Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Thakurani Iron Ore Mines of M/s. Kaypee Enterprises
(b)Name of the Company / Organisation MS KAYPEE ENTERPRISES
(c)Registered Address Post Box No.3, Post - Barbil,District - Keonjhar, Odisha,Kendujhar,Orissa-758035
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rabindra Nath Mondal
(b)Designation (Owner/ Partner/ CEO) MinesManager
(c)Address Post Box No.3, Post - Barbil,District - Keonjhar, Odisha,Barbil,Kendujhar,Orissa-758035
(d)Pin code 758035
(e)E-mail kpe.mines@gmail.com
(f)STD Code. 6767(f)Telephone No. 270048
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIN/102001/2018
(d)Master Proposal Number(Single Window) SW/101710/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. The lease area lies in Thakurani R.F
(b)Pincode 758035
(c)Bounded Latitudes (North)
From
Degree 2445257.29
Minutes
Second
From
Degree 2447838.02
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 338347.75
Minutes
Second
From
Degree 339198.48
Minutes
Second
(e)Survey of India Topo Sheet No. 73G/5, 73F/8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 920
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.1
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/902/2007-IA.II(M)
(b)Date of Apply of TOR 30 Jul 2018
(c)Date of Issue of TOR / Standard ToR 12 Oct 2018
(d)Date of Apply of EC 24 Apr 2009
(e)Date of Issue of EC 03 Feb 2012
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :1.5
Dalki Ground, Dalki village of Keonjhar district
State :Orissa
District :Kendujhar
Tehsil :Barbil
Village :Dalki
600Employment to locals,Environmental protection measures,Road concretingOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-426/EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 3 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Iron Ore550000024900007990000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Crushing Unit300 TPH300 TPH600 TPHExisting(300TPHx1),New(100TPHx3)
(2.)Screening Unit1500 TPH800TPH2300TPHExisting(300TPHx5),New(300TPHx2,200TPHx1)
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 05 Feb 2016
(iv)Valid Upto 31 Mar 2020
(v)File No. 2404/IND-I-CON-2168
(vi)Application No. 1103
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 30
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.924
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 12.6795
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.52
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7
(b)Existing quantity of raw material/fuel 15
(c)Total quantity of raw material/fuel 22
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD22Kilo Litre per DayProcured LocallyRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube36.819.635.560
(2.)SO2Micro Gram per Meter Cube7.93.06.780
(3.)PM10Micro Gram per Meter Cube75.547.173.9100
(4.)NOxMicro Gram per Meter Cube16.95.915.780
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.450.1611.5
(2.)TSSmg/l0000
(3.)TDSmg/l180605002000
(4.)pHNA7.166.656.58.5
(5.)Total Hardnessmg/l17139.4200600
(6.)Chloridesmg/l30.810.32501000
(7.)Heavy MetalsIronmg/l0.160.070.30.3
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA6.506.50C
(2.)CODmg/l4.04.0C
(3.)DOmg/l6.56.5C
(4.)BODmg/l2.02.0C
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.544.155
(2.)Leq(Night)A-weighted decibels(dB(A))4138.245
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram775417
(2.)P(Phosphorus)Milligram per Kilogram0.770.14
(3.)N(Nitrogen)Milligram per Kilogram25.32
(4.)pH6.055.05
(5.)Electric ConductivityOthersµmhos/cm312.821.79
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 7.5 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.5 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3620Copy of Permission LetterPipelineOthersBorewell21-4(177)/SER/CGWA/2009-48228 Mar 2019362
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop Effluent25Effluent Treatment PlantReuse within the Plant & Recycling2
(2.)Domestic waste water2560Sewage Treatment PlantOthersDust suppression, plantation/green belt purposes250
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 27
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 27
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used/Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)40Kilolitre350RoadAuthorized Recyclers
(2.)OverburdenOthersOverburden3274706.38Tons0RoadOthersInternal road maintenance, dumping, backfilling
(3.)Discarded containers/liners contaminated wastesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Waste/Residue contatining oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.6Tons250RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube5.700.0355.880
(2.)PM2.5Microgram per Meter Cube36.802.038.960
(3.)NOxMicrogram per Meter Cube14.805.019.980
(4.)PM10Microgram per Meter Cube75.50378.6100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD100.30SO275
(2.)DG setHSD100.30NOx75
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 no’s of DG set (750 KVA, 125 KVA & 100 KVA)
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 228.04
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 228.04
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 228.04
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 228.04
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area117.99610.427-Backfil&Plantation,107.569-Bench Plantation
(2.)OB Dump Area21.53Dump Plantation
(3.)Safety Zone5.6170Greenbelt & Safety zone area
(4.)Area for Solid Waste Management2.450Subgrade stack
(5.)OthersRoad+Unused area+Reclaimed area80.447Road+Unused area+Reclaimed area
Total (ha.) 228.04
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil within 10km radius
(2.)NPANil0Nil within 10km radius
(3.)ESAsNil0Nil within 10km radius
(4.)CorridorsNil0Nil within 10km radius
(5.)WLSNil0Nil within 10km radius
(6.)ESZsNil0Nil within 10km radius
(7.)Wildlife CorridorsKaro Karampada Elephant corridor17Nil within 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPandrasali P.F1.9ML area in Thakurani R.F. Noamundi P.F-3.1Km, Uliburu R.F-3.9Km,Kurta P.F-4.2Km, Nuia P.F-4.3Km,Tatiba P.F-5.1Km Sidhamath R.F-6.2Km, etc. also lie in 10km Buffer zone
(2.)Archaeological SitesNil0Nil within 10km radius
(3.)Defence InstallationsNil0Nil within 10km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Final(Stage-II) Approval Obtained
(i)MoEFCC file number FP/OR/MIN/396/1997
(ii)Date of final approval 21 Jul 2005
(iii)Date of In-Principle Approval 21 Jul 2005
(iv)Area diverted 146.726
(v)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired No land acquisition
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant and Monitor Lizard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs.143.00 lakhs
(iii)Period of Implementation 2010-2020
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. Memo No. 1254 / 1WL-C-FC-571/09
(iii)Date of issue 15 Feb 2010
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Baitara Nala. Also, Mahadeba Nala-5.8Km,Karo River-6.1Km, Kundra Nala-6.5Km,Litimur Nadi-7.0Km,Barnal Jor-9.3Km lie in 10km radius
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 330
(f)Total Manpower 135
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.743.8775.617
(2.)Percentage of Total Project Area0.761.72.46
(3.)No. of Plants3480775411234
(4.)Funds Allocated250000581550831550
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)IronMajor
2.
Mine Capacity in ROM (Run of Mine) 7.99 MTPA expansion
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MSM/FM/10-ORI/BHU/2018-19
(b)Date of Approval 04 Jun 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Regional Controller of Mines
(e)Approved Mining Lease Area 228.04
(f)Approved Capacity 7.99
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 97.15
(b)Mineable Reserves (Million Ton) 88.406
(c)Extractable Reserves(Million Ton) 88.406
(d)Percent(%) of Extraction 90.99
(e)Grade of Coal /Ore /Mineral 59.39
(f)Stripping Ratio 1 : 0.078
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 37
(i)Mining Method Opencast
(j)Life of Mine (Years) 12
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 3
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1100 -
(2.)2100 -
(3.)3100 -
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 228.04
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Initial lease is from 1953
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 228.04
(iii)Validity of the lease deed From : 01 Jan 1953 To : 31 Dec 1982
(iv)Date of Execution of Mining Lese 01 Jan 1953
(v)Reference Number Doc/No1511 for 1961
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Transfer 22 Feb 1986 From : 22 Feb 1986 To : 31 Dec 2002 Copy of Earlier Lease794/I-18 228.04 Transfer in favor of Kaypee Enterprises
(2.)Renewal 20 Aug 2001 From : 01 Jan 2003 To : 31 Dec 2022 Copy of Earlier Lease2457 228.04 Renewal applied on 20.08.2001
(3.)Transfer 07 May 2015 From : 01 Jan 2003 To : 31 Mar 2020 Copy of Earlier Lease1031500238 228.04 Supplementary lease deed
(4.)Initial 01 Jan 1900 From : 01 Jan 1953 To : 31 Dec 1982 Copy of Earlier LeaseDoc/No1511 for 1961 228.04 Mining lease in favor of M D.Serajuddin
(5.)Renewal 20 Dec 1985 From : 01 Jan 1983 To : 31 Dec 2002 Copy of Earlier Lease3521/3522 228.04 Renewal of ML of MD. Mazharul Haque and Ekramul Haque
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 5
(ii)Total Area (in Hectare) 21.53
(iii)Height (in meter) 30
(iv)Quantity (in Million Cubic meter) 8.1871
(v)No. of year back fill up 10
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 3
(ii)Total Area (in Hectare) 10.427
(iii)Height (in meter) 25
(iv)Quantity (in Million Cubic meter) 2.354
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 117.996
13.
Details of Transportation:
(a)In Pit/Underground to Surface By road
(b)Surface to Siding/Loading By road
(c)Transportation / Conveyor Details Tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND228.040228.04
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)AGRICULTURE LAND000
(5.)SURFACE WATER BODIES000
(6.)SETTLEMENTS000
TOTAL228.040228.04
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)EXTERNAL OB DUMPS21.530021.53
(3.)GREEN BELT5.617005.617
(4.)OtherMineral storage area+undisturbed78.1470078.147
(5.)INTERNAL OB DUMPS10.4270010.427
(6.)BUILT UP AREA (COLONY/OFFICE)0000
(7.)VIRGIN AREA0000
(8.)EXCAVATION/QUARRY107.56900107.569
(9.)ROADS004.754.75
TOTAL223.2904.750228.04
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 21.53
(b)Internal Dump(in hectare) 10.427
(c)Quarry(in hectare) 107.569
(d)Safety Zone(in hectare) 5.617
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 2.45
(h)Total afforestation plant (in hectare) 147.593
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 117.996
Total Area Backfilled after Excavation (in hectare) 10.427
Total Area Reclaimed (in hectare) 117.996
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)201820195.505.505.505.4990
(2.)201520165.505.505.502.9940
(3.)2005200611.5011.6940.694
(4.)200320040.0580.240.0581.4271.369
(5.)200420050.0581.500.0580.8610.802
(6.)200620072221.8230
(7.)201720185.505.505.505.4990
(8.)201620175.505.505.505.4810
(9.)201420155.505.505.500.1580
(10.)201320145.505.505.500.00020
(11.)201220135.505.505.500.1030
(12.)201120125.505.505.501.2600
(13.)201020112221.9920
(14.)200920102221.8970
(15.)200820092221.9150
(16.)200720082221.7680
(17.)200220030.0580.240.0580.7890.731
(18.)200120020.0580.240.0580.4600.402
(19.)200020010.0580.240.0580.3450.287
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court JMFC Court, Barbil, Odisha
(d)Case No. 1100
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Sub-judice
(f)Case Details Past excess production
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/17/0423
(ii)Name of the EIA Consultant Creative Engineers & Consultants
(iii)Address 9B/4, Bharathwajar Street, East Tambaram, Chennai-600059.
(iv)Mobile No. 9444133619
(v)Landline No. 0442239517
(vi)Email Id cecgiri@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 24 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP requested to submit the following: 1. Court case; What is status of court case? 3. Wildlife clearance mentioned in earlier EC letter. 4. Forest Clearance Status 15 Jul 2019
2.NAThe correction have been made as per the instruction received 17 Jul 2019
3.NAyou are requested to submit the following: After scrutiny of the application, it is observed that TOR for this expansion proposal was granted vide file number J-11015/104/2018- IA.II (M) dated 12 October 2018. However, you are submitted your EC application on your earlier file number J-11015/902/2007-IA.II(M). In view of the above, you are requested to submit an EC application along with all necessary documents in the file number of J-11015/104/2018- IA.II (M). 08 Aug 2019
4.NAyou are requested to submit the following: After scrutiny of the application, it is observed that TOR for this expansion proposal was granted vide file number J-11015/104/2018- IA.II (M) dated 12 October 2018. However, you are submitted your EC application on your earlier file number J-11015/902/2007-IA.II(M). In view of the above, you are requested to submit an EC application along with all necessary documents in the file number of J-11015/104/2018- IA.II (M). 08 Aug 2019
5.NAThe correction have been made as per the instruction received 09 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRabindra Nath Mondal
DesignationMinesManager
Name of Company (Applicant Name should not be given here)MS KAYPEE ENTERPRISES
AddressPost Box No.3, Post - Barbil
Print