Details of Project:
(a)Name of the project(s) Expansion of 0.21 MTPA pig Iron Plant to 0.378 MTPA Integrated Steel Plant with 30 MW Power Plant
(b)Name of the Company / Organisation KIC METALIKS LTD
(c)Registered Address "Sir RNM House" , 3B Lal Bazar Street, 4th floor, Room-02, Kolkata, West Bengal,,Burdwan,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Arun Kumar Das
(b)Designation (Owner/ Partner/ CEO) Sr. General manager
(c)Address Raturia, Angadpur, Durgapur, Burdwan, West Bengal,,Kanksa,Burdwan,West Bengal-713215
(d)Pin code 713215
(e)E-mail arun_das265@rediffmail.com
(f)STD Code. 33(f)Telephone No. 2590720
(g)Fax No. 40019636
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/5612/2011
(d)Master Proposal Number(Single Window) SW/101820/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2,1,285,324,145,150,62,66
(b)Pincode 713215
(c)Bounded Latitudes (North)
From
Degree 233024.58
Minutes
Second
From
Degree 233048.75
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 871622.70
Minutes
Second
From
Degree 871643.23
Minutes
Second
(e)Survey of India Topo Sheet No. F45D6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 72
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/556/2009-IA.II(I)
(c)Date of Issue of TOR 09 Dec 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 04 Jan 2011
(c)Date of Issue of EC 24 May 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Oct 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Nov 2017
Distance of Public Hearing Venue from the Proposed Project :4.0
Tathya Kendra
State :West Bengal
District :Burdwan
Tehsil :Kanksa
Village :Durgapur Municipal Corporation
96Employment to local youth, Prevent environmental degradation, Implementation of CSR ActivitiesOthersDMDC
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-385/EPE/205
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 31 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sinter180000180000360000Tons per Annum(TPA)Conveyor Belt
(2.)Sponge Iron0224000224000Tons per Annum(TPA)Road
(3.)Pig Iron21000025000235000Tons per Annum(TPA)Road
(4.)Billet0384000384000Tons per Annum(TPA)Conveyor Belt
(5.)TMT rods, angles0378000378000Tons per Annum(TPA)Road
(6.)Power52530Mega Watt(MW)Otherstransmission line
(7.)PSC30000030000Tons per Annum(TPA)Roadtransmission line
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)CPP-WHRB5 MW14 MW19 MW
(2.)MBF215 m3245 m3245 m3Modification of the equipment
(3.)EAF01x30 T1x30 T
(4.)Rolling Mill01200 TPD1200 TPD
(5.)Sinter Plant1x25 m21x25 m22x25 m2
(6.)CPP-AFBC011 MW11 MW
(7.)Cement Grinding Unit100 TPD0100 TPD
(8.)Oxygen Plant01x50 TPD VPSA & 1x100 TPD ASU1x50 TPD VPSA & 1x100 TPD ASU4500 Nm3/hr
(9.)Nitrogen Plant01x50 TPD PSA1x50 TPD PSA5500 m3/hr
(10.)PCI plant01x100 TPD1x100 TPD32000 TPA used in MBF
(11.)DRI02X350 TPD2x350 TPD
(12.)CCM01200 TPD1200 TPD
(13.)IF with LF & VD04x15 T4X15 T
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Apr 2016
(iv)Valid Upto 31 Mar 2024
(v)File No. CO110279
(vi)Application No. 613-dr-Co-S/10/0775
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 555
(b) Funds Allocated for Environment Management (Capital) (in Crores) 30
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.41
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.51
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1246460
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 1246460
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron Ore fines400000Tons per AnnumBarbilRail250 LinkageCopy of Linkage
(2.)Coal85000Tons per AnnumRanioganjRail10 LinkageCopy of Linkage
(3.)Iron ore325000Tons per AnnumBarbilRail250 LinkageCopy of Linkage
(4.)Coal270000Tons per AnnumSister unitRoad136 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube82.961.1782.75100
(2.)PM2.5Micro Gram per Meter Cube45.2123.0244.9960
(3.)SO2Micro Gram per Meter Cube17.537.2217.0180
(4.)NOxMicro Gram per Meter Cube29.6416.1729.280
(5.)OthersCOMicro Gram per Meter Cube8054087982000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l76.965.22501000
(2.)Heavy MetalsIronmg/l0.090.070.30.3
(3.)pHNA7.667.256.58.5
(4.)TSSmg/l2.01.900
(5.)Fluoridemg/l0.290.1511.5
(6.)OthersArsenicmg/l0.0090.0090.010.05
(7.)TDSmg/l3263085002000
(8.)Total Hardnessmg/l144.1116.9200600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l36.521.4C
(2.)pHNA7.747.25C
(3.)DOmg/l6.354.85C
(4.)BODmg/l9.66.1C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.849.8255
(2.)Leq(Night)A-weighted decibels(dB(A))50.5132.345
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.97.2
(2.)N(Nitrogen)Milligram per Kilogram15.611.5
(3.)P(Phosphorus)Milligram per Kilogram9.388.15
(4.)Electric ConductivityOthersmicriseimens/cm268252
(5.)K(Potassium)Milligram per Kilogram37.530.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5316.20Copy of Permission LetterPipelineOthersDMC, DPLDP/7W/14N-1/1122/1(2)08 Dec 20095400
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic356400STPGreen Belt Renewal Plant356
(2.)Industrial10441100ETPReuse within the Plant & Recycling1044
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1400
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1400
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BF SlagIndustrial Waste70500Tons0RoadAuthorized Recyclers
(2.)EAF+IF slagIndustrial Waste39120Tons3RoadOthersLow land filling after iron recovery
(3.)ScrapIndustrial Waste10000Tons0Conveyor BeltCo-Processing
(4.)DolcharIndustrial Waste36600Tons0Conveyor BeltCo-Processing
(5.)CPPFly Ash28300Tons0RoadAuthorized Recyclers
(6.)CPPBottom Ash18920Tons0RoadAuthorized Recyclers
(7.)DRIFly Ash91480Tons4RoadSanitary Landfills
(8.)BF SludgeIndustrial Waste112800Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube41.337.240.0141.3460
(2.)SO2Microgram per Meter Cube12.380.799.4821.8780
(3.)NOxMicrogram per Meter Cube28.290.7911.1839.4880
(4.)PM10Microgram per Meter Cube82.707.240.0682.77100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CPPCoal451.6SO211.93
(2.)2x350 TPD DRICoal762.5OthersPM 2.50.040
(3.)RMHPNA301PM100.0078
(4.)15 T IFElectricity301OthersPM2.50.027
(5.)15 T IFElectricity301OthersPM2.50.027
(6.)CPPCoal451.6PM100.038
(7.)CPPCoal`451.6OthersPM2.50.035
(8.)25 m2 SinterCoal451.2PM100.026
(9.)25 m2 SinterCoal451.2PM100.026
(10.)25 m2 SinterCoal301.2SO210.25
(11.)25 m2 SinterCoal301.2SO210.25
(12.)25 m2 SinterCoal301.2NOx6.98
(13.)2X350 TPD DRICoal762.5SO219.44
(14.)15 T IFElectricity301PM100.03
(15.)2x350 TPD DRICoal762.5PM10.044
(16.)15 T IFElectricity301OthersPM2.50.027
(17.)15 T IFElectricity301PM100.03
(18.)15 T IFElectricity301OthersPM2.50.027
(19.)RMHPNA301OthersPM2.50.0072
(20.)25 m2Coal451.2NOx6.98
(21.)15 T IFElectricity301PM100.03
(22.)15 T IFElectricity301PM100.03
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17
(b)Source DVC
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 30.65
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 30.65
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 117.57
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 21.31
(d)Surface Water Bodies (ha.) 31.27
(e)Settlements (ha.) 78.78
(f)Industrial (ha.) 39.84
(g)Forest (ha.) 14.57
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining, Road, Stadium, Institution, Swampy 22.11
    Total (ha.) 325.45000000000005
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant10.86
(2.)Green belt10.22
(3.)Area for Solid Waste Management1.25
(4.)Water Reservoir2.02
(5.)OthersRaw Material2.16
(6.)Built Up Area4.14
Total (ha.) 30.65
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0Not found
(2.)ESAsNA0Not found
(3.)CorridorsNA0Not found
(4.)Wildlife CorridorsNA0Not found
(5.)NPANA0Not found
(6.)Critically Polluted AreaNA0Not found
(7.)ESZsNA0Not found
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0Not Found
(2.)ForestNA0Not Found
(3.)Defence InstallationsNA0Not Found
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 30.65
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Damodar
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 68
(b)Permanent Employment-During Operation 140
(c)Temporary Employment- During Construction 277
(d)Temporary Employment- During Operation 207
(e)No. of working days 320
(f)Total Manpower 692
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6.393.8310.219999999999999
(2.)Percentage of Total Project Area20.812.433.2
(3.)No. of Plants9620572615346
(4.)Funds Allocated13050008016402106640
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAfforestation
(2.)SocialInfrastructure Development, Employment Generation
(3.)FinancialRevenue Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 77
(ii)Name of the EIA Consultant Global Tech Enviro Experts Pvt Ltd
(iii)Address C-23, BJB Nagar
(iv)Mobile No. 9437033487
(v)Landline No. 0674243685
(vi)Email Id global1experts@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 Nov 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantArun Kumar Das
DesignationSr. General manager
Name of Company (Applicant Name should not be given here)KIC METALIKS LTD
Address"Sir RNM House" , 3B Lal Bazar Street, 4th floor, Room-02, Kolkata, West Bengal
Print