1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Integrated Cement Project - Clinker (9.5 to 13 MTPA), Cement (12 MTPA to 16 MTPA), & WHRB (30 to 45 MW) near Villages Sangaria, Borakheri, Peerkhera and Rasulpura, Tehsil Nimbahera, Distr | (b)Name of the Company / Organisation | WONDER CEMENT LIMITED | (c)Registered Address | 17 Old FatehPura, Near Seva Mandir,UDAIPUR-313001,
Rajasthan,
India,,chittorgarh,Daman and Diu-31304 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | SUNIL RAOSAHEB DESHMUKH | (b)Designation (Owner/ Partner/ CEO) | General Manager (Environment) | (c)Address | Wonder Cement Ltd.,
Corporate Office- 17, Old Fatehpura, Near Seva Mandir -Udaipur-313001 (Rajasthan),,,Udaipur,Daman and Diu-312601 | (d)Pin code | 312601 | (e)E-mail | wcl.environment@wondercement.com | (f)STD Code. | 294(f)Telephone No. | 2777777 | (g)Fax No. | 02942777140 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/IND/26626/2015 | (d)Master Proposal Number(Single Window) | SW/102845/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra map is enclosed as Annexure-I in additional | (b)Pincode | 321601 | (c)Bounded Latitudes (North) | | From | | Degree | 243912.47 | Minutes | | Second | | From | | Degree | 244014.8 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 743743.26 | Minutes | | Second | | From | | Degree | 743848.56 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45 L/9 & L/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 445 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Bellary | Sandur | Ittanahalli / Taranagar | (2.) | Rajasthan | chittorgarh | Nimbahera | | (3.) | Rajasthan | chittorgarh | Nimbahera | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/298/2012-IA(I) | (c)Date of Issue of TOR | 28 Apr 2015 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 30 Nov 2015 | (c)Date of Issue of EC | 17 Mar 2016 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| At public Place (Near Surpur Balaji Temple) Village Rasulpura, District Chittorgarh, Rajasthan | State : | Rajasthan | District : | chittorgarh | Tehsil : | Nimbahera | Village : | Rasulpura |
| 263 | Employment for local, CSR activities | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/ENV/R/Mine-517/872/2014/609 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 7 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | cement | 12 | 4 | 16 | Others | Million TPA | Road,Rail | | (2.) | Clinker | 9.5 | 3.5 | 13 | Others | Milion TPA | Road,Rail,Conveyor Belt | | (3.) | WHRB | 30 | 15 | 45 | Mega Watt(MW) | | Others | Through HT Power Cable | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Klin | 3 nos. x 8000 TPD | 1 no. x 8000 TPD | 4 nos. x 8000 TPD | Existing Line-I: 8000 TPD, Line-II: 8000 TPD & Line-III: 8000 TPD | (2.) | Cooler | 3 nos. x 8000 TPD | 1 no. x 8000 TPD | 4 nos. x 8000 TPD | Existing Line-I: 8000 TPD, Line-II: 8000 TPD & Line-III: 8000 TPD | (3.) | Raw Mill | 2 nos. x 605 TPH & 2 nos. x 315 TPH | 2 nos. x 315 TPH | 2 nos. x 605 TPH & 4 nos. x 315 TPH | Existing Line-I: 605 TPH, Line-II: 605 TPA & Line-III: 2 Nos. x 315 TPH | (4.) | Coal Mill | 1 nos. x 35 TPH & 2 nos. x 40 TPH | 1 no. x 40 TPH | 1 no. x 35 TPH & 3 nos. x 40 TPH | Existing Line-I: 35 TPH, Line-II: 40 TPH & Line-III: 40 TPH | (5.) | Cement mill | 2 nos X 250 TPH, 2 nos X 265 TPH | 2 nos X 265 TPH | 2 nos X 250 TPH, 4 nos X 265 TPH | Existing Line-I: 2 nos. X 250 TPH, Line-II: 2 nos. x 265 TPH & Line-III: Nil | (6.) | Packing Plant | 8 nos X 240 TPH | 4 nos X 240 TPH | 12 nos X 240 TPH | Existing Line-I: 4 nos. x 240 TPH, Line-II: 4 nos. x 240 TPH & Line-III: Nil | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 23 Oct 2018 | (iv)Valid Upto | 31 Aug 2023 | (v)File No. | F(CPM)/Chittogragh(Nimbahera)/6(1)/2013-2014/4598- | (vi)Application No. | Order.no. 2016-2017/CPM/4768 (Line I) & 2018-2019 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1500 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 150 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.75 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0.179 | (b)Existing quantity of raw material/fuel | 0.499 | (c)Total quantity of raw material/fuel | 0.6779999999999999 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Limestone | 19.1 | Others | Million TPA | Local | Road,Conveyor Belt | | 0.8 | Captive | | Copy of Linkage | (2.) | Petcoke | 1.41 | Others | Million TPA | Local | Road,Rail | | 562 | MoU | | Copy of Linkage | (3.) | Coal | 2.868 | Others | Million TPA | Local | Road,Rail | | 900 | Fuel Supply Agreement | | Copy of Linkage | (4.) | Fly ash | 3.062 | Others | Million TPA | Local | Road | | 200 | MoU | | Copy of Linkage | (5.) | GYPSUM | 0.972 | Others | Million TPA | Local | Road | | 500 | MoU | | Copy of Linkage | (6.) | Red Ochre/Iron Ore | 1.64 | Others | Million TPA | Local | Road | | 30 | Others | PO copy | Copy of Linkage | (7.) | LATERITE | 0.678 | Others | Million TPA | Local | Road | | 80 | Others | PO copy | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 74.7 | 32.2 | 69.8 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 39.2 | 10.7 | 34.6 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 32.7 | 11.2 | 29.9 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 21.3 | 8.0 | 20.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | Aluminium as Al | mg/l | | 2.37 | 0.14 | 0.03 | 0.2 | (2.) | TSS | | | mg/l | | 1 | 1 | 0 | 0 | (3.) | pH | | | NA | | 7.51 | 7.47 | 6.5 | 8.5 | (4.) | TDS | | | mg/l | | 2408.3 | 533.9 | 500 | 2000 | (5.) | Total Hardness | | | mg/l | | 1080 | 335 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 889.6 | 42.54 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 1.1 | 0.4 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.51 | 7.47 | D | (2.) | DO | | mg/l | | 5.8 | 5.5 | D | (3.) | BOD | | mg/l | | 3 | 3 | D | (4.) | COD | | mg/l | | 5 | 5 | D | |
14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 56.7 | 42.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.7 | 45.6 | 75 | |
14.5. No. of Soil Sample Monitored locations : 12 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.19 | 6.95 | (2.) | P(Phosphorus) | Kilogram per hectare | | 330.12 | 92.8 | (3.) | K(Potassium) | Kilogram per hectare | | 612.43 | 266.57 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 408 | 116.8 | (5.) | N(Nitrogen) | Kilogram per hectare | | 208.09 | 115.3 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 36.4 To 44.1 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 13.4 To 8.7 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA-21-4(212)/WR/CGWA/2007-1570 | (f)Date of Issue | 09 Oct 2015 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 845 | 0.1 | Copy of Permission Letter | Pipeline | | Tube Well | | Ref: no. 21-4(212)/WR/CGWA/2007-1570 | 09 Oct 2015 | 2470 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Cement/CPP/WHRB | 135 | 480 | ETP | Reuse within the Plant & Recycling | | 135 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 135 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 135 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sludge | Industrial Waste | | 3300 | Kilolitre | 0.01 | Others | pipeline | Others | Horticulture | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 39.2 | 1.5 | 0 | 39.21 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 74.7 | 1.5 | 0.77 | 75.471 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 21.3 | 1.5 | 0.07 | 21.371 | 80 | (4.) | NOx | | Microgram per Meter Cube | 32.7 | 1.5 | 0.90 | 33.61 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Kiln Raw Mill | Coal | 165 | 6.1 | PM10 | | 35.4 kg/hr | (2.) | kiln Raw Mill | Coal | 165 | 6.1 | NOx | | 188.9 kg/hr | (3.) | Coal Mill | - | 78 | 2.8 | PM10 | | 6.95 kg.hr | (4.) | Cooler | - | 58.6 | 5.2 | PM10 | | 20.2 kg/hr | (5.) | Raw Raw Mill | Coal | 165 | 6.1 | SO2 | | 15.51 kg/hr | (6.) | Cement Mill | - | 55 | 1.2 | PM10 | | 2.9 kg/hr | (7.) | LS Crusher | - | 31 | 1.5 | PM10 | | 4.71 kg/hr | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 15760 | (b)Source | Captive thermal power plant -70 MW, WHRB -45 MW,Ca | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2 MW | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 163.57 | (c)Government Land (ha.) | 27.494 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 191.064 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22054.5 | (b)Waste/Barren Land (ha.) | 6446.7 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2714.4 | (e)Settlements (ha.) | 2073.5 | (f)Industrial (ha.) | 1470.3 | (g)Forest (ha.) | 2940.6 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : nill | 0 | Total (ha.) | 37700.00000000001 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 68.984 | for proposed plant: 8.0 ha | (2.) | Township | | 17.6298 | | (3.) | Green belt | | 71.197 | | (4.) | Others | Open area | 11.5064 | Open area for further use | (5.) | Built Up Area | | 21.7468 | CPP,WHRB & ROAD | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | Nil | (2.) | NPA | Nil | 0 | Nil | (3.) | Wildlife Corridors | Nil | 0 | Nil | (4.) | Critically Polluted Area | Nil | 0 | Nil | (5.) | ESAs | Nil | 0 | Nil | (6.) | ESZs | Nil | 0 | Nil | (7.) | Corridors | Nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Alsigarh PF | 6.0 | NW | (2.) | Defence Installations | | Nil | 0 | Nil | (3.) | Archaeological Sites | | Nil | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 191.064 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock, Leopard and Indian Wolf | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 140 | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | CWW letter 5521 | (iii)Date of issue | 06 Sep 2013 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | seasonal Nalla | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Murlia Dam | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 2.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 256 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 256 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 71.197 | 0 | 71.197 | (2.) | Percentage of Total Project Area | 37 | 0 | 37 | (3.) | No. of Plants | 109580 | 0 | 109580 | (4.) | Funds Allocated | 32800000 | 0 | 32800000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The proposed expansion project will provide direct employment to a large number of personnel. This project will also generate indirect employment to a considerable number of families, who will render their services for the employees of the project.
The project will also encourage ancillary industries in the region, which will not only increase the employment potential but also the economic base of the region will be further strengthened. | (2.) | Environmental | The plant will be operated on Zero Discharge Basis. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/19/0957 dated April 16th, 2019 | (ii)Name of the EIA Consultant | Vimta Labs Ltd. | (iii)Address | 142, IDA Phase-2, Cherlapally, Hyderabad -500051 | (iv)Mobile No. | 9000711309 | (v)Landline No. | 0402726414 | (vi)Email Id | env@vimta.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 19 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Valid Ground water drawl permission from CGWA shall be submitted. | 18 May 2019 | 2. | NA | The correction have been made as per the instruction received | 18 May 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | SUNIL RAOSAHEB DESHMUKH | Designation | General Manager (Environment) | Name of Company (Applicant Name should not be given here) | WONDER CEMENT LIMITED | Address | Wonder Cement Ltd., R.K. Nagar, Nimbahera, Chittorgarh (Rajasthan) |
|