1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Dolomite and Limestone Mining Project, Kanubenahalli (V), Hodadurga (T), Chitradurga (D), Karnataka state | (b)Name of the Company / Organisation | T K CHANDRAPPA | (c)Registered Address | Part of Survey no 37 & 43, Kanubenahalli (V), Hosadurga(T), Chitradurga (D), Karnataka.,,Chitradurga,Karnataka-577527 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Chandrappa T K | (b)Designation (Owner/ Partner/ CEO) | Mining Engineer | (c)Address | 737, 4th main, 4th cross, Srinivasa Block, BEML layout, Rajarajeshwari Nagar, Bangalore, Karnataka,,Bangalore South,Bangalore Urban,Karnataka-560072 | (d)Pin code | 560072 | (e)E-mail | tkchandrappa@gmail.com | (f)STD Code. | 80(f)Telephone No. | 25444999 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/KA/MIN/51650/2016 | (d)Master Proposal Number(Single Window) | SW/103115/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No 37 and 43 | (b)Pincode | 577533 | (c)Bounded Latitudes (North) | | From | | Degree | 13.7314 | Minutes | | Second | | From | | Degree | 13.7583 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.4905 | Minutes | | Second | | From | | Degree | 76.5058 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | D43Q5, D43Q6, D43Q9, D43Q10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 701 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 9.6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Chitradurga | Hosdurga | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/121/2016-IA.II(M) | (b)Date of Apply of TOR | 15 Mar 2016 | (c)Date of Issue of TOR / Standard ToR | 20 May 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Dec 2017 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| Govt. Primary School, Kanubenahalli | State : | Karnataka | District : | Chitradurga | Tehsil : | Hosdurga | Village : | Kanubenahalli |
| 50 | All the issues raised during Public hearing and action plan for the same is given in Annexure 3 and Annexure 4 | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Mining Activity | 174.02 ha | area | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 100000 | Tons per Annum | | Road | | (2.) | Dolomite | 50000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 60 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 9 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.2 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron Ore | 400 | Others | Litres per day | Local Market | Road | | 5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2016 To 28 Dec 2016 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 26.7 | 16.5 | 26.7 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 24.4 | 15.6 | 24.4 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 53.9 | 36.8 | 53.9 | 100 | (4.) | SO2 | | Micro Gram per Meter Cube | 15.9 | 6.8 | 15.9 | 80 | (5.) | Others | CO | Micro Gram per Meter Cube | 594 | 285 | 594 | 2000 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 2083 | 543 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 684 | 241 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 380 | 77 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 1.20 | 0.51 | 1.0 | 1.5 | (5.) | Heavy Metals | | Iron | mg/l | | 0.25 | 0.2 | 0.3 | 0.3 | (6.) | Others | Lead | | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (8.) | pH | | | NA | | 8.1 | 7.1 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 02 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.8 | 7.8 | A | (2.) | Others | TDS | mg/l | | 1264 | 412 | C | (3.) | BOD | | mg/l | | 12 | 3 | D | (4.) | COD | | mg/l | | 52 | 18 | D | (5.) | DO | | mg/l | | 5.9 | 4.8 | B | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.4 | 51.8 | Industrial - 65, Residential - 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.9 | 41.4 | Industrial - 65, Residential - 55 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 320 | 285 | (2.) | K(Potassium) | Kilogram per hectare | | 480 | 287 | (3.) | Electric Conductivity | Others | Microsiemens per Centimeter | 177 | 73 | (4.) | pH | | | 7.3 | 7.1 | (5.) | P(Phosphorus) | Kilogram per hectare | | 18.1 | 10.3 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 27 To 6 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tankers | 112.2 | 5 | Not Appliacble | modeOthers | Water Tankers | Others | Tankers | 0 | 23 Apr 2019 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 4 | 4 | Soakpit/Septic tank | Green Belt Renewal Plant | | 4 | | (2.) | Vehicle Wash | 10 | 10 | Oil and Grease Trap and Sedimentation Tank | Green Belt Renewal Plant | | 10 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 14 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 14 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Top Soil and Over burden | Others | Top soil and Over burder | 54104 | Tons | 0 | Road | | Others | Will be used within the site | (2.) | Domestic Waste | Municipal Solid Waste | | 45 | Tons | 5 | Road | | Others | Municipal Bins | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 26.7 | 1 | 5.4 | 32.2 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 53.9 | 1 | 5.4 | 59.4 | 100 | (3.) | NOx | | Microgram per Meter Cube | 23.9 | 1 | 3.8 | 27.71 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 15.9 | 1 | 0.17 | 16.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | HSD | 7 | 0.2 | SO2 | | 0.01 g/s | (2.) | DG Set | HSD | 7 | 0.2 | PM10 | | 0 | (3.) | DG set | HSD | 7 | 0.2 | NOx | | 0.22 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | DG set | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 KVA DG Set | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 174.02 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 174.02 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 173.7 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Roads | 0.32 | Total (ha.) | 174.01999999999998 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 77.35 | Mining Area | (2.) | OB Dump Area | | 10.10 | Dumping Area | (3.) | Main Plant | | 1.69 | Crushing and Screening plant | (4.) | Built Up Area | | 7.61 | Buildings and other utilities Area | (5.) | Green belt | | 3.27 | | (6.) | Others | Unutilized/Unused Land | 74 | Balance area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nill | 10 | None in 10 km radius | (2.) | WLS | Nill | 10 | None in 10 km radius | (3.) | NPA | Nill | 10 | None in 10 km radius | (4.) | ESZs | Nill | 10 | None in 10 km radius | (5.) | Wildlife Corridors | Nill | 10 | None in 10 km radius | (6.) | ESAs | Nill | 10 | None in 10 km radius | (7.) | Corridors | Nill | 10 | None in 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Marikanava RF | 0.5 | Reserve Forest | (2.) | Defence Installations | | Nill | 10 | None in 10 km radius | (3.) | Archaeological Sites | | Nill | 10 | None in 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 174.02 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kaggalakatte Lake | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 79 | (e)No. of working days | 300 | (f)Total Manpower | 99 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 6.22 | (b)Percentage of Total Project Area | 3.57 | (c)No. of Plants to be Planted | 6000 | (d)Funds Allocated for Plantation | 2500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Opening up new areas will reduce the stress/impact on existing mining leases and will lead
to exploring mineral bodies. Proper exploration of mineral resources will delineate the
quality/quantity and help to wrap up at the most suitable exploitation strategy for
conserving the mineral and reducing waste handling. Limestone and Dolomite will be supplied to the
steel plants and cement industries located in Karnataka | (2.) | Social | Higher employment potential of the area. Higher infrastructure facilities in and around the project site. Better health care for the locality, as facilities available with the mine can become
available to the community including special camps to be arranged. Better admixture of cultures will result in preservation of the cultural heritage of
the area and also will result in better appreciation of different cultures of the
people from such diverse areas/localities. The company in the field of s | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 2 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Dolomite | Minor | (2.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1.5 Lakhs TPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 279/1053/2011/BNG | (b)Date of Approval | 29 Nov 2010 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 174.02 | (f)Approved Capacity | 150000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 9085568 | (b)Mineable Reserves (Million Ton) | 8770432 | (c)Extractable Reserves(Million Ton) | 8770432 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Limestone and Dolomite | (f)Stripping Ratio | 1 : 0.35 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 63 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | Yes | (b)Beneficiation / Washing Technology | Benefication | (c)Capacity | 100 | (d)Whether it is proposed to install crusher within the mining lease area | Yes | (e)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 100 | Tons/hr | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 174.02 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 14 Jun 2010 | (iii)Validity of LOI | 20 | (iv)Reference No. of LOI | DMG:MLS:22 AML 2009/3888 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 174.02 | (iii)Validity of the lease deed | From : 13 Dec 2006 To : 14 Dec 2008 | (iv)Date of Execution of Mining Lese | 12 Jan 2009 | (v)Reference Number | DGM 22/AML/2009/12566 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NA | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 10.10 | (iii)Height (in meter) | 20 | (iv)Quantity (in Million Cubic meter) | 2.014 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0.02 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0.02 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 77.35 | (b)Depth (in meter) | 10 | (c)Volume (in Million Cubic meter) | 0.42 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | NA | (b)Surface to Siding/Loading | NA | (c)Transportation / Conveyor Details | Transportation via Trucks | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 0 | 0 | 0 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 0 | 0 | 0 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 0 | 0 | 0 | (6.) | OTHERS(Specify) | Revenue Land | 174.02 | 0 | 174.02 | (7.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 174.02 | 0 | 174.02 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 77.35 | 0 | 0 | | 77.35 | (2.) | TOP SOIL STORAGE | | 1.09 | 0 | 0 | | 1.09 | (3.) | ROADS | | 0.48 | 0 | 0 | | 0.48 | (4.) | GREEN BELT | | 3.27 | 0 | 0 | | 3.27 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 7.73 | 0 | 0 | | 7.73 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | INTERNAL OB DUMPS | | 10.10 | 0 | 0 | | 10.1 | (8.) | VIRGIN AREA | | 74 | 0 | 0 | | 74 | |
TOTAL | 174.02 | 0 | 0 | 0 | 174.02 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 10.10 | (c)Quarry(in hectare) | 77.35 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 77.35 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 3.27 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA 061 | (ii)Name of the EIA Consultant | Ramky Enviro Services Private Limited | (iii)Address | Ramky Grandiose, Ramky Towers complex, Gachibowli, Hyderabad | (iv)Mobile No. | 9949991029 | (v)Landline No. | 0402301535 | (vi)Email Id | vvijaykumar@ramky.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 20 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please submit the following:
1) Upload the full Mining Plan
2) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. | 08 May 2019 | 2. | NA | The correction have been made as per the instruction received | 13 May 2019 | 3. | NA | You are requested to submit the following documents
1. Kindly submit the District Survey Report for Dolomite minor mineral as per Ministry Notification S. O. No. 3611 (E) dated 25th July 2018.
2. Mining plan for 174.20 ha, however, lease deed for 174.02 ha. Please submit the mining plan for 174.02 ha. | 10 Jun 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Chandrappa T K | Designation | Mining Engineer | Name of Company (Applicant Name should not be given here) | T K CHANDRAPPA | Address | Part of Survey no 37 & 43, Kanubenahalli (V), Hosadurga(T), Chitradurga (D), Karnataka. |
|