|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Grain based Distillery (60 KLPD to 105 KLPD) & Cogeneration Power Plant (2.5 MW to 4.5 MW) along with installation of 10 KLPD Malt Spirit Plant at Village Bhutiyan, Tehsil Beri, District | (b)Name of the Company / Organisation | ADS SPIRITS PVT. LTD. | (c)Registered Address | ADS Tower, Main Delhi Rohtak Road, Dharampura,MLA Wali Gali, Bahadurgarh,Jhajjar,Haryana-124507 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manish Singh | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | ADS Spirits Pvt. Ltd., Beri Kalanour Road, Village Bhutiyan, Tehsil Beri, District Jhajjar, Haryana,,Beri,Jhajjar,Haryana-124201 | (d)Pin code | 124201 | (e)E-mail | manish.singh@adsspirits.com | (f)STD Code. | 0(f)Telephone No. | 2777741 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HR/IND2/103180/2010 | (d)Master Proposal Number(Single Window) | SW/103171/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 16,7,8,9,10,14/1,14/2,17,24/1,24/2,4,7 | (b)Pincode | 124201 | (c)Bounded Latitudes (North) | | From | | Degree | 28.72944444 | Minutes | | Second | | From | | Degree | 28.73250000 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.5355555 | Minutes | | Second | | From | | Degree | 76.5388888 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53D6, 53D5, 53D9, 53D10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 232 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 65 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/52/2018-IA-II (I) | (c)Date of Issue of TOR | 14 Dec 2010 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 17 May 2019 | (c)Date of Issue of EC | 07 Oct 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 11 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Plant Site | State : | Haryana | District : | Jhajjar | Tehsil : | Beri | Village : | Bhutiyan |
| 90 | Employment,
CSR activities
in nearby
areas, Training centers, Environment pollution | Others | Additional Deputy Commissioner | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chandigarh | (iii)Letter No. | 4-994/2011-RO(NZ)/110-111 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jul 24 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Malt Spirits | 0 | 10 | 10 | Kilo Litre per Day(KLD) | | Road | | (2.) | Power | 2.5 | 2 | 4.5 | Mega Watt(MW) | | Others | Cables | (3.) | ENA/RS/Ethanol/AA | 60 | 45 | 105 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Co-generation Power Plant | 2.5 | 2 | 4.5 | MW | (2.) | Grain Based Distillery | 60 | 45 | 105 | KLPD | (3.) | Malt Spirits Plant | 0 | 10 | 10 | KLPD | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Dec 2015 | (iv)Valid Upto | 30 Sep 2020 | (v)File No. | 53D/6, 53D/5,53D/9, 53D/10 | (vi)Application No. | HSPCB/Consent/:2777415JHACTO2373079 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 25 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 41300 | (b)Existing quantity of raw material/fuel | 56000 | (c)Total quantity of raw material/fuel | 97300 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Grains – Maize, jowar, broken rice | 89600 | Tons per Annum | | Through Suppliers | Road | | 1000 | MoU | | Copy of Linkage | (2.) | Barley for malting | 7700 | Tons per Annum | | Through Suppliers | Road | | 200 | Open Market | | Copy of Linkage | (3.) | Coal as a Fuel for Boiler | 56000 | Tons per Annum | | Through Suppliers | Road | | 2000 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 86.4 | 58.2 | 85.74 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 42.5 | 23.6 | 42.11 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 15.6 | 7.0 | 15.36 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 24.2 | 11.1 | 23.87 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 1368 | 412 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 579 | 165 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 587.1 | 17.37 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 2.46 | 1.11 | 1.0 | 1.5 | (6.) | pH | | | NA | | 8.15 | 7.43 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.26 | 7.26 | E | (2.) | COD | | mg/l | | 24.30 | 24.30 | E | (3.) | DO | | mg/l | | 4.90 | 4.90 | E | (4.) | BOD | | mg/l | | 6.20 | 6.20 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.4 | 53.2 | Industrial-75, commercial-65, residential-55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.3 | 43 | Industrial-70, Commercial-55, Residential-45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 274.86 | 137.23 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.44 | 0.13 | (3.) | K(Potassium) | Kilogram per hectare | | 208.39 | 89.48 | (4.) | pH | | | 8.14 | 7.28 | (5.) | P(Phosphorus) | Kilogram per hectare | | 67.78 | 15.93 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.53 To 19.25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.43 To 18.3 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 900 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(418)/NWR/CGWA/2011-1404 | 09 Jul 2018 | 900 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 312 | 500 | Anaerobic, aerobic, filters and RO Plant | Reuse within the Plant & Recycling | | 312 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 312 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 312 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | DDGS | Others | By-product as cattle feed | 17850 | Tons | 200 | Road | | Others | Use as Cattle feed | (2.) | Ash | Fly Ash | | 19600 | Tons | 100 | Road | | Others | Given to nearby Cement or Brick manufacturers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 84.2 | 1 | 0 | 84.35 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 15.6 | 1 | 0 | 16.46 | 80 | (3.) | NOx | | Microgram per Meter Cube | 23.1 | 1 | 0 | 25.6 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 42.5 | 1 | 0 | 42.501 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Coal or rice husk | 50 | 2.5 | PM10 | | 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4375 | (b)Source | 4.5 MW Co-generation Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 x 750 and 1000 KVA | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 10.11 | Total Land (ha.) | 10.11 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 30057.26 | (b)Waste/Barren Land (ha.) | 189.88 | (c)Grazing/ Community Land (ha.) | 455.19 | (d)Surface Water Bodies (ha.) | 717.36 | (e)Settlements (ha.) | 1107.63 | (f)Industrial (ha.) | 12.08 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Electrical Substation | 18.84 | Total (ha.) | 32558.24 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.32 | | (2.) | Green belt | | 3.3 | | (3.) | Others | Storage yard, Road, Parking, Office & others | 3.49 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | No CPA within 10 km radius | (2.) | NPA | Not Applicable | 0 | No NPA within 10 km radius | (3.) | ESAs | Not Applicable | 0 | No ESA within 10 km radius | (4.) | WLS | Not Applicable | 0 | No WLS within 10 km radius | (5.) | ESZs | Not Applicable | 0 | No ESZ within 10 km radius | (6.) | Corridors | Not Applicable | 0 | No Corridors within 10 km radius | (7.) | Wildlife Corridors | Not Applicable | 0 | No wildlife corridors within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Not Applicable | 0 | No forest within 10 km radius | (2.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological sites within 10 km radius | (3.) | Defence Installations | | Not Applicable | 0 | No defence installations within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.11 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Canal | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 1 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 250 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 170 | (e)No. of working days | 350 | (f)Total Manpower | 440 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2.1 | 1.2 | 3.3 | (2.) | Percentage of Total Project Area | 21 | 12 | 33 | (3.) | No. of Plants | 1500 | 2000 | 3500 | (4.) | Funds Allocated | 1500000 | 5000000 | 6500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Zero Liquid Discharge Project and Greenbelt development | (2.) | Financial | Revenue generation | (3.) | Social | Employment generation and CSR Activities | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001 | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Regional Office of the Ministry in their letter dated 11/3/2019 along with the CCR for the EC dated 12/10/2011, has made certain observations with the request to submit time bound action taken report on non-complied conditions. Present status in this regard may be informed. | 02 May 2019 | 2. | NA | The correction have been made as per the instruction received | 17 May 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manish Singh | Designation | GM | Name of Company (Applicant Name should not be given here) | ADS SPIRITS PVT. LTD. | Address | ADS Tower, Main Delhi Rohtak Road, Dharampura |
|