|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Thakurani Iron Ore Mines of M/s. Kaypee Enterprises | (b)Name of the Company / Organisation | MS KAYPEE ENTERPRISES | (c)Registered Address | Post Box No.3, Post - Barbil,District - Keonjhar, Odisha,Kendujhar,Orissa-758035 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rabindra Nath Mondal | (b)Designation (Owner/ Partner/ CEO) | MinesManager | (c)Address | Post Box No.3, Post - Barbil,District - Keonjhar, Odisha,Barbil,Kendujhar,Orissa-758035 | (d)Pin code | 758035 | (e)E-mail | kpe.mines@gmail.com | (f)STD Code. | 6767(f)Telephone No. | 270048 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIN/102001/2018 | (d)Master Proposal Number(Single Window) | SW/101710/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | The lease area lies in Thakurani R.F | (b)Pincode | 758035 | (c)Bounded Latitudes (North) | | From | | Degree | 2445257.29 | Minutes | | Second | | From | | Degree | 2447838.02 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 338347.75 | Minutes | | Second | | From | | Degree | 339198.48 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73G/5, 73F/8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 920 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 6.1 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/902/2007-IA.II(M) | (b)Date of Apply of TOR | 30 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 12 Oct 2018 | (d)Date of Apply of EC | 24 Apr 2009 | (e)Date of Issue of EC | 03 Feb 2012 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Mar 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.5 |
| Dalki Ground, Dalki village of Keonjhar district | State : | Orissa | District : | Kendujhar | Tehsil : | Barbil | Village : | Dalki |
| 600 | Employment to locals,Environmental protection measures,Road concreting | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-426/EPE | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 3 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Iron Ore | 5500000 | 2490000 | 7990000 | Tons per Annum(TPA) | | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Crushing Unit | 300 TPH | 300 TPH | 600 TPH | Existing(300TPHx1),New(100TPHx3) | (2.) | Screening Unit | 1500 TPH | 800TPH | 2300TPH | Existing(300TPHx5),New(300TPHx2,200TPHx1) | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 05 Feb 2016 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 2404/IND-I-CON-2168 | (vi)Application No. | 1103 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 30 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.924 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 12.6795 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.52 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 7 | (b)Existing quantity of raw material/fuel | 15 | (c)Total quantity of raw material/fuel | 22 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 22 | Kilo Litre per Day | | Procured Locally | Road | | 5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 36.8 | 19.6 | 35.5 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 7.9 | 3.0 | 6.7 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 75.5 | 47.1 | 73.9 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 16.9 | 5.9 | 15.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.45 | 0.16 | 1 | 1.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 180 | 60 | 500 | 2000 | (4.) | pH | | | NA | | 7.16 | 6.65 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 171 | 39.4 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 30.8 | 10.3 | 250 | 1000 | (7.) | Heavy Metals | | Iron | mg/l | | 0.16 | 0.07 | 0.3 | 0.3 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 6.50 | 6.50 | C | (2.) | COD | | mg/l | | 4.0 | 4.0 | C | (3.) | DO | | mg/l | | 6.5 | 6.5 | C | (4.) | BOD | | mg/l | | 2.0 | 2.0 | C | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.5 | 44.1 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41 | 38.2 | 45 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 775 | 417 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 0.77 | 0.14 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 25.3 | 2 | (4.) | pH | | | 6.05 | 5.05 | (5.) | Electric Conductivity | Others | µmhos/cm | 312.8 | 21.79 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 7.5 To 8 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.5 To 4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 362 | 0 | Copy of Permission Letter | Pipeline | | Others | Borewell | 21-4(177)/SER/CGWA/2009-482 | 28 Mar 2019 | 362 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshop Effluent | 2 | 5 | Effluent Treatment Plant | Reuse within the Plant & Recycling | | 2 | | (2.) | Domestic waste water | 25 | 60 | Sewage Treatment Plant | Others | Dust suppression, plantation/green belt purposes | 25 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 27 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 27 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used/Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 40 | Kilolitre | 350 | Road | | Authorized Recyclers | | (2.) | Overburden | Others | Overburden | 3274706.38 | Tons | 0 | Road | | Others | Internal road maintenance, dumping, backfilling | (3.) | Discarded containers/liners contaminated wastes | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 250 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Waste/Residue contatining oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3.6 | Tons | 250 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 5.7 | 0 | 0.035 | 5.8 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 36.8 | 0 | 2.0 | 38.9 | 60 | (3.) | NOx | | Microgram per Meter Cube | 14.8 | 0 | 5.0 | 19.9 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 75.5 | 0 | 3 | 78.6 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | HSD | 10 | 0.30 | SO2 | | 75 | (2.) | DG set | HSD | 10 | 0.30 | NOx | | 75 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | DG Sets | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 no’s of DG set (750 KVA, 125 KVA & 100 KVA) | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 228.04 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 228.04 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 228.04 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 228.04 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 117.996 | 10.427-Backfil&Plantation,107.569-Bench Plantation | (2.) | OB Dump Area | | 21.53 | Dump Plantation | (3.) | Safety Zone | | 5.6170 | Greenbelt & Safety zone area | (4.) | Area for Solid Waste Management | | 2.450 | Subgrade stack | (5.) | Others | Road+Unused area+Reclaimed area | 80.447 | Road+Unused area+Reclaimed area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | Nil within 10km radius | (2.) | NPA | Nil | 0 | Nil within 10km radius | (3.) | ESAs | Nil | 0 | Nil within 10km radius | (4.) | Corridors | Nil | 0 | Nil within 10km radius | (5.) | WLS | Nil | 0 | Nil within 10km radius | (6.) | ESZs | Nil | 0 | Nil within 10km radius | (7.) | Wildlife Corridors | Karo Karampada Elephant corridor | 17 | Nil within 10km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Pandrasali P.F | 1.9 | ML area in Thakurani R.F. Noamundi P.F-3.1Km, Uliburu R.F-3.9Km,Kurta P.F-4.2Km, Nuia P.F-4.3Km,Tatiba P.F-5.1Km Sidhamath R.F-6.2Km, etc. also lie in 10km Buffer zone | (2.) | Archaeological Sites | | Nil | 0 | Nil within 10km radius | (3.) | Defence Installations | | Nil | 0 | Nil within 10km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Final(Stage-II) Approval Obtained | (i)MoEFCC file number | FP/OR/MIN/396/1997 | (ii)Date of final approval | 21 Jul 2005 | (iii)Date of In-Principle Approval | 21 Jul 2005 | (iv)Area diverted | 146.726 | (v)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | No land acquisition | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Elephant and Monitor Lizard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Rs.143.00 lakhs | (iii)Period of Implementation | 2010-2020 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | Memo No. 1254 / 1WL-C-FC-571/09 | (iii)Date of issue | 15 Feb 2010 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Baitara Nala. Also, Mahadeba Nala-5.8Km,Karo River-6.1Km, Kundra Nala-6.5Km,Litimur Nadi-7.0Km,Barnal Jor-9.3Km lie in 10km radius | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 5.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 35 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 330 | (f)Total Manpower | 135 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.74 | 3.877 | 5.617 | (2.) | Percentage of Total Project Area | 0.76 | 1.7 | 2.46 | (3.) | No. of Plants | 3480 | 7754 | 11234 | (4.) | Funds Allocated | 250000 | 581550 | 831550 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Iron | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 7.99 MTPA expansion | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MSM/FM/10-ORI/BHU/2018-19 | (b)Date of Approval | 04 Jun 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Regional Controller of Mines | (e)Approved Mining Lease Area | 228.04 | (f)Approved Capacity | 7.99 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 97.15 | (b)Mineable Reserves (Million Ton) | 88.406 | (c)Extractable Reserves(Million Ton) | 88.406 | (d)Percent(%) of Extraction | 90.99 | (e)Grade of Coal /Ore /Mineral | 59.39 | (f)Stripping Ratio | 1 : 0.078 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 37 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 12 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 3 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 100 | - | (2.) | 2 | 100 | - | (3.) | 3 | 100 | - | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 228.04 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Initial lease is from 1953 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 228.04 | (iii)Validity of the lease deed | From : 01 Jan 1953 To : 31 Dec 1982 | (iv)Date of Execution of Mining Lese | 01 Jan 1953 | (v)Reference Number | Doc/No1511 for 1961 | (d)Whether Lease Deed Renewed ? | Yes | |
|
8.1. Earlier Renewals: |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
(1.) | Transfer | 22 Feb 1986 | From : 22 Feb 1986 To : 31 Dec 2002 | Copy of Earlier Lease | 794/I-18 | 228.04 | Transfer in favor of Kaypee Enterprises | (2.) | Renewal | 20 Aug 2001 | From : 01 Jan 2003 To : 31 Dec 2022 | Copy of Earlier Lease | 2457 | 228.04 | Renewal applied on 20.08.2001 | (3.) | Transfer | 07 May 2015 | From : 01 Jan 2003 To : 31 Mar 2020 | Copy of Earlier Lease | 1031500238 | 228.04 | Supplementary lease deed | (4.) | Initial | 01 Jan 1900 | From : 01 Jan 1953 To : 31 Dec 1982 | Copy of Earlier Lease | Doc/No1511 for 1961 | 228.04 | Mining lease in favor of M D.Serajuddin | (5.) | Renewal | 20 Dec 1985 | From : 01 Jan 1983 To : 31 Dec 2002 | Copy of Earlier Lease | 3521/3522 | 228.04 | Renewal of ML of MD. Mazharul Haque and Ekramul Haque | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 5 | (ii)Total Area (in Hectare) | 21.53 | (iii)Height (in meter) | 30 | (iv)Quantity (in Million Cubic meter) | 8.1871 | (v)No. of year back fill up | 10 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 3 | (ii)Total Area (in Hectare) | 10.427 | (iii)Height (in meter) | 25 | (iv)Quantity (in Million Cubic meter) | 2.354 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 0 | (b)Depth (in meter) | 0 | (c)Volume (in Million Cubic meter) | 0 | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 117.996 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | By road | (b)Surface to Siding/Loading | By road | (c)Transportation / Conveyor Details | Tippers | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 228.04 | 0 | 228.04 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | AGRICULTURE LAND | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 228.04 | 0 | 228.04 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 21.53 | 0 | 0 | | 21.53 | (3.) | GREEN BELT | | 5.617 | 0 | 0 | | 5.617 | (4.) | Other | Mineral storage area+undisturbed | 78.147 | 0 | 0 | | 78.147 | (5.) | INTERNAL OB DUMPS | | 10.427 | 0 | 0 | | 10.427 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (7.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (8.) | EXCAVATION/QUARRY | | 107.569 | 0 | 0 | | 107.569 | (9.) | ROADS | | 0 | 0 | 4.75 | | 4.75 | |
TOTAL | 223.29 | 0 | 4.75 | 0 | 228.04 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 21.53 | (b)Internal Dump(in hectare) | 10.427 | (c)Quarry(in hectare) | 107.569 | (d)Safety Zone(in hectare) | 5.617 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 2.45 | (h)Total afforestation plant (in hectare) | 147.593 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 20182019 | 5.50 | 5.50 | 5.50 | 5.499 | 0 | (2.) | 20152016 | 5.50 | 5.50 | 5.50 | 2.994 | 0 | (3.) | 20052006 | 1 | 1.50 | 1 | 1.694 | 0.694 | (4.) | 20032004 | 0.058 | 0.24 | 0.058 | 1.427 | 1.369 | (5.) | 20042005 | 0.058 | 1.50 | 0.058 | 0.861 | 0.802 | (6.) | 20062007 | 2 | 2 | 2 | 1.823 | 0 | (7.) | 20172018 | 5.50 | 5.50 | 5.50 | 5.499 | 0 | (8.) | 20162017 | 5.50 | 5.50 | 5.50 | 5.481 | 0 | (9.) | 20142015 | 5.50 | 5.50 | 5.50 | 0.158 | 0 | (10.) | 20132014 | 5.50 | 5.50 | 5.50 | 0.0002 | 0 | (11.) | 20122013 | 5.50 | 5.50 | 5.50 | 0.103 | 0 | (12.) | 20112012 | 5.50 | 5.50 | 5.50 | 1.260 | 0 | (13.) | 20102011 | 2 | 2 | 2 | 1.992 | 0 | (14.) | 20092010 | 2 | 2 | 2 | 1.897 | 0 | (15.) | 20082009 | 2 | 2 | 2 | 1.915 | 0 | (16.) | 20072008 | 2 | 2 | 2 | 1.768 | 0 | (17.) | 20022003 | 0.058 | 0.24 | 0.058 | 0.789 | 0.731 | (18.) | 20012002 | 0.058 | 0.24 | 0.058 | 0.460 | 0.402 | (19.) | 20002001 | 0.058 | 0.24 | 0.058 | 0.345 | 0.287 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Districts Courts | (c)Name of the Sub Court | JMFC Court, Barbil, Odisha | (d)Case No. | 1100 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | Sub-judice | (f)Case Details | Past excess production | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/17/0423 | (ii)Name of the EIA Consultant | Creative Engineers & Consultants | (iii)Address | 9B/4, Bharathwajar Street, East Tambaram, Chennai-600059. | (iv)Mobile No. | 9444133619 | (v)Landline No. | 0442239517 | (vi)Email Id | cecgiri@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 24 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP requested to submit the following:
1. Court case; What is status of court case?
3. Wildlife clearance mentioned in earlier EC letter.
4. Forest Clearance Status | 15 Jul 2019 | 2. | NA | The correction have been made as per the instruction received | 17 Jul 2019 | 3. | NA | you are requested to submit the following:
After scrutiny of the application, it is observed that TOR for this expansion proposal was granted vide file number J-11015/104/2018- IA.II (M) dated 12 October 2018. However, you are submitted your EC application on your earlier file number J-11015/902/2007-IA.II(M). In view of the above, you are requested to submit an EC application along with all necessary documents in the file number of J-11015/104/2018- IA.II (M). | 08 Aug 2019 | 4. | NA | you are requested to submit the following:
After scrutiny of the application, it is observed that TOR for this expansion proposal was granted vide file number J-11015/104/2018- IA.II (M) dated 12 October 2018. However, you are submitted your EC application on your earlier file number J-11015/902/2007-IA.II(M). In view of the above, you are requested to submit an EC application along with all necessary documents in the file number of J-11015/104/2018- IA.II (M). | 08 Aug 2019 | 5. | NA | The correction have been made as per the instruction received | 09 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Rabindra Nath Mondal | Designation | MinesManager | Name of Company (Applicant Name should not be given here) | MS KAYPEE ENTERPRISES | Address | Post Box No.3, Post - Barbil |
|