1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Chhattisgarh Power & Coal Beneficiation Limited | (b)Name of the Company / Organisation | CHHATTISGARH POWER AND COAL BENEFICIATION LTD | (c)Registered Address | Agrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh,,Bilaspur,Chhattisgarh-496004 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shikhar Agrawal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Agrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh,,Bilaspur,Bilaspur,Chhattisgarh-496004 | (d)Pin code | 496004 | (e)E-mail | cpcbl.coal@gmail.com | (f)STD Code. | 7752(f)Telephone No. | 410008 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/CMIN/101487/2004 | (d)Master Proposal Number(Single Window) | SW/101481/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 60 A and 60 B | (b)Pincode | 496004 | (c)Bounded Latitudes (North) | | From | | Degree | 22.047 | Minutes | | Second | | From | | Degree | 22.049 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.130 | Minutes | | Second | | From | | Degree | 82.131 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 J/4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 269 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 5.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Orissa | Jagatsinghapur | Kujang | SANDHAKUDA | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/68/2017-IA.II (M) | (c)Date of Issue of TOR | 24 May 2004 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 11 Oct 2019 | (c)Date of Issue of EC | 03 Feb 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.8 |
| open place Behind Sirgitti Police Station | State : | Chhattisgarh | District : | Bilaspur | Tehsil : | Bilaspur | Village : | Sirgitti |
| 100 | Pollution, Employment, Socio economic activity, Greenbelt development etc. | Others | Additional Collectorate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | J-11015/68/2017-IA.II(M) | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 6 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal Washery wet type | 0 | 2.0 | 2 | Others | MTPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal Washery | 1.25 MTPA FBC type | 2.0 MTPA HMC type | 2.0 MTPA HMC | removing existing, establishment of new plant | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 Oct 2016 | (iv)Valid Upto | 30 Sep 2019 | (v)File No. | 3903/TS/CECB/2016 | (vi)Application No. | 263463 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 18.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.3 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2.0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 2 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw coal | 2.0 | Others | MTPA | SECL mines at Dipka, Gevra, Kusmunda | Road,Rail | | 75 | Others | Letter of Interest | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 75.6 | 33.9 | 75.6 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 24.2 | 7.8 | 24.2 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 23.5 | 8.6 | 23.5 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 1450 | 535 | 1450 | 2000 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 45.4 | 18.4 | 45.4 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.9 | 7.3 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 474 | 331 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 241 | 145 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.5 | 0.3 | 1.0 | 1.5 | (5.) | TSS | | | mg/l | | 3.1 | 1.0 | 0 | 1 | (6.) | Heavy Metals | | Iron | mg/l | | 0.019 | 0.016 | 0.3 | 1.0 | (7.) | Total Hardness | | | mg/l | | 310 | 181 | 300 | 600 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.6 | 7.4 | B | (2.) | DO | | mg/l | | 6.5 | 4.3 | B | (3.) | COD | | mg/l | | 12 | 11 | B | (4.) | Others | TDS | mg/l | | 147 | 132 | B | (5.) | BOD | | mg/l | | 2.8 | 2.2 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65 | 42 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 59 | 36 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 423 | 209 | (2.) | P(Phosphorus) | Kilogram per hectare | | 47 | 19 | (3.) | K(Potassium) | Kilogram per hectare | | 210 | 52 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 159 | 132 | (5.) | pH | | | 7.6 | 7.1 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.52 To 2.26 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.11 To 10.33 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | CSIDC | 400 | 0 | Copy of Permission Letter | Pipeline | | Others | Pipeline | CSIDC/Division-1/2017-18/9901 | 02 Jan 2018 | 400 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sanitary Waste water | 8 | 8 | septic tank followed by subsurface dispersion trench | Others | septic tank | 8 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 8 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 8 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Rejects | Industrial Waste | | 400000 | Tons | 55 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 75.6 | 0.5 | 2.46 | 78.06 | 100 | (2.) | NOx | | Microgram per Meter Cube | 23.5 | 0.5 | 14.4 | 37.95 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 45.4 | 0.5 | 1.5 | 46.95 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 24.2 | 0.5 | 0 | 24.3 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 1450 | 0.5 | 9.3 | 1459.35 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Coal Crusher | Electricity | 30 | 0.5 | SO2 | | 0 | (2.) | Coal Crusher | Electricity | 30 | 0.5 | NOx | | 0 | (3.) | Coal Crusher | Electricity | 30 | 0.5 | PM10 | | 0.05 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1500 | (b)Source | CSIDC | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 500 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 4.49 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.49 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 6160 | (b)Waste/Barren Land (ha.) | 90 | (c)Grazing/ Community Land (ha.) | 1630 | (d)Surface Water Bodies (ha.) | 730 | (e)Settlements (ha.) | 810 | (f)Industrial (ha.) | 270 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mining area | 310 | Total (ha.) | 10000 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.81 | | (2.) | Green belt | | 1.5 | | (3.) | Water Reservoir | | 0.18 | | (4.) | Others | Area for Raw & Washed coal | 1.26 | | (5.) | Area for Solid Waste Management | | 0.18 | Rejects | (6.) | Built Up Area | | 0.56 | Internal road & Parking | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | NA | (2.) | WLS | Nil | 0 | NA | (3.) | NPA | Nil | 0 | NA | (4.) | ESAs | Nil | 0 | NA | (5.) | ESZs | Nil | 0 | NA | (6.) | Corridors | Nil | 0 | NA | (7.) | Wildlife Corridors | Nil | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Nil | 0 | NA | (2.) | Archaeological Sites | | Nil | 0 | NA | (3.) | Defence Installations | | Nil | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.49 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | total land is taken on lease from CSIDC | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Arpa river | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 5.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 150 | (d)Temporary Employment- During Operation | 85 | (e)No. of working days | 300 | (f)Total Manpower | 250 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.0 | 0.5 | 1.5 | (2.) | Percentage of Total Project Area | 23 | 10 | 33 | (3.) | No. of Plants | 2500 | 1250 | 3750 | (4.) | Funds Allocated | 200000 | 100000 | 300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | With the implementation of the proposed project, the socio-economic status of the local people will improve substantially. The land rates in the area will improve in the nearby areas due to the proposed plant. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Medical facilities will certainly improve due to the proposed project. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Not applicable as project is coal washery | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | not applicable | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | TOR letter no. J-11015/68/2017-IA.II (M) | (b)Date of Approval | 06 Nov 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | MOEF&CC | (e)Approved Mining Lease Area | 4.49 | (f)Approved Capacity | 2500000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | Not applicable | (b)Mineable Reserves (Million Ton) | not applicable | (c)Extractable Reserves(Million Ton) | not applicable | (d)Percent(%) of Extraction | not applicable | (e)Grade of Coal /Ore /Mineral | not applicable | (f)Stripping Ratio | not applicable : not applicable | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | not applicable | (h)Average Gradient(Degree) | not applicable | (i)Mining Method | Opencast | (j)Life of Mine (Years) | not applicabe | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 4.49 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Not applicable as proposed project is coal washery | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Not applicable as proposed project is coal washery | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Not applicable as proposed project is coal washery | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | not applicable as proposed project is coal washery | (b)Surface to Siding/Loading | not applicable as proposed project is coal washery | (c)Transportation / Conveyor Details | not applicable as proposed project is coal washery | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 0 | 6160 | 6160 | (2.) | GRAZING LAND | | 0 | 1630 | 1630 | (3.) | SURFACE WATER BODIES | | 0 | 730 | 730 | (4.) | OTHERS(Specify) | Mining area | 0 | 310 | 310 | (5.) | FOREST LAND | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 810 | 810 | (7.) | WASTE LAND | | 0 | 90 | 90 | |
TOTAL | 0 | 9730 | 9730 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | ROADS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (4.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (8.) | GREEN BELT | | 1.5 | 0 | 0 | | 1.5 | |
TOTAL | 1.5 | 0 | 0 | 0 | 1.5 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 0 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 1.5 | |
|
17. | Status of progressive Mining Closure Plan: | Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan | Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan | Any Deviation from the Approved Progressive Mine Closure Plan | not applicable as propsed project is coal washery | Total Area Excavated (in hectare) | 0 | Total Area Backfilled after Excavation (in hectare) | 0 | Total Area Reclaimed (in hectare) | 0 | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1619/ RA 026 | (ii)Name of the EIA Consultant | PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD | (iii)Address | 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 500082 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402331427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- No requirement of prior EC for the existing 1.25 MTPA coal washery in terms of the provisions of the EIA Notification, 1994/2006 along with supporting documents.
- Permission required from the concerned regulatory authority to meet the increased water requirement of 380 cum/day. | 20 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 21 May 2019 | 3. | NA | a. Water permission dated 2nd january, 2017 from CSIDC is subject to construction of ETP. please inform/clarify what is the status of construction of ETP and other infrastructure i.e pipeline from ETP to washery site.
b. A copy of agreement for power supply of 1.5 MW from CSIDC. | 11 Jun 2019 | 4. | NA | The correction have been made as per the instruction received | 23 Jul 2019 | 5. | NA | 1. Detailed Status and impact on habitation (people living) along the transportation of raw coal should be provided
2. Plan for utilisation of washery reject, Quantity and Mode of transportation of washery rejects. If transportation is by road then traffic assessment study and its impact on habitation should be submitted | 17 Sep 2019 | 6. | NA | The correction have been made as per the instruction received | 11 Oct 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shikhar Agrawal | Designation | Director | Name of Company (Applicant Name should not be given here) | CHHATTISGARH POWER AND COAL BENEFICIATION LTD | Address | Agrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh |
|