOxMicrogram per Meter Cube29.30.5104080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal30.500.6SO20.0033
(2.)BoilerCoal30.500.6NOx0.0026
(3.)TFHCoal30.500.6PM100.058
(4.)THFCoal30.500.6NOx0.007
(5.)DG SetHSD3.50.5SO20.09
(6.)DG SetHSD3.50.5NOx0.65
(7.)BoilerCoal30.500.6PM100.068
(8.)THFCoal30.500.6SO20.224
(9.)DG SetHSD3.50.5PM100.011
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 No. of DG set of capacities of 500 KVA & 320 KVA
(e)Stack Height (in m) 3.50
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.76
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.76
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 434
(b)Waste/Barren Land (ha.) 148
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 500
(e)Settlements (ha.) 582
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land, Mining area, Open hill area, Open lan 19400
    Total (ha.) 21064
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.76Total Plot area
(2.)Built Up Area0.72Net Plot area
(3.)Green belt0.24Area for green Belt Development
Total (ha.) 3.72
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)NPANA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vena River and Vena Talab
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 172
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 172
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt238602386
(2.)Percentage of Total Project Area33033
(3.)No. of Plants300300600
(4.)Funds Allocated51015
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProject fulfill the demand supply gap
(2.)SocialThe project will bring water to 21 villages, which are presently water scarce and cannot irrigate their land efficiently due to shortage of water. The project will bring direct environment and social benefits, which in turn will bring prosperity to the area and increase spending power of farmers, bringing economic benefits to the region. Direct benefits include public health infrastructure, awareness and training programs for farmers, etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 143
(ii)Name of the EIA Consultant SMS ENVOCARE LTD
(iii)Address 301 Pentagon P3 Magarpatta City Hadapsar Pune MH
(iv)Mobile No. 9011033523
(v)Landline No. 0206680111
(vi)Email Id nilesh.deshmukh@smsl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Present status of validity of NABET accreditation of the EIA Consultant. - EC status for the existing industrial operations (@30.6 TPD) and the compliance status thereof. - Products details mentioned in column 9(b) are not consistent with those in presently valid CTO dated 20/12/2016. - Present status of the permission/clearance for water supply of 276.5 cum/day. 02 May 2019
2.NAThe correction have been made as per the instruction received 01 Nov 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRohit Sushilchandra Khanduri
DesignationDirector
Name of Company (Applicant Name should not be given here)RAN CHEMICALS PVT LTD
AddressRanka Bhavan, 110, Dhantoli, Nagpur
Print