Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Sarda Energy & Minerals Ltd.
(b)Name of the Company / Organisation SARDA ENERGY AND MINERALS LIMITED
(c)Registered Address Vanijya Bhawan, Jail Road,,Devendra Nagar Square, Raipur,Raipur,Chhattisgarh-492001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant P S Dutta Gupta
(b)Designation (Owner/ Partner/ CEO) Head - Corporate Affairs
(c)Address M/s Sarda Energy & Minerals Limited 1st Floor, Vanijya Bhawan,,Jail Road, Devendra Nagar Square, Raipur (C.G.).,Raipur,Raipur,Chhattisgarh-492001
(d)Pin code 492001
(e)E-mail pduttagupta@seml.co.in
(f)STD Code. 771(f)Telephone No. 2214210
(g)Fax No. 2214213
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
5(k) Induction/arc furnaces/cupola furnaces 5TPH or more
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/CG/IND/101936/2017
(d)Master Proposal Number(Single Window) SW/101909/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. P. H No. - 97 Khasra No. - 665/1, 665/26, 665/28,
(b)Pincode 493111
(c)Bounded Latitudes (North)
From
Degree 21.336867
Minutes
Second
From
Degree 21.361063
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.682814
Minutes
Second
From
Degree 81.700347
Minutes
Second
(e)Survey of India Topo Sheet No. 64G/11, 64G/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 282
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 8.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/45/2012-IA.II(I)
(b)Date of Apply of TOR 27 Nov 2017
(c)Date of Issue of TOR / Standard ToR 18 Sep 2018
(d)Date of Apply of EC 04 Jun 2016
(e)Date of Issue of EC 28 Oct 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :10 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Public hall, Kundrapar
State :Chhattisgarh
District :Raipur
Tehsil :Raipur
Village :Mandhar
200Mostly questions are related to Employment, to ensure PP to give preference to local people.District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-295/RON/2017-NGP/3778
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 14 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coke Oven00540000540000Tons per Annum(TPA)Road,Conveyor Belt
(2.)WHRB Power Plant waste heat from Sponge Iron Kiln004040Mega Watt(MW)OthersTransmission Line/Power Cable
(3.)Iron Ore Pellet Plant60000014000002000000Tons per Annum(TPA)Road,Rail,Conveyor Belt
(4.)Coal Gasifiers Plant270465409281138OthersNm3/hrOthersPipeline
(5.)Iron Ore Grinding & Beneficiation Plant70000023000003000000Tons per Annum(TPA)Road,Conveyor Belt
(6.)Sinter Plant00650000650000Tons per Annum(TPA)Road,Conveyor Belt
(7.)CCM- Cast Billets0011650001165000Tons per Annum(TPA)Road,Conveyor Belt
(8.)Rolling Mill0010000001000000Tons per Annum(TPA)Road,Rail
(9.)Thermal Power Plant00150150Mega Watt(MW)OthersTransmission Line/Power Cable
(10.)Ductile pipe with induction furnace00400000400000Tons per Annum(TPA)Road,Rail
(11.)Blast Furnace0012000001200000Tons per Annum(TPA)Road,Conveyor Belt
(12.)Oxygen Plant00300300OthersTonnes Per DayOthersTank/Pipeline
(13.)Sponge Iron Plant00600000600000Tons per Annum(TPA)Road,Conveyor Belt
(14.)Electric Arc Furnace0012000001200000Tons per Annum(TPA)Road,Conveyor Belt
(15.)WHRB Power Plant07070Mega Watt(MW)OthersTransmission Line/Power Cable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal Gasifier Plant (20 Nos)-54092 Nm3/Hr-
(2.)Iron ore pellet plant with coal gasifier plant600000200000800000The enhancement will be achieved without changing any plant and machinery
(3.)Iron Ore Grinding & Beneficiation Plant--2000000 TPA2000000 TPA--
(4.)Iron Ore Pellet Plant--1200000 TPA1200000 TPA--
(5.)Coke Oven-540000 TPA540000 TPA--
(6.)Blast Furnace--1200000 TPA1200000 TPA--
(7.)Electric Arc Furnace--1200000 TPA1200000 TPA--
(8.)CCM-Cast Billets--1165000 TPA1165000 TPA--
(9.)WHRB Power Plant Waste Heat from Sponge Iron Plant--40 MW40 MW--
(10.)Sponge Iron Plant--600000 TPA600000 TPA--
(11.)Oxygen Plant--300 TPA300 TPA--
(12.)Iron Ore Grinding & Beneficiation700000 TPA300000 TPA1000000 TPAEixsting Iron ore grinding Unit being upgraded to iron ore Grinding & Beneficiation
(13.)Sinter Plant--650000 TPA650000 TPA--
(14.)Rolling Mill--1000000 TPA1000000 TPA--
(15.)THermal Power Plant--150 MW150 MW--
(16.)Ductile Pipe with Induction Furnace--400000 TPA400000 TPA--
(17.)WHRB PP based on Coke Oven & BF Gases--70 MW70 MW--
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Dec 2019
(iv)Valid Upto 30 Sep 2022
(v)File No. 8338 /TS/CECB/2019
(vi)Application No. 3944355
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4674.74
(b) Funds Allocated for Environment Management (Capital) (in Crores) 194.033
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 23.38
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 19.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 15742420
(b)Existing quantity of raw material/fuel 1000000
(c)Total quantity of raw material/fuel 16742420
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron Ore fines3617500Tons per AnnumE-auction/Captive Coal Mines/Private minersRoad,Rail160 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 30 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube90.841.690.3100
(2.)PM2.5Micro Gram per Meter Cube46.724.844.360
(3.)SO2Micro Gram per Meter Cube38.111.334.180
(4.)NOxMicro Gram per Meter Cube44.719.242.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l42021900200
(2.)Chloridesmg/l187.842.500250
(3.)Fluoridemg/l0.70.3001.0
(4.)TSSmg/l550000
(5.)TDSmg/l75242800500
(6.)pHNA7.77.16.58.5
    14.3.     No. of Surface Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.01.0A
(2.)CODmg/l8.94A
(3.)DOmg/l6.45.4B
(4.)pHNA7.97.1A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.9738.7970
(2.)Leq(Day)A-weighted decibels(dB(A))55.9545.1675
    14.5.     No. of Soil Sample Monitored locations : 03
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.286.80
(2.)N(Nitrogen)Kilogram per hectare294105
(3.)P(Phosphorus)Kilogram per hectare28.27.6
(4.)K(Potassium)Kilogram per hectare190.448.2
(5.)Electric ConductivityOthersmmhos/cm0.3580.256
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.5 To 5.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.8 To 7.2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface473658.0 Not Appliacble PipelineOthersPumpingL57682603 Jul 201945757
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestc4350STP (MBBR)Green Belt Renewal Plant43
(2.)Industrial Waste21882188Neutralization Pit and ETPReuse within the Plant & Recycling2188
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2231
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2231
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshIndustrial Waste146700Tons1.5RoadOthersWill be raw material for brick manufacturing plant
(2.)ESP and Bag Filter DustIndustrial Waste48000Tons0.1Conveyor BeltOthersRecycle as a raw material for respective plant
(3.)TarIndustrial Waste7800Tons1.5RoadOthersWill be Sold to the market to Authorized Vendors
(4.)ESP DustIndustrial Waste1580Tons0.1Conveyor BeltOthersWill be used in sinter plant as raw material
(5.)Slag (Blast Furnace)Industrial Waste300000Tons80RoadOthersWill be sold to cement plant.
(6.)Miss RollIndustrial Waste2000Tons0.1RoadOthersWill be Reused as Raw material in EAF
(7.)End Cutting ScrapIndustrial Waste14000Tons0.1RoadOthersWill be Reused as Raw material in EAF
(8.)Mill scaleIndustrial Waste15000Tons0.1RoadOthersWill be Reused as Raw material in EAF
(9.)Char & DolocharIndustrial Waste270000Tons0.1Conveyor BeltOthersWill be used as raw material in power plant
(10.)ESP & Bagfilter Dust (Sponge Iron Plant)Industrial Waste299400Tons80RoadOthersused in Bricks, Blocks and Tiles Manufacturing
(11.)Kiln AccretionIndustrial Waste45000Tons1.5RoadOthersfilling of low laying area
(12.)Furnace Recycled scrapIndustrial Waste16275Tons0.1RoadOthersWill be recycled in back in process
(13.)Covertor SlagIndustrial Waste3084Tons1.5RoadOthersRoadmaking, filling of low lying areas
(14.)Bed Ash (Thermal Power Plant)Bottom Ash81946Tons1.5RoadOthersbricks, Blocks and Tiles Manufacturing
(15.)recycled materialIndustrial Waste735Tons0.1RoadOthersWill be recycled in back in process
(16.)Slag (Electric Arc Furnace)Industrial Waste84000Tons1.5RoadOthersCrushed With slag Crusher for recovery of metal.
(17.)Back FlowIndustrial Waste12000Tons0.1Conveyor BeltOthers+6mm reused & balance sold in local market.
(18.)Spillage & Waste ScrapIndustrial Waste34950Tons0.1RoadOthersWill be Reused as Raw material in EAF
(19.)IF SlagIndustrial Waste1782Tons1.5RoadOthersutilized bricks, Blocks and Tiles Manufacturing
(20.)TailingIndustrial Waste900000Tons60RoadOthersMaking bricks & sold to Cement Plant
(21.)Fly Ash (THermal Power Plant)Fly Ash327782Tons80RoadOthersash bricks, Blocks & Tiles Manufacturing
(22.)Scrap PipeIndustrial Waste4114Tons0.1RoadOthersWill be recycled in back in process
(23.)Hot OutIndustrial Waste7000Tons0.1RoadOthersWill be Reused as Raw material in EAF
(24.)WasteIndustrial Waste26861Tons1.5RoadOthersRoadmaking and filling of low lying areas.
(25.)GCP DustIndustrial Waste1200Tons0.1Conveyor BeltOthersWill be Reused in Sinter Plantas Raw Material
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.80.50.6491.45100
(2.)PM2.5Microgram per Meter Cube46.70.5046.7160
(3.)SO2Microgram per Meter Cube38.12.51.7039.8180
(4.)NOxMicrogram per Meter Cube44.73.00.9745.6880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Sinter PlantCoke422.54PM100.87
(2.)Pellet Plant (8,00,000 TPA))Coal604.43PM102.99
(3.)Pellet Plant (1200000 TPA)Coal705.1PM105.43
(4.)Power PlantCoal, Dolochar/Char1204.5PM107.8
(5.)Electric Arc Furnace-301.22PM100.21
(6.)Coke OvenCoal604.34PM102.5
(7.)Ductile Pipe (With Induction Furnace)-301.1PM100.17
(8.)Sponge Iron PLantCoal662.78PM101.04
(9.)Blast FurnaceCoke982.51PM100.83
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 210170
(b)Source Captive Power Plant and CSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 4x1010 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 61.807
(c)Government Land (ha.) 142.645
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 204.452
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 204.452
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : 00 00
    Total (ha.) 204.4520
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt81.0
(2.)Water Reservoir2.965
(3.)Tailing Pond6.0
(4.)Main Plant83.871
(5.)OthersOther Facilities30.616
Total (ha.) 204.452
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaSiltara Industrial Area0.0Project Site is in Critically Polluted Area
(2.)WLSNA00NA
(3.)ESZsNA00NA
(4.)CorridorsNA00NA
(5.)Wildlife CorridorsNA00NA
(6.)ESAsNA00NA
(7.)NPANA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00NA
(2.)Archaeological SitesNA00NA
(3.)Defence InstallationsNA00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 204.452
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R NA
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock (Pavo cristatus)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 8.33 Lacs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. Sr.No./W.L./Management-485/2034
(iii)Date of issue 29 May 2020
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kharoon River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 84
(b)Permanent Employment-During Operation 780
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 1134
(e)No. of working days 330
(f)Total Manpower 2998
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt52.8528.1581
(2.)Percentage of Total Project Area25.8513.7639.61
(3.)No. of Plants7927042225121495
(4.)Funds Allocated83233502450000032823350
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalMS scrap will be reused Greenbelt Development
(2.)Social• Employment generation • Development of Infrastructure under CER
(3.)FinancialRevenue generation in form of GST, IT and Other Taxes for State and Central Government.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1720/RA0101
(ii)Name of the EIA Consultant Pollution and Ecology Control Services
(iii)Address Near Dhantoli Police Station, Dhantoli Nagpur-440012
(iv)Mobile No. 7720076427
(v)Landline No. 0712229322
(vi)Email Id pecs_nagpur@rediffmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 15 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAFollowing EDS have been raised. i. Water requirement for the project is 47,635 KLD whereas permission for water drawl is only for 12,302 KLD. Water source for the remaining quantity is not specified. ii. Closure report from Regional Office – Nagpur on the observed non-compliances mentioned in the certified compliance report dated 2/6/2018 has not been submitted. Non-compliances are of very serious nature. iii. Action plan for transportation of materials may be provided, preferably by rail. iv. Iron ore cannot be procured through captive coal mines as mentioned. Confirmed source of iron ore/ coal linkage is required to be furnished. v. Document from Competent Authority indicating the acquisition of 204.452 Ha shall be furnished. 18 May 2019
2.NAThe correction have been made as per the instruction received 24 Jul 2019
3.NAProposal is returned due to the following: • Details of ToR accorded and previous EC has not been mentioned under para 6 of Form 2. • Translation of the PH proceedings has not been authenticated. • Closure report of RO along with the earlier certified compliance report shall be uploaded under para 9 of Form 2. • BOD & COD levels reported (1-2 mg/lit) on surface water samples appears to be very low. • The project site is located in Siltara Industrial Area. As per the NGT order dated 10/07/2019, expansion in the said area is prohibited till action plan is implemented by statutory authorities. • Conservation plan for schedule I species has not been approved by the Forest Department. • Study on social impact assessment shall be furnished. 13 Aug 2019
4.NAThe correction have been made as per the instruction received 02 Jul 2020
5.NAThe correction have been made as per the instruction received 02 Jul 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantP S Dutta Gupta
DesignationHead - Corporate Affairs
Name of Company (Applicant Name should not be given here)SARDA ENERGY AND MINERALS LIMITED
AddressVanijya Bhawan, Jail Road,
Print