|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Bonageri Life Science Limited | (b)Name of the Company / Organisation | M/S BONAGERI LIFE SCIENCE LIMITED | (c)Registered Address | Plot No-546/A, Belur Industrial Area, Village-Belur, Tehsil & District-Dharwad (Karnataka),,Dharwad,Karnataka-580011 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Suresh Bonageri | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | 12/1 Shivkripa Complex, Neeligin Road, Hubli-580029, Karnataka.,,Hubli,Dharwad,Karnataka-580029 | (d)Pin code | 580029 | (e)E-mail | bonagerilifescience2018@gmail.com | (f)STD Code. | 836(f)Telephone No. | 2251126 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| (b)Category | A | (c)Proposal Number | IA/KA/IND2/88463/2018 | (d)Master Proposal Number(Single Window) | SW/103099/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 546/A, Belur Industrial Area | (b)Pincode | 580011 | (c)Bounded Latitudes (North) | | From | | Degree | 15.30.07.66 | Minutes | | Second | | From | | Degree | 15.30.10.15 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 745423.13 | Minutes | | Second | | From | | Degree | 745423.26 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 48I/14, 48I/15, 48M/2, 48M/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 717 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 700 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Dharwad | Dharwad | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/410/2018-IA-II(I) | (b)Date of Apply of TOR | 13 Dec 2018 | (c)Date of Issue of TOR / Standard ToR | 14 Jan 2019 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per notification 27.04.2018 para (ii) "The exem | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | S.S Reactor | 2 KL | 2 nos. | (2.) | S.S. Reactor | 3 KL | 2 nos. | (3.) | S.S Reactor | 8 KL | 1 no. | (4.) | Filter Press | 43x36 | 1 no. | (5.) | Rotatory Vacuum Drier | 760 KG | 2 nos. | (6.) | Notch Filter | 2000 LT | 1 no. | (7.) | Centrifuge | 24-25 KG | 2 nos. | (8.) | Centrifuge | 250-300 KG | 1 no. | (9.) | Fluid Bed Drier | 60 KG | 2 nos. | (10.) | Cooling Tower | 35 TR | 2 nos. | (11.) | Hot Water Bath | 1 KL | 2 nos. | (12.) | Hot Water Bath | 3 KL | | (13.) | Vaccum Ejector | 730 MM/HG | 2 nos. | (14.) | Oxygen Feeder | 10 cyclinder | 2 nos. | (15.) | Oil Vaccum Pump | 730 MM/HG | 3 nos. | (16.) | Grinder Machine | Normal-1 | 1 no. | (17.) | Oil Boiler ( Thermal) | 850 KG/HR | 2 nos. | (18.) | S.S Reactor | 6 KL | 2 nos. | (19.) | Cooling Tower | 25 TR | 2 nos. | (20.) | Oil Boiler ( Thermal) | 850 KG/HR | 2 nos. | (21.) | Lathe Machine 14 | 14 | 2 nos. | (22.) | Chilling Comp | 17 TR | | (23.) | Steam Ejector | 740 MM/HG | 2 nos. | (24.) | S.S Reactor | 4 KL | 2 nos. | (25.) | S.S Reactor | 5 KL | 2 nos. | (26.) | Filter press | 23*18 | 2 nos. | (27.) | Notch Filter | 1200 LT | 2 nos. | (28.) | Centrifuge | 24-25 KG | 2 nos. | (29.) | Centrifuge | 36-150 KG | 2 nos. | (30.) | Ribbon Blender | 600 KG | 2 nos. | (31.) | Drill Machine | Normal-1 | 1 no. | (32.) | Chilling Comp. | 17 TR | 2 nos. | (33.) | Hot Water Bath | 3 KL | | (34.) | Scrubber System | 1500 RPM | 2 nos. | (35.) | Submersible Borewell-1 | SIZE 4 | 3 nos. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Paclobutrazol | 50 | Tons per Annum | | Road | | (2.) | Thiram | 50 | Tons per Annum | | Road | | (3.) | Glyphosate | 50 | Tons per Annum | | Road | | (4.) | Fipronil | 50 | Tons per Annum | | Road | | (5.) | Myclobutanil | 50 | Tons per Annum | | Road | | (6.) | Lambdacylothrin Acid & TC | 300 | Tons per Annum | | Road | | (7.) | 2,4 D Amine Salt TC | 2000 | Tons per Annum | | Road | | (8.) | Ziram | 50 | Tons per Annum | | Road | | (9.) | Aluminium Phosphide | 1500 | Tons per Annum | | Road | | (10.) | Chlorpyrifos | 100 | Tons per Annum | | Road | | (11.) | Difenoconazole | 50 | Tons per Annum | | Road | | (12.) | Bispyribac Sodium | 50 | Tons per Annum | | Road | | (13.) | Zink Phosphide | 600 | Tons per Annum | | Road | | (14.) | Tebuconazole | 50 | Tons per Annum | | Road | | (15.) | Chlorothalonil | 50 | Tons per Annum | | Road | | (16.) | Tebuconazole | 50 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.005 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.02 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.015 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7603.395 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 7603.395 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diethyl Phosphorochlorido Thioate | 45.70 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (2.) | Sodium Salt of 3,5,6 -Trichloropyridin-2-ol | 62.80 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (3.) | MDC | 17.15 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (4.) | Phase Transfer Catalyst Tertiary Amine Acid Boric Tampon | 1.50 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (5.) | ? chloropinacolone | 25.45 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (6.) | P-chloro benzyl chloride | 30.45 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (7.) | Sodium Borohydride | 7 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (8.) | Sodium Dimethy Dithio Carmbamal 40% solution | 35.20 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (9.) | Zinc Sulphate Heptahydrate | 14.01 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (10.) | Sodium Complex salt Na T | 71.97 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (11.) | Chlorine | 68 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (12.) | Sodium Carbonate | 2.50 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (13.) | Toluene | 13.45 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (14.) | 1,2,4-Triazole | 51.9 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 30 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 40.02 | 23.47 | 39.86 | 3.96 | (2.) | SO2 | | Micro Gram per Meter Cube | 9.99 | 4.79 | 9.47 | 1.07 | (3.) | Others | CO | Micro Gram per Meter Cube | 0.9 | 0.11 | 0.8 | 0.18 | (4.) | PM10 | | Micro Gram per Meter Cube | 68.56 | 43.48 | 67.02 | 3.69 | (5.) | NOx | | Micro Gram per Meter Cube | 24.09 | 10.02 | 23.59 | 1.74 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 768 | 290 | 500 | 2000 | (2.) | Others | Nitrate | | mg/l | | 8.4 | 4.6 | 45 | 45 | (3.) | Total Hardness | | | mg/l | | 348 | 140 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 0.8 | 0.4 | 1.0 | 1.5 | (5.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (6.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (7.) | pH | | | NA | | 7.68 | 6.98 | 6.5 | 8.5 | (8.) | Chlorides | | | mg/l | | 201 | 52 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 0 | 0 | D | (2.) | BOD | | mg/l | | 0 | 0 | D | (3.) | DO | | mg/l | | 0 | 0 | D | (4.) | pH | | NA | | 7.67 | 7.03 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 42 | 34.5 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.7 | 46.6 | 75 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.72 | 7.81 | (2.) | N(Nitrogen) | Kilogram per hectare | | 243.22 | 172.845 | (3.) | P(Phosphorus) | Kilogram per hectare | | 111.54 | 68.82 | (4.) | Electric Conductivity | Others | microsiemen | 429 | 127 | (5.) | K(Potassium) | Kilogram per hectare | | 140.58 | 75.15 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 17.40 To 2.18 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.28 To 19.10 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Municipal Corporation Hubli-Dharwad. | 25 | 20 | Not Appliacble | modeOthers | Municipal Corporation Hubli-Dharwad. | Others | Municipal Corporation Hubli-Dharwad. | NA | 20 Jun 2017 | 25 | (2.) | Others | Municipal Corporation Hubli-Dharwad. | 25 | 20 | Not Appliacble | modeOthers | Municipal Corporation Hubli-Dharwad. | Others | Municipal Corporation Hubli-Dharwad. | NA | 20 Jun 2017 | 25 | (3.) | Others | Municipal Corporation Hubli-Dharwad. | 25 | 20 | Not Appliacble | modeOthers | Municipal Corporation Hubli-Dharwad. | Others | Municipal Corporation Hubli-Dharwad. | NA | 20 Jun 2017 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Waste Water | 28 | 30 | ETP/RO/MEE | Reuse within the Plant & Recycling | | 28 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 28 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 28 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.05 | Kilolitre | 20 | Road | | Authorized Recyclers | | (2.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 97 | Tons | 20 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Process Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 167.45 | Tons | 20 | Road | | Authorized Recyclers | | (4.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 85 | Tons | 20 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (5.) | Non Toxic Process waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.05 | Kilolitre | 20 | Road | | Authorized Recyclers | | (6.) | Rice Husk Briquettes | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 264 | Tons | 20 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 1 | 0 | 0 | 2 | 0 | (2.) | SO2 | | Microgram per Meter Cube | 9.47 | 800 | 0.4 | 10 | 100 | (3.) | NOx | | Microgram per Meter Cube | 23.59 | 800 | 1.2 | 25 | 100 | (4.) | PM10 | | Microgram per Meter Cube | 67.02 | 800 | 1.6 | 68.62 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Rice Husk Briquettee | 30 | 0.6 | PM10 | | 0.585 | (2.) | DG Set | HSD | 5 | 0.6 | SO2 | | 0.195 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 750 | (b)Source | State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 62.5 (2 nos) | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1.3741 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1.3741 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18829.65 | (b)Waste/Barren Land (ha.) | 1378.84 | (c)Grazing/ Community Land (ha.) | 0.00 | (d)Surface Water Bodies (ha.) | 291.15 | (e)Settlements (ha.) | 3668.37 | (f)Industrial (ha.) | 0.00 | (g)Forest (ha.) | 3138.89 | (h)Mangroves (ha.) | 0.00 | (i)Marine Area (ha.) | 0.00 | (j)Others (ha.) : Fellow Land & Scrub land | 10430.03 | Total (ha.) | 37736.93 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.3741 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | NPA | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | Corridors | NA | 0 | NA | (5.) | Wildlife Corridors | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | WLS | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserve Forest I | 0.27 | Km | (2.) | Defence Installations | | NA | 0 | 0 | (3.) | Archaeological Sites | | NA | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 85 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 85 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.4560 | (b)Percentage of Total Project Area | 33.19 | (c)No. of Plants to be Planted | 950 | (d)Funds Allocated for Plantation | 50000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | : Better education facilities, proper healthcare, road infrastructure and drinking water facilities are basic social amenities for better living standards of any human being which will further increase the above amenities directly/indirectly either by providing or by improving the facilities in the area, which will help in uplifting the living standards of local communities. | (2.) | Financial | Infrastructure will get improved and enhance the employment opportunity for both skilled and unskilled person from nearby area. Direct employment as well as indirect employment due to ancillary services will be given to the local people. Therefore, the socio-economic status of the local people will be improved. The details of employment opportunity during construction and operation are discussed underneath.Infrastructure will get improved and enhance the employment opportunity for both skilled a | (3.) | Environmental | 33 % plantation is proposed in the project. Aesthetic beauty will increase.
All pollution control measures will be adopted to protect the environment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 167 | (ii)Name of the EIA Consultant | Wolkem India Limited | (iii)Address | E- 101-102, Mewar Industrial Area, Madri, Udaipur, Pin - 313003, Rajasthan | (iv)Mobile No. | 9772833835 | (v)Landline No. | 2494600 | (vi)Email Id | info.wcs@wolkem.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 19 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please provide copy of the EC for Belur Industrial area to justify the claim for exemption from public hearing. Firm commitment of the concerned regulatory authority for supply of water to meet the industrial requirements. | 03 May 2019 | 2. | NA | The correction have been made as per the instruction received | 13 Dec 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Suresh Bonageri | Designation | MD | Name of Company (Applicant Name should not be given here) | M/S BONAGERI LIFE SCIENCE LIMITED | Address | Plot No-546/A, Belur Industrial Area, Village-Belur, Tehsil & District-Dharwad (Karnataka) |
|