Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Bonageri Life Science Limited
(b)Name of the Company / Organisation M/S BONAGERI LIFE SCIENCE LIMITED
(c)Registered Address Plot No-546/A, Belur Industrial Area, Village-Belur, Tehsil & District-Dharwad (Karnataka),,Dharwad,Karnataka-580011
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Suresh Bonageri
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address 12/1 Shivkripa Complex, Neeligin Road, Hubli-580029, Karnataka.,,Hubli,Dharwad,Karnataka-580029
(d)Pin code 580029
(e)E-mail bonagerilifescience2018@gmail.com
(f)STD Code. 836(f)Telephone No. 2251126
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/KA/IND2/88463/2018
(d)Master Proposal Number(Single Window) SW/103099/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 546/A, Belur Industrial Area
(b)Pincode 580011
(c)Bounded Latitudes (North)
From
Degree 15.30.07.66
Minutes
Second
From
Degree 15.30.10.15
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 745423.13
Minutes
Second
From
Degree 745423.26
Minutes
Second
(e)Survey of India Topo Sheet No. 48I/14, 48I/15, 48M/2, 48M/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 717
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 700
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDharwadDharwad
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/410/2018-IA-II(I)
(b)Date of Apply of TOR 13 Dec 2018
(c)Date of Issue of TOR / Standard ToR 14 Jan 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per notification 27.04.2018 para (ii) "The exem
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)S.S Reactor2 KL2 nos.
(2.)S.S. Reactor3 KL2 nos.
(3.)S.S Reactor8 KL1 no.
(4.)Filter Press43x361 no.
(5.)Rotatory Vacuum Drier760 KG2 nos.
(6.)Notch Filter2000 LT1 no.
(7.)Centrifuge24-25 KG2 nos.
(8.)Centrifuge250-300 KG1 no.
(9.)Fluid Bed Drier60 KG2 nos.
(10.)Cooling Tower35 TR2 nos.
(11.)Hot Water Bath1 KL2 nos.
(12.)Hot Water Bath3 KL
(13.)Vaccum Ejector730 MM/HG2 nos.
(14.)Oxygen Feeder10 cyclinder2 nos.
(15.)Oil Vaccum Pump730 MM/HG3 nos.
(16.)Grinder MachineNormal-11 no.
(17.)Oil Boiler ( Thermal)850 KG/HR2 nos.
(18.)S.S Reactor6 KL2 nos.
(19.)Cooling Tower25 TR2 nos.
(20.)Oil Boiler ( Thermal)850 KG/HR2 nos.
(21.)Lathe Machine 14142 nos.
(22.)Chilling Comp17 TR
(23.)Steam Ejector740 MM/HG2 nos.
(24.)S.S Reactor4 KL2 nos.
(25.)S.S Reactor5 KL2 nos.
(26.)Filter press23*182 nos.
(27.)Notch Filter1200 LT2 nos.
(28.)Centrifuge24-25 KG2 nos.
(29.)Centrifuge36-150 KG2 nos.
(30.)Ribbon Blender600 KG2 nos.
(31.)Drill MachineNormal-11 no.
(32.)Chilling Comp.17 TR2 nos.
(33.)Hot Water Bath3 KL
(34.)Scrubber System1500 RPM2 nos.
(35.)Submersible Borewell-1SIZE 43 nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Paclobutrazol50Tons per AnnumRoad
(2.)Thiram50Tons per AnnumRoad
(3.)Glyphosate50Tons per AnnumRoad
(4.)Fipronil50Tons per AnnumRoad
(5.)Myclobutanil50Tons per AnnumRoad
(6.)Lambdacylothrin Acid & TC300Tons per AnnumRoad
(7.)2,4 D Amine Salt TC2000Tons per AnnumRoad
(8.)Ziram50Tons per AnnumRoad
(9.)Aluminium Phosphide1500Tons per AnnumRoad
(10.)Chlorpyrifos100Tons per AnnumRoad
(11.)Difenoconazole50Tons per AnnumRoad
(12.)Bispyribac Sodium50Tons per AnnumRoad
(13.)Zink Phosphide600Tons per AnnumRoad
(14.)Tebuconazole50Tons per AnnumRoad
(15.)Chlorothalonil50Tons per AnnumRoad
(16.)Tebuconazole50Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.005
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.02
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.015
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7603.395
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7603.395
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diethyl Phosphorochlorido Thioate45.70Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(2.)Sodium Salt of 3,5,6 -Trichloropyridin-2-ol62.80Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(3.)MDC17.15Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(4.)Phase Transfer Catalyst Tertiary Amine Acid Boric Tampon1.50Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(5.)? chloropinacolone25.45Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(6.)P-chloro benzyl chloride30.45Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(7.)Sodium Borohydride7Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(8.)Sodium Dimethy Dithio Carmbamal 40% solution35.20Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(9.)Zinc Sulphate Heptahydrate14.01Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(10.)Sodium Complex salt Na T71.97Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(11.)Chlorine68Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(12.)Sodium Carbonate2.50Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(13.)Toluene13.45Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(14.)1,2,4-Triazole51.9Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 30 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube40.0223.4739.863.96
(2.)SO2Micro Gram per Meter Cube9.994.799.471.07
(3.)OthersCOMicro Gram per Meter Cube0.90.110.80.18
(4.)PM10Micro Gram per Meter Cube68.5643.4867.023.69
(5.)NOxMicro Gram per Meter Cube24.0910.0223.591.74
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l7682905002000
(2.)OthersNitratemg/l8.44.64545
(3.)Total Hardnessmg/l348140200600
(4.)Fluoridemg/l0.80.41.01.5
(5.)Heavy MetalsLeadmg/l0.010.010.010.01
(6.)TSSNA0000
(7.)pHNA7.686.986.58.5
(8.)Chloridesmg/l201522501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l00D
(2.)BODmg/l00D
(3.)DOmg/l00D
(4.)pHNA7.677.03D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))4234.570
(2.)Leq(Day)A-weighted decibels(dB(A))63.746.675
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.727.81
(2.)N(Nitrogen)Kilogram per hectare243.22172.845
(3.)P(Phosphorus)Kilogram per hectare111.5468.82
(4.)Electric ConductivityOthersmicrosiemen429127
(5.)K(Potassium)Kilogram per hectare140.5875.15
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 17.40 To 2.18
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.28 To 19.10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Corporation Hubli-Dharwad.2520 Not Appliacble modeOthersMunicipal Corporation Hubli-Dharwad.OthersMunicipal Corporation Hubli-Dharwad.NA20 Jun 201725
(2.)OthersMunicipal Corporation Hubli-Dharwad.2520 Not Appliacble modeOthersMunicipal Corporation Hubli-Dharwad.OthersMunicipal Corporation Hubli-Dharwad.NA20 Jun 201725
(3.)OthersMunicipal Corporation Hubli-Dharwad.2520 Not Appliacble modeOthersMunicipal Corporation Hubli-Dharwad.OthersMunicipal Corporation Hubli-Dharwad.NA20 Jun 201725
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Waste Water2830ETP/RO/MEEReuse within the Plant & Recycling28
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 28
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 28
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre20RoadAuthorized Recyclers
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)97Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Process ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)167.45Tons20RoadAuthorized Recyclers
(4.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)85Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Non Toxic Process wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.05Kilolitre20RoadAuthorized Recyclers
(6.)Rice Husk BriquettesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)264Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube10020
(2.)SO2Microgram per Meter Cube9.478000.410100
(3.)NOxMicrogram per Meter Cube23.598001.225100
(4.)PM10Microgram per Meter Cube67.028001.668.62100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerRice Husk Briquettee300.6PM100.585
(2.)DG SetHSD50.6SO20.195
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 62.5 (2 nos)
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.3741
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.3741
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 18829.65
(b)Waste/Barren Land (ha.) 1378.84
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 291.15
(e)Settlements (ha.) 3668.37
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 3138.89
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Fellow Land & Scrub land 10430.03
    Total (ha.) 37736.93
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.3741
Total (ha.) 1.3741
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)ESZsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserve Forest I0.27Km
(2.)Defence InstallationsNA00
(3.)Archaeological SitesNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 85
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 85
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.4560
(b)Percentage of Total Project Area 33.19
(c)No. of Plants to be Planted 950
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social: Better education facilities, proper healthcare, road infrastructure and drinking water facilities are basic social amenities for better living standards of any human being which will further increase the above amenities directly/indirectly either by providing or by improving the facilities in the area, which will help in uplifting the living standards of local communities.
(2.)FinancialInfrastructure will get improved and enhance the employment opportunity for both skilled and unskilled person from nearby area. Direct employment as well as indirect employment due to ancillary services will be given to the local people. Therefore, the socio-economic status of the local people will be improved. The details of employment opportunity during construction and operation are discussed underneath.Infrastructure will get improved and enhance the employment opportunity for both skilled a
(3.)Environmental33 % plantation is proposed in the project. Aesthetic beauty will increase. All pollution control measures will be adopted to protect the environment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 167
(ii)Name of the EIA Consultant Wolkem India Limited
(iii)Address E- 101-102, Mewar Industrial Area, Madri, Udaipur, Pin - 313003, Rajasthan
(iv)Mobile No. 9772833835
(v)Landline No. 2494600
(vi)Email Id info.wcs@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease provide copy of the EC for Belur Industrial area to justify the claim for exemption from public hearing. Firm commitment of the concerned regulatory authority for supply of water to meet the industrial requirements. 03 May 2019
2.NAThe correction have been made as per the instruction received 13 Dec 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSuresh Bonageri
DesignationMD
Name of Company (Applicant Name should not be given here)M/S BONAGERI LIFE SCIENCE LIMITED
AddressPlot No-546/A, Belur Industrial Area, Village-Belur, Tehsil & District-Dharwad (Karnataka)