Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Chhattisgarh Power & Coal Beneficiation Limited
(b)Name of the Company / Organisation CHHATTISGARH POWER AND COAL BENEFICIATION LTD
(c)Registered Address Agrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh,,Bilaspur,Chhattisgarh-496004
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shikhar Agrawal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Agrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh,,Bilaspur,Bilaspur,Chhattisgarh-496004
(d)Pin code 496004
(e)E-mail cpcbl.coal@gmail.com
(f)STD Code. 7752(f)Telephone No. 410008
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/101487/2004
(d)Master Proposal Number(Single Window) SW/101481/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 60 A and 60 B
(b)Pincode 496004
(c)Bounded Latitudes (North)
From
Degree 22.047
Minutes
Second
From
Degree 22.049
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.130
Minutes
Second
From
Degree 82.131
Minutes
Second
(e)Survey of India Topo Sheet No. 64 J/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 269
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJagatsinghapurKujangSANDHAKUDA
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/68/2017-IA.II (M)
(c)Date of Issue of TOR 24 May 2004
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 11 Oct 2019
(c)Date of Issue of EC 03 Feb 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :1.8
open place Behind Sirgitti Police Station
State :Chhattisgarh
District :Bilaspur
Tehsil :Bilaspur
Village :Sirgitti
100Pollution, Employment, Socio economic activity, Greenbelt development etc.OthersAdditional Collectorate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. J-11015/68/2017-IA.II(M)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 6 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Washery wet type02.02OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal Washery1.25 MTPA FBC type2.0 MTPA HMC type2.0 MTPA HMCremoving existing, establishment of new plant
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Oct 2016
(iv)Valid Upto 30 Sep 2019
(v)File No. 3903/TS/CECB/2016
(vi)Application No. 263463
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 18.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2.0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal2.0OthersMTPASECL mines at Dipka, Gevra, KusmundaRoad,Rail75 OthersLetter of InterestCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube75.633.975.6100
(2.)SO2Micro Gram per Meter Cube24.27.824.280
(3.)NOxMicro Gram per Meter Cube23.58.623.580
(4.)OthersCOMicro Gram per Meter Cube145053514502000
(5.)PM2.5Micro Gram per Meter Cube45.418.445.460
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.97.36.58.5
(2.)TDSmg/l4743315002000
(3.)Chloridesmg/l2411452501000
(4.)Fluoridemg/l0.50.31.01.5
(5.)TSSmg/l3.11.001
(6.)Heavy MetalsIronmg/l0.0190.0160.31.0
(7.)Total Hardnessmg/l310181300600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.4B
(2.)DOmg/l6.54.3B
(3.)CODmg/l1211B
(4.)OthersTDSmg/l147132B
(5.)BODmg/l2.82.2B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))654275
(2.)Leq(Night)A-weighted decibels(dB(A))593670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare423209
(2.)P(Phosphorus)Kilogram per hectare4719
(3.)K(Potassium)Kilogram per hectare21052
(4.)Electric ConductivityMillisiemens per Centimetre159132
(5.)pH7.67.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.52 To 2.26
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.11 To 10.33
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersCSIDC4000Copy of Permission LetterPipelineOthersPipelineCSIDC/Division-1/2017-18/990102 Jan 2018400
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sanitary Waste water88septic tank followed by subsurface dispersion trenchOthersseptic tank80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)RejectsIndustrial Waste400000Tons55RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube75.60.52.4678.06100
(2.)NOxMicrogram per Meter Cube23.50.514.437.9580
(3.)PM2.5Microgram per Meter Cube45.40.51.546.9580
(4.)SO2Microgram per Meter Cube24.20.5024.380
(5.)Others(Specify)COMicrogram per Meter Cube14500.59.31459.352000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coal CrusherElectricity300.5SO20
(2.)Coal CrusherElectricity300.5NOx0
(3.)Coal CrusherElectricity300.5PM100.05
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source CSIDC
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 4.49
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 4.49
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 6160
(b)Waste/Barren Land (ha.) 90
(c)Grazing/ Community Land (ha.) 1630
(d)Surface Water Bodies (ha.) 730
(e)Settlements (ha.) 810
(f)Industrial (ha.) 270
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining area 310
    Total (ha.) 10000
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.81
(2.)Green belt1.5
(3.)Water Reservoir0.18
(4.)OthersArea for Raw & Washed coal1.26
(5.)Area for Solid Waste Management0.18Rejects
(6.)Built Up Area0.56Internal road & Parking
Total (ha.) 4.49
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0NA
(2.)WLSNil0NA
(3.)NPANil0NA
(4.)ESAsNil0NA
(5.)ESZsNil0NA
(6.)CorridorsNil0NA
(7.)Wildlife CorridorsNil0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0NA
(2.)Archaeological SitesNil0NA
(3.)Defence InstallationsNil0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.49
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land is taken on lease from CSIDC
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arpa river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 5.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 85
(e)No. of working days 300
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.00.51.5
(2.)Percentage of Total Project Area231033
(3.)No. of Plants250012503750
(4.)Funds Allocated200000100000300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialWith the implementation of the proposed project, the socio-economic status of the local people will improve substantially. The land rates in the area will improve in the nearby areas due to the proposed plant. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. Medical facilities will certainly improve due to the proposed project.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Not applicable as project is coal washeryMinor
2.
Mine Capacity in ROM (Run of Mine) not applicable
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. TOR letter no. J-11015/68/2017-IA.II (M)
(b)Date of Approval 06 Nov 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department MOEF&CC
(e)Approved Mining Lease Area 4.49
(f)Approved Capacity 2500000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) Not applicable
(b)Mineable Reserves (Million Ton) not applicable
(c)Extractable Reserves(Million Ton) not applicable
(d)Percent(%) of Extraction not applicable
(e)Grade of Coal /Ore /Mineral not applicable
(f)Stripping Ratio not applicable : not applicable
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) not applicable
(h)Average Gradient(Degree) not applicable
(i)Mining Method Opencast
(j)Life of Mine (Years) not applicabe
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.49
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Not applicable as proposed project is coal washery
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not applicable as proposed project is coal washery
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not applicable as proposed project is coal washery
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface not applicable as proposed project is coal washery
(b)Surface to Siding/Loading not applicable as proposed project is coal washery
(c)Transportation / Conveyor Details not applicable as proposed project is coal washery
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND061606160
(2.)GRAZING LAND016301630
(3.)SURFACE WATER BODIES0730730
(4.)OTHERS(Specify)Mining area0310310
(5.)FOREST LAND000
(6.)SETTLEMENTS0810810
(7.)WASTE LAND09090
TOTAL097309730
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)ROADS0000
(3.)VIRGIN AREA0000
(4.)EXCAVATION/QUARRY0000
(5.)TOP SOIL STORAGE0000
(6.)EXTERNAL OB DUMPS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)GREEN BELT1.5001.5
TOTAL1.50001.5
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 1.5
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan not applicable as propsed project is coal washery
Total Area Excavated (in hectare) 0
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402331427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - No requirement of prior EC for the existing 1.25 MTPA coal washery in terms of the provisions of the EIA Notification, 1994/2006 along with supporting documents. - Permission required from the concerned regulatory authority to meet the increased water requirement of 380 cum/day. 20 Apr 2019
2.NAThe correction have been made as per the instruction received 21 May 2019
3.NAa. Water permission dated 2nd january, 2017 from CSIDC is subject to construction of ETP. please inform/clarify what is the status of construction of ETP and other infrastructure i.e pipeline from ETP to washery site. b. A copy of agreement for power supply of 1.5 MW from CSIDC. 11 Jun 2019
4.NAThe correction have been made as per the instruction received 23 Jul 2019
5.NA1. Detailed Status and impact on habitation (people living) along the transportation of raw coal should be provided 2. Plan for utilisation of washery reject, Quantity and Mode of transportation of washery rejects. If transportation is by road then traffic assessment study and its impact on habitation should be submitted 17 Sep 2019
6.NAThe correction have been made as per the instruction received 11 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShikhar Agrawal
DesignationDirector
Name of Company (Applicant Name should not be given here)CHHATTISGARH POWER AND COAL BENEFICIATION LTD
AddressAgrawal Bhawan, Vidya Nagar, Bilaspur, Chhattisgarh
Print