Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Establishment of Synthetic Organic Chemicals Manufacturing Facility by Aarav Fragrances & Flavors Pvt. Ltd. at Gut No./ Survey No.: 150, 151, 166 to 172 of village Lakhmapur and Gut No./ Surv
(b)Name of the Company / Organisation AARAV FRAGRANCES & FLAVOURS PVT. LTD.
(c)Registered Address Gut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur, Tal. Wada, District: Thane- Maharashtra.,,Thane,Maharashtra-421303
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shailesh Arvind Deshmukh
(b)Designation (Owner/ Partner/ CEO) Senior Manager Chemicals
(c)Address AARAV House, Plot No. A-152/A-153, Wagle Industrial Area,Road no.25, MIDC, Thane (West), India,Pin- 400604,Thane,Thane,Maharashtra-400604
(d)Pin code 400604
(e)E-mail shailesh.deshmukh@aarav.co
(f)STD Code. 22(f)Telephone No. 41130206
(g)Fax No. 25827419
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MH/IND2/94966/2019
(d)Master Proposal Number(Single Window) SW/103191/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 150,151,166to172,239A,242,286(Part)287(Part)289(Pa
(b)Pincode 421303
(c)Bounded Latitudes (North)
From
Degree 19.59
Minutes
Second
From
Degree 19.59
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.10
Minutes
Second
From
Degree 73.11
Minutes
Second
(e)Survey of India Topo Sheet No. E43B2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 48
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraPalgharVada
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/49/2019-IA-II(I)
(b)Date of Apply of TOR 08 Feb 2019
(c)Date of Issue of TOR / Standard ToR 18 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Jun 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Jul 2017
Distance of Public Hearing Venue from the Proposed Project :0
site of Aarav fragrances & Flavors Pvt. Ltd
State :Maharashtra
District :Palghar
Tehsil :Vada
Village :Jamghar Lakhmapur
55Refer EIA reportDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Reactor Columns Storage Tanks BoilersWill be installedNo
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)R & D for fragrances and Flavors0OthersNoRoad
(2.)Perfumery & Flavor Esters Products in various grades372OthersTon per month (campaign basis)Road
(3.)Macro cyclic and polycyclic musks derived from propylene/ butadiene and other propylene derivatives Products in various grades372OthersTon per month (campaign basis)Road
(4.)Cyclo Alkylation/Acetylation, Diel Alders Reactions: Cyclization Reaction, Etherification of Alkyl Halide and Alcohol, Epoxidation of Alkenes /Friedel Craft Reactions Products in various grades372OthersTon per month (campaign basis)Road
(5.)Hydrogenation Products in various grades372OthersTon per month (campaign basis)Road
(6.)Perfumery & Flavor Alcohol Products in various grades372OthersTon per month (campaign basis)Road
(7.)Perfumery & Flavor Aldehyde and Aldehyde derivatives Products in various grades372OthersTon per month (campaign basis)Road
(8.)Aldehydes & Ketones by Aldol Condensation Products in various grades372OthersTon per month (campaign basis)Road
(9.)Acetylene and other alkyne derivatives Products in various grades372OthersTon per month (campaign basis)Road
(10.)Dimerization and Trimerization of simple olefins Products in various grades372OthersTon per month (campaign basis)Road
(11.)Ketals / Acetals / substituted 1,3-propanediols Products in various grades372OthersTon per month (campaign basis)Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Apr 2016
(iv)Valid Upto 30 Sep 2020
(v)File No. Format 1.0/AST/RO-KN/EIC No KN-6887-16/R/CC-4912
(vi)Application No. Format 1.0/AST/RO-KN/EIC No KN-6887-16/R/CC-4912
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.985
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.30
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)refer attachment0Tons per AnnumlocalRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2015 To 25 Feb 2016
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube34.320.533.560
(2.)PM10Micro Gram per Meter Cube78.953.376100
(3.)OthersCOMili Gram per Meter Cube1.380.931.364
(4.)SO2Micro Gram per Meter Cube13.311.213.280
(5.)NOxMicro Gram per Meter Cube13.811.513.880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l60605002000
(3.)Heavy MetalsCdmg/l000.0030
(4.)Total Hardnessmg/l6060200600
(5.)Chloridesmg/l16.416.42501000
(6.)Fluoridemg/l0011.5
(7.)pHNA6.66.68.58.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00C
(2.)CODmg/l00C
(3.)OthersDissolved solidsmg/l6060C
(4.)pHNA7.067.06C
(5.)DOmg/l00C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))43.843.875
(2.)Leq(Night)A-weighted decibels(dB(A))41.341.370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare00
(2.)Electric ConductivityMillisiemens per Centimetre0.1680.168
(3.)pH8.058.05
(4.)N(Nitrogen)Kilogram per hectare5.45.4
(5.)K(Potassium)Kilogram per hectare2121
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 9
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4(211)/ CR/ CGWA/ 2015- 2297
(f)Date of Issue 11 Dec 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGround water & tanker in case of emergency154.50Copy of Permission LetterPipelineOthersfrom Borewell21-4(211)/ CR/ CGWA/ 2015- 229711 Dec 2018115.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Industrial, Utilities3939ETP, Flash distillationReuse within the Plant & Recycling39
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 39
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 39
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Canteen wasteMunicipal Solid Waste24Tons0RoadOthersComposting along with garden waste,
(2.)Scrap (Iron/plastic/ paper/glass etc)Municipal Solid Waste48Tons0RoadOthersDisposal through recyclers/scrap dealers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)28.8Tons0RoadOthersDisposal by sale to registered recyclers
(4.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons0RoadOthersdisposal by sale to MPCB authorized recycler
(5.)FO / LDO & Oil Bottoms SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)54Tons0RoadOthersWill be sold to MPCB Authorized parties
(6.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons0RoadOthersDisposal to CHWTSDF
(7.)Spent acidHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons0RoadOthersWill be sold to MPCB Authorized parties
(8.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)120Tons0RoadOthersDisposal to CHWTSDF
(9.)Spent CatalystHazardous Waste (as per Hazardous and Other Waste Management rules 2016)72Tons0RoadOthersDisposal by sale to registered recyclers
(10.)ETP Biological sludgeIndustrial Waste24Tons0RoadOthersComposting along with garden waste,
(11.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons0RoadOthersDisposal to CHWTSDF
(12.)Contaminated bags, cotton rags etcHazardous Waste (as per Hazardous and Other Waste Management rules 2016)72Tons0RoadOthersDisposal to CHWTSDF
(13.)Inorganic saltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons0RoadOthersReuse or recycle or to Authorized party or TSDF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.70.50.7264100
(2.)SO2Microgram per Meter Cube12.30.52.11580
(3.)NOxMicrogram per Meter Cube12.50.51.261480
(4.)Others(Specify)NANA00010
(5.)PM2.5Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3 lakh Kcal/ Hr Thermic fluid heaterAgricultural Waste OR Bio briquette OR Furnace oil270.4PM100.72
(2.)5 TPH BoilerAgricultural Waste OR Bio briquette OR Furnace oil300.65PM100.72
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA & 160 KVA DG set
(e)Stack Height (in m) 5 m above height of building
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9.775
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.775
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 9876
(d)Surface Water Bodies (ha.) 411
(e)Settlements (ha.) 74
(f)Industrial (ha.) 149
(g)Forest (ha.) 5268
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 15801
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant9.775
Total (ha.) 9.775
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSTansa Wildlife sanctuary5.8Not applicable
(2.)NPANot applicable0Not applicable
(3.)Critically Polluted AreaNot applicable0Not applicable
(4.)ESZsNot applicable0Not applicable
(5.)CorridorsNot applicable0Not applicable
(6.)Wildlife CorridorsNot applicable0Not applicable
(7.)ESAsNot applicable0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestTansa Wildlife sanctuary5.8Not applicable
(2.)Defence InstallationsNot applicable0Not applicable
(3.)OthersNot applicableNot applicable0Not applicable
(4.)Archaeological SitesCarved Stones, Wada7.2Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vaitarna river
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 10
(e)No. of working days 6
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Total Area of Green Belt 4.14
(b)Percentage of Total Project Area 42.35
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 10
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0117
(ii)Name of the EIA Consultant Aditya Environmental Services Pvt. Ltd
(iii)Address 107, Hiren Light Industrial estate, Mogul Lane, Mahim- west, Mumbai
(iv)Mobile No. 9821513367
(v)Landline No. 0224212750
(vi)Email Id rajiv@aespl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 24 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about the EIA Consultant, and the relevant details to be mentioned in column 38 of Form-2. - Proposal has been submitted after expiry of validity of the ToR dated 22/6/2015, which is not acceptable. That ought to have been extended rather than obtaining fresh ToR. 30 Apr 2019
2.NAThe correction have been made as per the instruction received 02 May 2019
3.NAPlease clarify/confirm the following along with the supporting documents:- - Proposed products of total capacity 632 TPM (as per the ToR dated 18/3/2019) are synthetic organic chemicals, and thus requiring prior EC in terms of the EIA Notification, 2006. Please note that formulation products and inorganic salts are not covered under the ambit of the said Notification. The proposal needs to be restructured accordingly. - Whether the project profile/details presented during public hearing conducted by SPCB on 26/7/2017, were as per the ToR dated 18/3/2019. 11 May 2019
4.NAThe correction have been made as per the instruction received 13 May 2019
5.NAWe reiterate our observations dated 30/4/2019 & 11/5/2019. There being no convincing reply, the matter may be discussed with us in the Ministry to resolve the required clarifications. 18 May 2019
6.NAThe correction have been made as per the instruction received 21 May 2019
7.NAPlease see our observations dated 18/5/2019 for the needful. 26 May 2019
8.NAThe correction have been made as per the instruction received 13 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShailesh Arvind Deshmukh
DesignationSenior Manager Chemicals
Name of Company (Applicant Name should not be given here)AARAV FRAGRANCES & FLAVOURS PVT. LTD.
AddressGut No. 167, 169, 170, 171, 296, Village Jamghar -Lakhamapur, Tal. Wada, District: Thane- Maharashtra.