Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Manufacturing of Manganese Oxide & Manganese Dioxide, Manganese Sulphate, Zinc Sulphate and Ferro Alloys (By Thermite Process) by Raghav Minerals
(b)Name of the Company / Organisation RAGHAV MINERALS
(c)Registered Address B-16/9, B-16/10, , Nagpur,B-16/9, B-16/10, MIDC Butibori, Nagpur,Nagpur,Maharashtra-441122
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shyamsunder Ratan
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 115, Shreedevi Ratan Complex, Agyaramdevi Square, Nagpur,115, Shreedevi Ratan Complex, Agyaramdevi Square, Nagpur,Nagpur (Urban),Nagpur,Maharashtra-440018
(d)Pin code 440018
(e)E-mail raghavminerals007@gmail.com
(f)STD Code. 712(f)Telephone No. 2728927
(g)Fax No. 2728146
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND/29993/2015
(d)Master Proposal Number(Single Window) SW/103201/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. B – 16/9, B - 16/10
(b)Pincode 441122
(c)Bounded Latitudes (North)
From
Degree 20.924791
Minutes
Second
From
Degree 20.925332
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.959496
Minutes
Second
From
Degree 78.959820
Minutes
Second
(e)Survey of India Topo Sheet No. 55L/13, 55K/16, 55P/1 & 55 O/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 276
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNagpurNagpur (Rural)
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/211/2015-IA-II(I)
(b)Date of Apply of TOR 10 Aug 2015
(c)Date of Issue of TOR / Standard ToR 24 May 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Feb 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Mar 2018
Distance of Public Hearing Venue from the Proposed Project :2
Manufacturing Association Hall, MIDC, Butibori
State :Maharashtra
District :Nagpur
Tehsil :Hingna
Village :Butibori
33Most of the issues raised on Employment must be given to local people. Pollution control measures must be adopted.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactors for MnSO4 / ZnSO4----
(2.)Furnace for MnO----
(3.)Reaction vessels for Ferro Alloys----
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manganese oxide7200Tons per AnnumRoad
(2.)MnSO42400Tons per AnnumRoad
(3.)ZnSO42400Tons per AnnumRoad
(4.)Ferro Alloys Medium Carbon2400Tons per AnnumRoad
(5.)Manganese dioxide4800Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 22 Oct 2018
(iv)Valid Upto 31 May 2020
(v)File No. MPCB/UAN NO.53361/1810001115
(vi)Application No. MPCB-CONSENT-0000053361
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.57
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.53
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.091
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 24689
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 24689
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Zinc Oxide1335Tons per AnnumBhandraRoadPipeline90 Open MarketCopy of Linkage
(2.)Aluminium Scrap410Tons per AnnumLocal MarketRoad60 Open MarketCopy of Linkage
(3.)Lime Powder/Flourspar548Tons per AnnumWani / Local MarketRoad110 Open MarketCopy of Linkage
(4.)Silico Manganese1416Tons per AnnumHyderabad, Raipur, DurgapurRoad320 Open MarketCopy of Linkage
(5.)Manganese Ore11280Tons per AnnumManganese Mines of MOILRoad80 OthersContractCopy of Linkage
(6.)Sulphuric Acid900Tons per AnnumLocal MarketRoad60 Open MarketCopy of Linkage
(7.)Manganese Oxide1600Tons per AnnumCaptive / LocalRoad3 Otherscaptive/open marketCopy of Linkage
(8.)Coal/ Charcoal3600Tons per AnnumLocal MarketRoad60 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2016 To 30 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube25.07.619.580
(2.)NOxMicro Gram per Meter Cube28.29.923.680
(3.)PM10Micro Gram per Meter Cube58.531.553.7100
(4.)PM2.5Micro Gram per Meter Cube32.115.431.160
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l55100100
(2.)TDSmg/l9983125002000
(3.)Chloridesmg/l16737.52501000
(4.)Fluoridemg/l0.60.311.5
(5.)pHmg/l7.97.18.58.5
(6.)Total Hardnessmg/l518500200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.11.2B
(2.)CODmg/l10.65.2A
(3.)pHNA8.07.3A
(4.)DOmg/l6.35.3A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))45.036.855
(2.)Leq(Day)A-weighted decibels(dB(A))53.839.365
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare878.298
(2.)P(Phosphorus)Kilogram per hectare45.13.6
(3.)K(Potassium)Kilogram per hectare1482.4137
(4.)pH8.57.83
(5.)Electric ConductivityOthersmmhos/cm0.2920.125
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.8 To 15.59
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.60 To 10.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC water supply112.5 Not Appliacble PipelineOthersPipeline00101 Jan 190011
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.52Packaged Type STPReuse within the Plant & Recycling,Green Belt Renewal Plant1.5
(2.)Industrial1.51.5Settling TankGreen Belt Renewal Plant1.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discrded cakes from filter pressIndustrial Waste1050Tons0.05RoadOthersUsed for brick manufacturing
(2.)AshIndustrial Waste720Tons00RoadOthersUsed for brick manufacturing
(3.)SlagIndustrial Waste1926Tons0.05RoadOthersWill be sold to manufacturer of Silico-manganese
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube28.20.201.7629.96180
(2.)PM2.5Microgram per Meter Cube32.10.200.4032.5160
(3.)PM10Microgram per Meter Cube58.50.200.4058.91100
(4.)SO2Microgram per Meter Cube25.00.201.7526.75180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Furnace & Vesselcoal300.5PM101.08
(2.)Furnace & VesselCoal300.5SO23.18
(3.)Furnace and VesselCoal300.5NOx4.89
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 75
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 0.2
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 0.20
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : 00 00
    Total (ha.) 0.2
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.1Industry Shed
(2.)Green belt0.066Plantation
(3.)OthersOpen Area0.034
Total (ha.) 0.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone00Na
(2.)NPANone00NA
(3.)ESAsNone00NA
(4.)CorridorsNone00NA
(5.)WLSNone00NA
(6.)Wildlife CorridorsNone00NA
(7.)ESZsNone00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone00NA
(2.)Defence InstallationsNone00NA
(3.)ForestBid Sukli RF1.5NW
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.20
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vena River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 15
(e)No. of working days 330
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.066
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 50000.00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt Development
(2.)SocialEmployment generation and infrastructure development under CER fund.
(3.)FinancialRevenue generation in form of GST, IT and Other Taxes for State and Central Government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1720/RA0101
(ii)Name of the EIA Consultant Pollution and Ecology Control Services (PECS)
(iii)Address Near Dhantoli Police Station Dhantoli, Nagpur (MS)
(iv)Mobile No. 9373128182
(v)Landline No. 0712229399
(vi)Email Id pecs_nagpur@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.