1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Increase Of Iron Ore Production From 1.25 To 1.50 MTPA, Bhadra Iron Ore Mine, M/S. JSW Steel Limited | (b)Name of the Company / Organisation | JSW STEEL LIMITED | (c)Registered Address | JSW Steel Limited, P.O. Vidyanagar, Toranagallu, Sandur Taluk, Ballari District, Karnataka,,Bellary,Karnataka-583275 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sunil Kumar Singh | (b)Designation (Owner/ Partner/ CEO) | GM Mines | (c)Address | JSW Mining Office, Near Talur Cross, Toranagallu, Sandur Taluk, Ballari, Karnataka,,,Bellary,Karnataka-583275 | (d)Pin code | 583275 | (e)E-mail | jswminesenvironment@gmail.com | (f)STD Code. | 8395(f)Telephone No. | 250132 | (g)Fax No. | 08395250132 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/MIN/7548/2008 | (d)Master Proposal Number(Single Window) | SW/101231/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | ML No. 2365,Forest Land of Donimalai range | (b)Pincode | 583118 | (c)Bounded Latitudes (North) | | From | | Degree | 1667718.86 | Minutes | | Second | | From | | Degree | 1671979.41 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 674874.25 | Minutes | | Second | | From | | Degree | 676895.41 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57 A/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 962 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.9 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/16/2007- IA. II (M) | (c)Date of Issue of TOR | | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 23 Feb 2008 | (c)Date of Issue of EC | 13 May 2008 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Dec 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Mine Site | State : | Karnataka | District : | Bellary | Tehsil : | Sandur | Village : | Ittanahalli / Taranagar village |
| 600 | 1. Job opportunity to the local people (priority to the workers who were working in earlier TML company during appointment) and protect the local environment.
2. Adopt the Taranagara and surrounding | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/673/KAR2222 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 16 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Iron Ore | 1250000 | 250000 | 1500000 | Tons per Annum(TPA) | | Road,Pipe Conveyor | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Iron Ore Mine | 1250000 | 250000 | 1500000 | Tons per Annum(TPA) | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 30 Oct 2017 | (iv)Valid Upto | 01 Nov 2017 | (v)File No. | Not Applicable, CTO Yet to Apply | (vi)Application No. | Not Applicable, CTO Yet to Apply | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 110 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.63 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 152 | (b)Existing quantity of raw material/fuel | 608 | (c)Total quantity of raw material/fuel | 760 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | ANFO & Booster | 760 | Tons per Annum | | Licensed Vendors | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 14.6 | 8.0 | 14.4 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 16 | 8.8 | 15.9 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 39.5 | 20.4 | 37.5 | 60 | (4.) | PM10 | | Micro Gram per Meter Cube | 64.4 | 44.2 | 63.9 | 100 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 1.45 | 0.5 | 1.0 | 1.5 | (2.) | Heavy Metals | | zinc | mg/l | | 0.19 | 0.02 | 5 | 10 | (3.) | pH | | | NA | | 8.16 | 6.98 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | TDS | | | mg/l | | 1216 | 781 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 587 | 383 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 267 | 113 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.79 | 7.79 | C | (2.) | BOD | | mg/l | | 3 | 3 | C | (3.) | COD | | mg/l | | 18 | 18 | C | (4.) | DO | | mg/l | | 5.8 | 5.8 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.1 | 48.8 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.7 | 37.4 | 45 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.11 | 7.46 | (2.) | N(Nitrogen) | Kilogram per hectare | | 407 | 232 | (3.) | P(Phosphorus) | Kilogram per hectare | | 117 | 33 | (4.) | K(Potassium) | Kilogram per hectare | | 632 | 280 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 523 | 189 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 50 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 35 To 40 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 250 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 2018-19/46 | 24 Jul 2018 | 30 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 4 | 8 | Septic Tank Followed by Soak Pit | Others | Septic Tank Followed by Soak Pit | 0 | 4 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 4 | (b)Total Discharged Water (Kilolitre per Day) | 4 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Waste Rock | Others | Mining | 6000000 | Tons | 0 | Road | | Others | Dumps and Backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 36 | 0.5 | 1 | 38 | 60 | (2.) | NOx | | Microgram per Meter Cube | 15 | 0.5 | 1 | 17 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 63 | 0.5 | 13 | 77 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 13 | 0 | 1 | 15 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | 0 | 0 | 0 | Others | None | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000 | (b)Source | Grid of GESCOM | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 KVA and 63.5 KVA | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 133.58 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 133.58 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 130.53 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : none | 0 | Total (ha.) | 130.53 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 57.89 | - | (2.) | Green belt | | 7.38 | - | (3.) | Built Up Area | | 0.30 | - | (4.) | OB Dump Area | | 34.57 | - | (5.) | Others | Virgin/ Unbroken - 28.89 Ha. & Roads - 1.5 Ha. | 30.39 | - | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | - | (2.) | WLS | None | 0 | - | (3.) | ESZs | None | 0 | - | (4.) | Wildlife Corridors | None | 0 | - | (5.) | NPA | None | 0 | - | (6.) | Corridors | None | 0 | - | (7.) | ESAs | None | 0 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | - | (2.) | Defence Installations | | None | 0 | - | (3.) | Forest | | Donimalai RF | 0 | Mine is part of Donimalai RF | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Final(Stage-II) Approval Obtained | (i)MoEFCC file number | FP/KA/MIN/25219/2017 | (ii)Date of final approval | 15 May 2019 | (iii)Date of In-Principle Approval | 15 May 2019 | (iv)Area diverted | 133.58 | (v)Uploaded FC Letter | Copy of FC Letter | (b)Legal Status of Forest Land | Reserved | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 130.53 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Stage-II Clearance obtained | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Blackbuck (Antelope cervicarpa), Indian Wolf (Canis Lupus) Indian Leopard (Panthera Pardus) Sloth Bear (Melursus Ursinus) Indian Peafowl (Pavo Cristatus) Monitor Lizard (Varanus Bengalensis) Python | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 64 Lakhs | (iii)Period of Implementation | 3 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | PCCF/WLD/CR-41/2018-19 | (iii)Date of issue | 19 Sep 2018 | (iv)Recommendation | Conservation Measures are recommended | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Narihalla Dam & Reservoir | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1.9 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 14000 | (b)Permanent Employment-During Operation | 264 | (c)Temporary Employment- During Construction | 840 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 300 | (f)Total Manpower | 15204 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 7.38 | 7.38 | (2.) | Percentage of Total Project Area | 0 | 5.65 | 5.65 | (3.) | No. of Plants | 0 | 18450 | 18450 | (4.) | Funds Allocated | 0 | 18.97 | 18.97 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Iron Ore | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1.5 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 279/1093/2017/BNG/453 | (b)Date of Approval | 06 Jul 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 130.53 | (f)Approved Capacity | 1.5 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 28.82 | (b)Mineable Reserves (Million Ton) | 27.50 | (c)Extractable Reserves(Million Ton) | 27.50 | (d)Percent(%) of Extraction | 95 | (e)Grade of Coal /Ore /Mineral | 45 - 65 % of Fe Content | (f)Stripping Ratio | 1 : 4.06 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 62 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 20 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 250 | Mobile Crushing Plant | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 130.53 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 26 Oct 2016 | (iii)Validity of LOI | 3 | (iv)Reference No. of LOI | DMG/MLS/CCA/12/2365/2016-17 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | The present proposal is a new mine. LOI granted un | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | LOI granted under E-Auction | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 34.57 | (iii)Height (in meter) | 196 | (iv)Quantity (in Million Cubic meter) | 22 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 57.89 | (b)Depth (in meter) | 116 | (c)Volume (in Million Cubic meter) | 67.15 | |
|
12. | Details of Quarry: | (a)Final Void of 57.89 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 130.53 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers | (b)Surface to Siding/Loading | Dumpers | (c)Transportation / Conveyor Details | Proposed DTH | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 130.53 | 0 | 130.53 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (4.) | AGRICULTURE LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 0 | 0 | 0 | (6.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 130.53 | 0 | 130.53 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | ROADS | | 0 | 0 | 1.50 | | 1.5 | (4.) | EXCAVATION/QUARRY | | 57.89 | 0 | 0 | | 57.89 | (5.) | INTERNAL OB DUMPS | | 34.57 | 0 | 0 | | 34.57 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.30 | | 0.3 | (7.) | GREEN BELT | | 7.38 | 0 | 0 | | 7.38 | (8.) | VIRGIN AREA | | 28.89 | 0 | 0 | | 28.89 | |
TOTAL | 128.73 | 0 | 1.8 | 0 | 130.53 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 34.57 | (c)Quarry(in hectare) | 130.53 | (d)Safety Zone(in hectare) | 7.38 | (e)Final Void of 57.89 (hectare) at a Depth of 116 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 30.69 | (h)Total afforestation plant (in hectare) | 7.38 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 201718 | 1.25 | 0 | 1.5 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA064 | (ii)Name of the EIA Consultant | B. S. Envi-Tech Pvt. Ltd | (iii)Address | 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017 | (iv)Mobile No. | 9848053012 | (v)Landline No. | 4049783062 | (vi)Email Id | info@bsenvitech.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 12 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please submit the following:-
1. Copy of EC and TOR documents.
2. Copy of forest clearance document
3. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
4. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
5. Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.)
6. Details of demand if any raised by Department of Mining and Geology
7. Details of payment, if any made to Department of Mines & Geology
8. Validity of mine lease and copy of valid lease document.
9. Status of mine whether working or not.
10. The company name mentioned as M/s Tungabhadra Minerals (P) Ltd in the PARIVESH PORTAL, however, the application submitted by M/s. JSW Steel Limited. Please correct the same in the parivesh portal.
11. The total mine lease area in the Form 2 is not the same as LOI/Lease document. Please correct the same. | 08 May 2019 | 2. | NA | The correction have been made as per the instruction received | 21 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting the replies to ADS points. We request MOEFCC to grant Environmental Clearance. | 21 Dec 2019 | 2. | ADS Raise Letter | ADS | 19 Dec 2019 | 3. | ADS Reply Letter | NA | 26 Aug 2019 | 4. | NA | Based on the presentation made by PP and the discussion held, the
Committee deferred the proposals and asked the PP to submit following
requisite information for further consideration.
(i). PP needs to carry out the 3D modeling for PM2.5 and PM10 taking it as
point at top of mine and assess impacts on nearby village, habitation,
vegetation and agriculture land.
(ii). PP needs to submit the provisions of control of dust at the source be made
to prevent the impacts on environment.
(iii). PP requires to carry out direction particle size analysis for upwind and
downwind direction of dust.
(iv). PP requires to submit the socio-economic survey for affected people
(quantity needs to be specified) and measures for protection with timeline
and budgetary provisions.
(v). PP submitted that the total cost of project is 43.39 Crores, however, in
Form 2, it is mentioned that 110 Crores. The Committee asked the PP for
confirmation and PP confirmed that the total cost of the project is 110
Crores. Accordingly, the PP has to revise the CER,Wildlife conservation and
EMP budget.
(vi). PP needs to submit the approved revised wildlife conservation plans (details
of species and their protection plans).
(vii). PP needs to submit the revised year wise budgetary provision for
monitoring and pollution measurement of the mining activities.
(viii). PP requires to submit the details of ore transport mode and the issues arises
due to transportation and the mitigation plans planned for protecting the
environment.
(ix). PP submitted that the ore will be dispatched to JSW steel plant by
tippers/dumpers. PP needs to submit the locations of the plant as well as
distance between the plant and mine. Also submit the details of mitigation
measures to be implemented for minimizing the environmental impact.
(x). PP needs to submit the capacity of crushers and flow chart for crusher and
screening unit and also their working time and impact on the environment.
(xi). PP needs to submit the details of total excavation including total waste
generation.
(xii). PP submitted the action plans for public hearing issues which are generic
and PP needs to submit the revised detailed actions plans with revised
budgetary provisions for the public hearing issues.
(xiii). PP has mentioned in the EIA report that the waste dump areais decreasing
over period of time. It is not clear that whether the dumping is also being
used or not. Accordingly, PP needs to submit the necessaryclarifications for
the same.
(xiv). PP submitted that the written suggestions/objections/queries raised during
public hearing are in local language. PP needs to submit the authenticated
translated copy in English for the same. | 17 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sunil Kumar Singh | Designation | GM Mines | Name of Company (Applicant Name should not be given here) | JSW STEEL LIMITED | Address | JSW Steel Limited, P.O. Vidyanagar, Toranagallu, Sandur Taluk, Ballari District, Karnataka |
|