Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Manufacturing of Manganese oxide, Manganese dioxide and Various Ferro alloys by Singh Ferro Alloys
(b)Name of the Company / Organisation SINGH FERRO ALLOYS
(c)Registered Address At C/159, MIDC Butibori.,At C/159, MIDC Butibori.,Nagpur,Maharashtra-441122
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjay Singh
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address At C/159, MIDC Butibori.,At C/159, MIDC Butibori.,Hingna,Nagpur,Maharashtra-441122
(d)Pin code 441122
(e)E-mail sanjaysingh070815@gmail.com
(f)STD Code. 712(f)Telephone No. 2293225
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND/29969/2015
(d)Master Proposal Number(Single Window) SW/102607/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. C/156
(b)Pincode 441122
(c)Bounded Latitudes (North)
From
Degree 20.946231
Minutes
Second
From
Degree 20.946297
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.947000
Minutes
Second
From
Degree 78.947164
Minutes
Second
(e)Survey of India Topo Sheet No. 55 L/13, 55K/16, 55P/1, 55O/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 288
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraNagpurHingna
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/170/2015-IA-II(I)
(b)Date of Apply of TOR 10 Aug 2015
(c)Date of Issue of TOR / Standard ToR 24 May 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Feb 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Mar 2018
Distance of Public Hearing Venue from the Proposed Project :2
Manufacturing Association Hall, MIDC, Butibori
State :Maharashtra
District :Nagpur
Tehsil :Hingna
Village :Butibori
80Employment priority should be given to local people. Pollution control measures should be adopted.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Vessel----
(2.)Chimney30 m heightNA
(3.)Furnace for MnO----
(4.)Jaw Crusher--NA
(5.)Cyclone separator--NA
(6.)Ball mill--NA
(7.)Double cone blender1.0 Mt Capacity1 No.
(8.)Bagfilter--1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manganese Oxide1000Tons per AnnumRoad
(2.)Manganese Dioxide1000Tons per AnnumRoad
(3.)Ferro Titanium OR600Tons per AnnumRoad
(4.)Low/medium carbon ferro manganese OR1200Tons per AnnumRoad
(5.)Ferro vanadium250Tons per AnnumRoad
(6.)Ferro molybdenum OR250Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1.50
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.33
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.068
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7098
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7098
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Manganese Ore3640Tons per AnnumManganese Mines of MOILRoad80 OthersContractCopy of Linkage
(2.)Moybdenum Concentrate252Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(3.)Lime powder25Tons per AnnumWani / Local MarketRoad105 Open MarketCopy of Linkage
(4.)Iron Scrap143Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(5.)Titanium Scrap40Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(6.)Rutile/Zirconium50Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(7.)Coal / Charcoal500Tons per AnnumLocal MarketRoad50 Open MarketCopy of Linkage
(8.)Aluminium Scrap205Tons per AnnumLocal MarketRoad50 Open MarketCopy of Linkage
(9.)Aluminium Powder350Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(10.)Titanium Dioxide116Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(11.)Silico Manganese708Tons per AnnumRaipur/Durgapur/HyderabadRoad475 Open MarketCopy of Linkage
(12.)Vanadium Pentoxide (flakes)240Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(13.)Aluminium Shots125Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(14.)Fluorspar95Tons per AnnumMumbai / LocalRoad755 Open MarketCopy of Linkage
(15.)Ilmenite685Tons per AnnumMumbai/OdissaRoad755 Open MarketCopy of Linkage
(16.)Lime Powder/ Flourspar274Tons per AnnumWani / Local MarketRoad105 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2016 To 30 Dec 2016
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube57.631.554.2100
(2.)NOxMicro Gram per Meter Cube25.29.925.080
(3.)PM2.5Micro Gram per Meter Cube32.515.431.560
(4.)SO2Micro Gram per Meter Cube24.57.623.580
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l55100100
(2.)TDSmg/l9983125002000
(3.)Fluoridemg/l0.60.311.5
(4.)Chloridesmg/l16737.52501000
(5.)Total Hardnessmg/l518210200600
(6.)pHNA7.97.18.58.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.35.3B
(2.)pHNA8.07.3A
(3.)CODmg/l10.65.2A
(4.)BODmg/l2.21.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.639.365
(2.)Leq(Night)A-weighted decibels(dB(A))4536.355
    14.5.     No. of Soil Sample Monitored locations : 03
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.57.83
(2.)N(Nitrogen)Kilogram per hectare878.298
(3.)K(Potassium)Kilogram per hectare1482.4137
(4.)Electric ConductivityOthersmmhos/cm0.2920.125
(5.)P(Phosphorus)Kilogram per hectare45.13.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.80 To 15.59
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.60 To 10.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Butibori52.5Copy of Permission LetterPipelineOthersMIDC water supplyMIDC/RO(NGP)/BTR/LMS-990/2600/201309 Apr 20135
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial1.51.5Settling TankReuse within the Plant & Recycling1.5
(2.)Domestic1.52Packaged Type STPGreen Belt Renewal Plant1.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SlagIndustrial Waste970Tons0.05RoadOthersWill be sold to manufacturer of Silico-manganese.
(2.)AshIndustrial Waste100Tons4RoadOthersWill be sold to brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube32.52000.0132.51160
(2.)NOxMicrogram per Meter Cube25.22500.7525.95180
(3.)SO2Microgram per Meter Cube24.52000.3724.87180
(4.)PM10Microgram per Meter Cube57.62000.0157.611100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Furnace & VesselCoal300.5SO20.65
(2.)Furnace & VesselCoal300.5PM100.022
(3.)Furnace & VesselCoal300.5NOx1.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 93
(b)Source State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 0.06
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 0.06
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 0.06
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : 00 00
    Total (ha.) 0.06
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.025Industry Shed
(2.)Green belt0.02Plantation 33% of total land
(3.)OthersOpen Area0.015
Total (ha.) 0.06
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area000000
(2.)WLS000000
(3.)ESZsNone00Nil
(4.)CorridorsNone00Nil
(5.)NPA000000
(6.)Wildlife CorridorsNone00Nil
(7.)ESAsNone00Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDegma RF9.0NW
(2.)Defence InstallationsNone00NA
(3.)Archaeological SitesNone00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.06
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vena River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 10
(e)No. of working days 330
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.02
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 32
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue generation in form of GST, IT and Other Taxes for State and Central Government.
(2.)Social• Employment generation • Development of Infrastructure under CER
(3.)EnvironmentalGreenbelt development.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1720/RA0101
(ii)Name of the EIA Consultant Pollution and Ecology Control Services (PECS)
(iii)Address Near Dhantoli Police Station, Dhantoli Nagpur.
(iv)Mobile No. 9373128182
(v)Landline No. 0712229322
(vi)Email Id pecs_nagpur@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjay Singh
DesignationPartner
Name of Company (Applicant Name should not be given here)SINGH FERRO ALLOYS
AddressAt C/159, MIDC Butibori.
Print