Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Grain based Distillery (60 KLPD to 105 KLPD) & Cogeneration Power Plant (2.5 MW to 4.5 MW) along with installation of 10 KLPD Malt Spirit Plant at Village Bhutiyan, Tehsil Beri, District
(b)Name of the Company / Organisation ADS SPIRITS PVT. LTD.
(c)Registered Address ADS Tower, Main Delhi Rohtak Road, Dharampura,MLA Wali Gali, Bahadurgarh,Jhajjar,Haryana-124507
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manish Singh
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address ADS Spirits Pvt. Ltd., Beri Kalanour Road, Village Bhutiyan, Tehsil Beri, District Jhajjar, Haryana,,Beri,Jhajjar,Haryana-124201
(d)Pin code 124201
(e)E-mail manish.singh@adsspirits.com
(f)STD Code. 0(f)Telephone No. 2777741
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/103180/2010
(d)Master Proposal Number(Single Window) SW/103171/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 16,7,8,9,10,14/1,14/2,17,24/1,24/2,4,7
(b)Pincode 124201
(c)Bounded Latitudes (North)
From
Degree 28.72944444
Minutes
Second
From
Degree 28.73250000
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.5355555
Minutes
Second
From
Degree 76.5388888
Minutes
Second
(e)Survey of India Topo Sheet No. 53D6, 53D5, 53D9, 53D10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 65
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/52/2018-IA-II (I)
(c)Date of Issue of TOR 14 Dec 2010
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 17 May 2019
(c)Date of Issue of EC 07 Oct 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Haryana
District :Jhajjar
Tehsil :Beri
Village :Bhutiyan
90Employment, CSR activities in nearby areas, Training centers, Environment pollutionOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chandigarh
(iii)Letter No. 4-994/2011-RO(NZ)/110-111
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jul 24 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Malt Spirits01010Kilo Litre per Day(KLD)Road
(2.)Power2.524.5Mega Watt(MW)OthersCables
(3.)ENA/RS/Ethanol/AA6045105Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Co-generation Power Plant2.524.5MW
(2.)Grain Based Distillery6045105KLPD
(3.)Malt Spirits Plant01010KLPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Dec 2015
(iv)Valid Upto 30 Sep 2020
(v)File No. 53D/6, 53D/5,53D/9, 53D/10
(vi)Application No. HSPCB/Consent/:2777415JHACTO2373079
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 41300
(b)Existing quantity of raw material/fuel 56000
(c)Total quantity of raw material/fuel 97300
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains – Maize, jowar, broken rice89600Tons per AnnumThrough SuppliersRoad1000 MoUCopy of Linkage
(2.)Barley for malting7700Tons per AnnumThrough SuppliersRoad200 Open MarketCopy of Linkage
(3.)Coal as a Fuel for Boiler56000Tons per AnnumThrough SuppliersRoad2000 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube86.458.285.74100
(2.)PM2.5Micro Gram per Meter Cube42.523.642.1160
(3.)SO2Micro Gram per Meter Cube15.67.015.3680
(4.)NOxMicro Gram per Meter Cube24.211.123.8780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l13684125002000
(3.)Total Hardnessmg/l579165200600
(4.)Chloridesmg/l587.117.372501000
(5.)Fluoridemg/l2.461.111.01.5
(6.)pHNA8.157.436.58.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.267.26E
(2.)CODmg/l24.3024.30E
(3.)DOmg/l4.904.90E
(4.)BODmg/l6.206.20E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.453.2Industrial-75, commercial-65, residential-55
(2.)Leq(Night)A-weighted decibels(dB(A))54.343Industrial-70, Commercial-55, Residential-45
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare274.86137.23
(2.)Electric ConductivityMillisiemens per Centimetre0.440.13
(3.)K(Potassium)Kilogram per hectare208.3989.48
(4.)pH8.147.28
(5.)P(Phosphorus)Kilogram per hectare67.7815.93
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.53 To 19.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.43 To 18.3
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9000Copy of Permission LetterPipelineTube Well21-4(418)/NWR/CGWA/2011-140409 Jul 2018900
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial312500Anaerobic, aerobic, filters and RO PlantReuse within the Plant & Recycling312
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 312
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 312
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DDGSOthersBy-product as cattle feed17850Tons200RoadOthersUse as Cattle feed
(2.)AshFly Ash19600Tons100RoadOthersGiven to nearby Cement or Brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube84.21084.35100
(2.)SO2Microgram per Meter Cube15.61016.4680
(3.)NOxMicrogram per Meter Cube23.11025.680
(4.)PM2.5Microgram per Meter Cube42.51042.50160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerCoal or rice husk502.5PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4375
(b)Source 4.5 MW Co-generation Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 750 and 1000 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 10.11
    Total Land (ha.) 10.11
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 30057.26
(b)Waste/Barren Land (ha.) 189.88
(c)Grazing/ Community Land (ha.) 455.19
(d)Surface Water Bodies (ha.) 717.36
(e)Settlements (ha.) 1107.63
(f)Industrial (ha.) 12.08
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Electrical Substation 18.84
    Total (ha.) 32558.24
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.32
(2.)Green belt3.3
(3.)OthersStorage yard, Road, Parking, Office & others3.49
Total (ha.) 10.11
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(2.)NPANot Applicable0No NPA within 10 km radius
(3.)ESAsNot Applicable0No ESA within 10 km radius
(4.)WLSNot Applicable0No WLS within 10 km radius
(5.)ESZsNot Applicable0No ESZ within 10 km radius
(6.)CorridorsNot Applicable0No Corridors within 10 km radius
(7.)Wildlife CorridorsNot Applicable0No wildlife corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0No forest within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)Defence InstallationsNot Applicable0No defence installations within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.11
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Canal
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 170
(e)No. of working days 350
(f)Total Manpower 440
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.11.23.3
(2.)Percentage of Total Project Area211233
(3.)No. of Plants150020003500
(4.)Funds Allocated150000050000006500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalZero Liquid Discharge Project and Greenbelt development
(2.)FinancialRevenue generation
(3.)SocialEmployment generation and CSR Activities
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NARegional Office of the Ministry in their letter dated 11/3/2019 along with the CCR for the EC dated 12/10/2011, has made certain observations with the request to submit time bound action taken report on non-complied conditions. Present status in this regard may be informed. 02 May 2019
2.NAThe correction have been made as per the instruction received 17 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManish Singh
DesignationGM
Name of Company (Applicant Name should not be given here)ADS SPIRITS PVT. LTD.
AddressADS Tower, Main Delhi Rohtak Road, Dharampura
Print