1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility by Aarav Fragrances & Flavors Pvt. Ltd. at Gut No./ Survey No.: 150, 151, 166 to 172 of village Lakhmapur and Gut No./ Surv | (b)Name of the Company / Organisation | AARAV FRAGRANCES & FLAVOURS PVT. LTD. | (c)Registered Address | Gut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur,
Tal. Wada, District: Thane- Maharashtra.,,Thane,Maharashtra-421303 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shailesh Arvind Deshmukh | (b)Designation (Owner/ Partner/ CEO) | Senior Manager Chemicals | (c)Address | AARAV House, Plot No. A-152/A-153,
Wagle Industrial Area,Road no.25, MIDC,
Thane (West), India,Pin- 400604,Thane,Thane,Maharashtra-400604 | (d)Pin code | 400604 | (e)E-mail | shailesh.deshmukh@aarav.co | (f)STD Code. | 22(f)Telephone No. | 41130206 | (g)Fax No. | 25827419 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/94966/2019 | (d)Master Proposal Number(Single Window) | SW/103191/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 150,151,166to172,239A,242,286(Part)287(Part)289(Pa | (b)Pincode | 421303 | (c)Bounded Latitudes (North) | | From | | Degree | 19.59 | Minutes | | Second | | From | | Degree | 19.59 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.10 | Minutes | | Second | | From | | Degree | 73.11 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43B2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 48 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Palghar | Vada | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/49/2019-IA-II(I) | (b)Date of Apply of TOR | 08 Feb 2019 | (c)Date of Issue of TOR / Standard ToR | 18 Mar 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 26 Jul 2017 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| site of Aarav fragrances & Flavors Pvt. Ltd | State : | Maharashtra | District : | Palghar | Tehsil : | Vada | Village : | Jamghar Lakhmapur |
| 55 | Refer EIA report | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Reactor Columns Storage Tanks Boilers | Will be installed | No | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | R & D for fragrances and Flavors | 0 | Others | No | Road | | (2.) | Perfumery & Flavor Esters Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (3.) | Macro cyclic and polycyclic musks derived from propylene/ butadiene and other propylene derivatives Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (4.) | Cyclo Alkylation/Acetylation, Diel Alders Reactions: Cyclization Reaction, Etherification of Alkyl Halide and Alcohol, Epoxidation of Alkenes /Friedel Craft Reactions Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (5.) | Hydrogenation Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (6.) | Perfumery & Flavor Alcohol Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (7.) | Perfumery & Flavor Aldehyde and Aldehyde derivatives Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (8.) | Aldehydes & Ketones by Aldol Condensation Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (9.) | Acetylene and other alkyne derivatives Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (10.) | Dimerization and Trimerization of simple olefins Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | (11.) | Ketals / Acetals / substituted 1,3-propanediols Products in various grades | 372 | Others | Ton per month (campaign basis) | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Apr 2016 | (iv)Valid Upto | 30 Sep 2020 | (v)File No. | Format 1.0/AST/RO-KN/EIC No KN-6887-16/R/CC-4912 | (vi)Application No. | Format 1.0/AST/RO-KN/EIC No KN-6887-16/R/CC-4912 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.985 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.20 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.30 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | refer attachment | 0 | Tons per Annum | | local | Road | | 0 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2015 To 25 Feb 2016 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 34.3 | 20.5 | 33.5 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 78.9 | 53.3 | 76 | 100 | (3.) | Others | CO | Mili Gram per Meter Cube | 1.38 | 0.93 | 1.36 | 4 | (4.) | SO2 | | Micro Gram per Meter Cube | 13.3 | 11.2 | 13.2 | 80 | (5.) | NOx | | Micro Gram per Meter Cube | 13.8 | 11.5 | 13.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 60 | 60 | 500 | 2000 | (3.) | Heavy Metals | | Cd | mg/l | | 0 | 0 | 0.003 | 0 | (4.) | Total Hardness | | | mg/l | | 60 | 60 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 16.4 | 16.4 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (7.) | pH | | | NA | | 6.6 | 6.6 | 8.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 0 | 0 | C | (2.) | COD | | mg/l | | 0 | 0 | C | (3.) | Others | Dissolved solids | mg/l | | 60 | 60 | C | (4.) | pH | | NA | | 7.06 | 7.06 | C | (5.) | DO | | mg/l | | 0 | 0 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 43.8 | 43.8 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.3 | 41.3 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 0 | 0 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.168 | 0.168 | (3.) | pH | | | 8.05 | 8.05 | (4.) | N(Nitrogen) | Kilogram per hectare | | 5.4 | 5.4 | (5.) | K(Potassium) | Kilogram per hectare | | 21 | 21 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 9 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4(211)/ CR/ CGWA/ 2015- 2297 | (f)Date of Issue | 11 Dec 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Ground water & tanker in case of emergency | 154.5 | 0 | Copy of Permission Letter | Pipeline | | Others | from Borewell | 21-4(211)/ CR/ CGWA/ 2015- 2297 | 11 Dec 2018 | 115.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic, Industrial, Utilities | 39 | 39 | ETP, Flash distillation | Reuse within the Plant & Recycling | | 39 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 39 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 39 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Canteen waste | Municipal Solid Waste | | 24 | Tons | 0 | Road | | Others | Composting along with garden waste, | (2.) | Scrap (Iron/plastic/ paper/glass etc) | Municipal Solid Waste | | 48 | Tons | 0 | Road | | Others | Disposal through recyclers/scrap dealers | (3.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 28.8 | Tons | 0 | Road | | Others | Disposal by sale to registered recyclers | (4.) | Discarded Containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Tons | 0 | Road | | Others | disposal by sale to MPCB authorized recycler | (5.) | FO / LDO & Oil Bottoms Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 54 | Tons | 0 | Road | | Others | Will be sold to MPCB Authorized parties | (6.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 0 | Road | | Others | Disposal to CHWTSDF | (7.) | Spent acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 0 | Road | | Others | Will be sold to MPCB Authorized parties | (8.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 120 | Tons | 0 | Road | | Others | Disposal to CHWTSDF | (9.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 72 | Tons | 0 | Road | | Others | Disposal by sale to registered recyclers | (10.) | ETP Biological sludge | Industrial Waste | | 24 | Tons | 0 | Road | | Others | Composting along with garden waste, | (11.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 0 | Road | | Others | Disposal to CHWTSDF | (12.) | Contaminated bags, cotton rags etc | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 72 | Tons | 0 | Road | | Others | Disposal to CHWTSDF | (13.) | Inorganic salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 600 | Tons | 0 | Road | | Others | Reuse or recycle or to Authorized party or TSDF | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.7 | 0.5 | 0.72 | 64 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 12.3 | 0.5 | 2.1 | 15 | 80 | (3.) | NOx | | Microgram per Meter Cube | 12.5 | 0.5 | 1.26 | 14 | 80 | (4.) | Others(Specify) | NA | NA | 0 | 0 | 0 | 1 | 0 | (5.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 3 lakh Kcal/ Hr Thermic fluid heater | Agricultural Waste OR Bio briquette OR Furnace oil | 27 | 0.4 | PM10 | | 0.72 | (2.) | 5 TPH Boiler | Agricultural Waste OR Bio briquette OR Furnace oil | 30 | 0.65 | PM10 | | 0.72 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 KVA & 160 KVA DG set | (e)Stack Height (in m) | 5 m above height of building | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.775 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.775 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 23 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 9876 | (d)Surface Water Bodies (ha.) | 411 | (e)Settlements (ha.) | 74 | (f)Industrial (ha.) | 149 | (g)Forest (ha.) | 5268 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 15801 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 9.775 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Tansa Wildlife sanctuary | 5.8 | Not applicable | (2.) | NPA | Not applicable | 0 | Not applicable | (3.) | Critically Polluted Area | Not applicable | 0 | Not applicable | (4.) | ESZs | Not applicable | 0 | Not applicable | (5.) | Corridors | Not applicable | 0 | Not applicable | (6.) | Wildlife Corridors | Not applicable | 0 | Not applicable | (7.) | ESAs | Not applicable | 0 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Tansa Wildlife sanctuary | 5.8 | Not applicable | (2.) | Defence Installations | | Not applicable | 0 | Not applicable | (3.) | Others | Not applicable | Not applicable | 0 | Not applicable | (4.) | Archaeological Sites | | Carved Stones, Wada | 7.2 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Vaitarna river | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 30 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 6 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 4.14 | (b)Percentage of Total Project Area | 42.35 | (c)No. of Plants to be Planted | 1000 | (d)Funds Allocated for Plantation | 10 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Local employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0117 | (ii)Name of the EIA Consultant | Aditya Environmental Services Pvt. Ltd | (iii)Address | 107, Hiren Light Industrial estate, Mogul Lane, Mahim- west, Mumbai | (iv)Mobile No. | 9821513367 | (v)Landline No. | 0224212750 | (vi)Email Id | rajiv@aespl.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 24 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Please inform about the EIA Consultant, and the relevant details to be mentioned in column 38 of Form-2.
- Proposal has been submitted after expiry of validity of the ToR dated 22/6/2015, which is not acceptable. That ought to have been extended rather than obtaining fresh ToR. | 30 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 02 May 2019 | 3. | NA | Please clarify/confirm the following along with the supporting documents:-
- Proposed products of total capacity 632 TPM (as per the ToR dated 18/3/2019) are synthetic organic chemicals, and thus requiring prior EC in terms of the EIA Notification, 2006. Please note that formulation products and inorganic salts are not covered under the ambit of the said Notification. The proposal needs to be restructured accordingly.
- Whether the project profile/details presented during public hearing conducted by SPCB on 26/7/2017, were as per the ToR dated 18/3/2019. | 11 May 2019 | 4. | NA | The correction have been made as per the instruction received | 13 May 2019 | 5. | NA | We reiterate our observations dated 30/4/2019 & 11/5/2019. There being no convincing reply, the matter may be discussed with us in the Ministry to resolve the required clarifications. | 18 May 2019 | 6. | NA | The correction have been made as per the instruction received | 21 May 2019 | 7. | NA | Please see our observations dated 18/5/2019 for the needful. | 26 May 2019 | 8. | NA | The correction have been made as per the instruction received | 13 Jun 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shailesh Arvind Deshmukh | Designation | Senior Manager Chemicals | Name of Company (Applicant Name should not be given here) | AARAV FRAGRANCES & FLAVOURS PVT. LTD. | Address | Gut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur,
Tal. Wada, District: Thane- Maharashtra. |
|