Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Cement Project - Clinker (9.5 to 13 MTPA), Cement (12 MTPA to 16 MTPA), & WHRB (30 to 45 MW) near Villages Sangaria, Borakheri, Peerkhera and Rasulpura, Tehsil Nimbahera, Distr
(b)Name of the Company / Organisation WONDER CEMENT LIMITED
(c)Registered Address 17 Old FatehPura, Near Seva Mandir,UDAIPUR-313001, Rajasthan, India,,chittorgarh,Daman and Diu-31304
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SUNIL RAOSAHEB DESHMUKH
(b)Designation (Owner/ Partner/ CEO) General Manager (Environment)
(c)Address Wonder Cement Ltd., Corporate Office- 17, Old Fatehpura, Near Seva Mandir -Udaipur-313001 (Rajasthan),,,Udaipur,Daman and Diu-312601
(d)Pin code 312601
(e)E-mail wcl.environment@wondercement.com
(f)STD Code. 294(f)Telephone No. 2777777
(g)Fax No. 02942777140
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND/26626/2015
(d)Master Proposal Number(Single Window) SW/102845/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra map is enclosed as Annexure-I in additional
(b)Pincode 321601
(c)Bounded Latitudes (North)
From
Degree 243912.47
Minutes
Second
From
Degree 244014.8
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 743743.26
Minutes
Second
From
Degree 743848.56
Minutes
Second
(e)Survey of India Topo Sheet No. 45 L/9 & L/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 445
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBellarySandurIttanahalli / Taranagar
(2.)RajasthanchittorgarhNimbahera
(3.)RajasthanchittorgarhNimbahera
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/298/2012-IA(I)
(c)Date of Issue of TOR 28 Apr 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 30 Nov 2015
(c)Date of Issue of EC 17 Mar 2016
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :11 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
At public Place (Near Surpur Balaji Temple) Village Rasulpura, District Chittorgarh, Rajasthan
State :Rajasthan
District :chittorgarh
Tehsil :Nimbahera
Village :Rasulpura
263Employment for local, CSR activitiesOthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/Mine-517/872/2014/609
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 7 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)cement12416OthersMillion TPARoad,Rail
(2.)Clinker9.53.513OthersMilion TPARoad,Rail,Conveyor Belt
(3.)WHRB301545Mega Watt(MW)OthersThrough HT Power Cable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Klin3 nos. x 8000 TPD1 no. x 8000 TPD4 nos. x 8000 TPDExisting Line-I: 8000 TPD, Line-II: 8000 TPD & Line-III: 8000 TPD
(2.)Cooler3 nos. x 8000 TPD1 no. x 8000 TPD4 nos. x 8000 TPDExisting Line-I: 8000 TPD, Line-II: 8000 TPD & Line-III: 8000 TPD
(3.)Raw Mill2 nos. x 605 TPH & 2 nos. x 315 TPH2 nos. x 315 TPH2 nos. x 605 TPH & 4 nos. x 315 TPHExisting Line-I: 605 TPH, Line-II: 605 TPA & Line-III: 2 Nos. x 315 TPH
(4.)Coal Mill1 nos. x 35 TPH & 2 nos. x 40 TPH1 no. x 40 TPH1 no. x 35 TPH & 3 nos. x 40 TPHExisting Line-I: 35 TPH, Line-II: 40 TPH & Line-III: 40 TPH
(5.)Cement mill2 nos X 250 TPH, 2 nos X 265 TPH2 nos X 265 TPH2 nos X 250 TPH, 4 nos X 265 TPHExisting Line-I: 2 nos. X 250 TPH, Line-II: 2 nos. x 265 TPH & Line-III: Nil
(6.)Packing Plant8 nos X 240 TPH4 nos X 240 TPH12 nos X 240 TPHExisting Line-I: 4 nos. x 240 TPH, Line-II: 4 nos. x 240 TPH & Line-III: Nil
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Oct 2018
(iv)Valid Upto 31 Aug 2023
(v)File No. F(CPM)/Chittogragh(Nimbahera)/6(1)/2013-2014/4598-
(vi)Application No. Order.no. 2016-2017/CPM/4768 (Line I) & 2018-2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 150
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.75
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.179
(b)Existing quantity of raw material/fuel 0.499
(c)Total quantity of raw material/fuel 0.6779999999999999
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone19.1OthersMillion TPALocalRoad,Conveyor Belt0.8 CaptiveCopy of Linkage
(2.)Petcoke1.41OthersMillion TPALocalRoad,Rail562 MoUCopy of Linkage
(3.)Coal2.868OthersMillion TPALocalRoad,Rail900 Fuel Supply AgreementCopy of Linkage
(4.)Fly ash3.062OthersMillion TPALocalRoad200 MoUCopy of Linkage
(5.)GYPSUM0.972OthersMillion TPALocalRoad500 MoUCopy of Linkage
(6.)Red Ochre/Iron Ore1.64OthersMillion TPALocalRoad30 OthersPO copyCopy of Linkage
(7.)LATERITE0.678OthersMillion TPALocalRoad80 OthersPO copyCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube74.732.269.8100
(2.)PM2.5Micro Gram per Meter Cube39.210.734.660
(3.)NOxMicro Gram per Meter Cube32.711.229.980
(4.)SO2Micro Gram per Meter Cube21.38.020.880
    14.2.     No. of Ground Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsAluminium as Almg/l2.370.140.030.2
(2.)TSSmg/l1100
(3.)pHNA7.517.476.58.5
(4.)TDSmg/l2408.3533.95002000
(5.)Total Hardnessmg/l1080335200600
(6.)Chloridesmg/l889.642.542501000
(7.)Fluoridemg/l1.10.411.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.517.47D
(2.)DOmg/l5.85.5D
(3.)BODmg/l33D
(4.)CODmg/l55D
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.742.270
(2.)Leq(Day)A-weighted decibels(dB(A))70.745.675
    14.5.     No. of Soil Sample Monitored locations : 12
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.196.95
(2.)P(Phosphorus)Kilogram per hectare330.1292.8
(3.)K(Potassium)Kilogram per hectare612.43266.57
(4.)Electric ConductivityMillisiemens per Centimetre408116.8
(5.)N(Nitrogen)Kilogram per hectare208.09115.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 36.4 To 44.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.4 To 8.7
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA-21-4(212)/WR/CGWA/2007-1570
(f)Date of Issue 09 Oct 2015
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater8450.1Copy of Permission LetterPipelineTube WellRef: no. 21-4(212)/WR/CGWA/2007-157009 Oct 20152470
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Cement/CPP/WHRB135480ETPReuse within the Plant & Recycling135
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 135
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 135
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SludgeIndustrial Waste3300Kilolitre0.01OtherspipelineOthersHorticulture
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube39.21.5039.2160
(2.)PM10Microgram per Meter Cube74.71.50.7775.471100
(3.)SO2Microgram per Meter Cube21.31.50.0721.37180
(4.)NOxMicrogram per Meter Cube32.71.50.9033.6180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Kiln Raw MillCoal1656.1PM1035.4 kg/hr
(2.)kiln Raw MillCoal1656.1NOx188.9 kg/hr
(3.)Coal Mill-782.8PM106.95 kg.hr
(4.)Cooler-58.65.2PM1020.2 kg/hr
(5.)Raw Raw MillCoal1656.1SO215.51 kg/hr
(6.)Cement Mill-551.2PM102.9 kg/hr
(7.)LS Crusher-311.5PM104.71 kg/hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15760
(b)Source Captive thermal power plant -70 MW, WHRB -45 MW,Ca
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 MW
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 163.57
(c)Government Land (ha.) 27.494
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 191.064
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22054.5
(b)Waste/Barren Land (ha.) 6446.7
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2714.4
(e)Settlements (ha.) 2073.5
(f)Industrial (ha.) 1470.3
(g)Forest (ha.) 2940.6
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : nill 0
    Total (ha.) 37700.00000000001
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant68.984for proposed plant: 8.0 ha
(2.)Township17.6298
(3.)Green belt71.197
(4.)OthersOpen area11.5064Open area for further use
(5.)Built Up Area21.7468CPP,WHRB & ROAD
Total (ha.) 191.064
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0Nil
(2.)NPANil0Nil
(3.)Wildlife CorridorsNil0Nil
(4.)Critically Polluted AreaNil0Nil
(5.)ESAsNil0Nil
(6.)ESZsNil0Nil
(7.)CorridorsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestAlsigarh PF6.0NW
(2.)Defence InstallationsNil0Nil
(3.)Archaeological SitesNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 191.064
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock, Leopard and Indian Wolf
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 140
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. CWW letter 5521
(iii)Date of issue 06 Sep 2013
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area seasonal Nalla
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Murlia Dam
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 2.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 256
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 256
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt71.197071.197
(2.)Percentage of Total Project Area37037
(3.)No. of Plants1095800109580
(4.)Funds Allocated32800000032800000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe proposed expansion project will provide direct employment to a large number of personnel. This project will also generate indirect employment to a considerable number of families, who will render their services for the employees of the project. The project will also encourage ancillary industries in the region, which will not only increase the employment potential but also the economic base of the region will be further strengthened.
(2.)EnvironmentalThe plant will be operated on Zero Discharge Basis.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/19/0957 dated April 16th, 2019
(ii)Name of the EIA Consultant Vimta Labs Ltd.
(iii)Address 142, IDA Phase-2, Cherlapally, Hyderabad -500051
(iv)Mobile No. 9000711309
(v)Landline No. 0402726414
(vi)Email Id env@vimta.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 19 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAValid Ground water drawl permission from CGWA shall be submitted. 18 May 2019
2.NAThe correction have been made as per the instruction received 18 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSUNIL RAOSAHEB DESHMUKH
DesignationGeneral Manager (Environment)
Name of Company (Applicant Name should not be given here)WONDER CEMENT LIMITED
AddressWonder Cement Ltd., R.K. Nagar, Nimbahera, Chittorgarh (Rajasthan)
Print