Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Genext Steels Private Limited
(b)Name of the Company / Organisation GENEXT STEELS PVT LTD
(c)Registered Address 5-4-83 to 85, TSK Chambers, MG Road, Secunderabad,,Hyderabad,Telangana-500003
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Kedia
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 5-4-83 to 85, TSK Chambers, MG Road, Secunderabad,,Secunderabad,Hyderabad,Telangana-500003
(d)Pin code 500003
(e)E-mail genextsteels@gmail.com
(f)STD Code. 40(f)Telephone No. 27537606
(g)Fax No. 27537595
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND/70023/2017
(d)Master Proposal Number(Single Window) SW/101214/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey Nos. 661,662,664,665,1822 & 1823, Village:
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 22.624425
Minutes
Second
From
Degree 22.628572
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.162125
Minutes
Second
From
Degree 72.168319
Minutes
Second
(e)Survey of India Topo Sheet No. F43G2, F43G6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 55
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadBavla
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/501/2017-IA-II(I)
(b)Date of Apply of TOR 30 Sep 2017
(c)Date of Issue of TOR / Standard ToR 11 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Gujarat
District :Ahmedabad
Tehsil :Bavla
Village :Bagodara
113Employment generationOthersAdditional Collector and Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)DRI Kilns4 x 150 TPDRotary Kiln, Kiln Cooler
(2.)Steel Melting Shop8 StrandsContinuous Casting Machine
(3.)Steel Melting Shop4 x 25 MT/heatInduction furnace
(4.)Power Plant1 x 5 MWFBC
(5.)Rolling Mill2 x 500 TPDContinuous Rolling Mill
(6.)Power Plant1 x 7 MWWHRB
(7.)Pellet Plant4 x 200 TPDDisc Pelletizer/Travelling Grate
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pellets800OthersTPDRoad
(2.)MS Billets1000OthersTPDRoad
(3.)Power Plant12Mega Watt(MW)Road
(4.)Sponge Iron600OthersTPDRoad
(5.)Structural steel, TMT bars & Rolled products975OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 261
(b) Funds Allocated for Environment Management (Capital) (in Crores) 40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.22
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1470300
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1470300
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Attached file1470300Tons per AnnumATTACHEDRoad1000 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.29.615.580
(2.)NOxMicro Gram per Meter Cube24.412.118.880
(3.)PM10Micro Gram per Meter Cube77.250.671.6100
(4.)PM2.5Micro Gram per Meter Cube45.52640.660
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.97.56.58.5
(2.)TDSmg/l294819635002000
(3.)Chloridesmg/l14869582501000
(4.)Fluoridemg/l0.720.6311.5
(5.)TSSmg/l11.27.900
(6.)Total Hardnessmg/l447362300600
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.027.46A
(2.)DOmg/l6.64.9B
(3.)BODmg/l00B
(4.)CODmg/l00B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.65075
(2.)Leq(Night)A-weighted decibels(dB(A))45.940.670
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram11798
(2.)P(Phosphorus)Milligram per Kilogram11221
(3.)K(Potassium)Milligram per Kilogram18997
(4.)Electric ConductivityOthersdS/m2.11.6
(5.)pH87.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9050Copy of Permission LetterPipelineOthersborewell21-4/4356/GJ/IND/201807 Sep 2018905
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2020STPReuse within the Plant & Recycling20
(2.)Utility & Water treatment reject110110ETP-RO-MEEReuse within the Plant & Recycling,OthersEvaporation loss9317
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 130
(b)Total Discharged Water (Kilolitre per Day) 17
(c)Total Reused Water (Kilolitre per Day) 113
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP Sludge & MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)216Tons135RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used Lubricating oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre50RoadAuthorized Recyclers
(3.)AshFly Ash21684Tons25RoadOthersCement plant/Brick Manufacturer
(4.)SlagHazardous Waste (as per Hazardous and Other Waste Management rules 2016)28080Tons45RoadOthersSold to brick manufacturers/ for road construction
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube16.181.417.84224.02380
(2.)PM2.5Microgram per Meter Cube34.811.4111.7446.55160
(3.)SO2Microgram per Meter Cube13.181.418.42321.60480
(4.)PM10Microgram per Meter Cube66.161.4111.7477.901100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D G Set (300 kVA x 4 nos.) (Stand by)HSD110.375OthersPM, SO2, NOx0
(2.)D G Set (750 kVA x 4 nos.) (Stand by)HSD150.375OthersPM, SO2, NOx0
(3.)D G Set (300 kVA x 4 nos.) (Stand by)HSD110.375OthersPM, SO2, NOx0
(4.)WHRB boiler (30 TPH)Waste gas generated from imported coal in DRI kiln752OthersPM, SO2, NOx0
(5.)FBC Boiler (25 TPH)Imported Coal & DoloChar301.2OthersPM, SO2, NOx0
(6.)Vents of process area cleaning RotaryKiln 4 nosNA110.45PM100
(7.)Rotary Kiln 4 nosImported Coal481.8OthersPM, SO2, NOx0
(8.)Induction furnace 4 nosElectricity301PM100
(9.)Pellet Plant Kiln 4 nosImported Coal311OthersPM, SO2, NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 57000
(b)Source Captive Power Plant (12 MW) + Gujarat State Electr
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Stand by DG set 300 KVA x 8 Nos. 750 KVA x 4 Nos
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 15.3061
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 15.3061
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 24774.6
(b)Waste/Barren Land (ha.) 4270.4
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 847.8
(e)Settlements (ha.) 910.7
(f)Industrial (ha.) 596.6
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31400.1
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt5.0500
(2.)Built Up Area3.2375
(3.)OthersInternal Road, storage yard, Parking, open area7.0186Internal Road, storage yard, Parking, open area
Total (ha.) 15.3061
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone within 10 km00None within 10 km
(2.)ESZsESZ of Nal Sarovar Birds Sanctuary1.9Towards NNW direction
(3.)Critically Polluted AreaNone within 10 km00None within 10 km
(4.)CorridorsNone within 10 km00None within 10 km
(5.)Wildlife CorridorsNone within 10 km00None within 10 km
(6.)ESAsNone within 10 km00None within 10 km
(7.)WLSNal Sarovar Birds Sanctuary12.4None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km00None within 10 km
(2.)Defence InstallationsNone within 10 km00None within 10 km
(3.)Archaeological SitesLothal14.4None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 15.3061
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond of village Bagodara, Gundanapara, mithapur
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond of village rohika, Shiyal and Dhingada
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 200
(e)No. of working days 26
(f)Total Manpower 700
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.0500
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 4
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialTax payment to govt
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0040
(ii)Name of the EIA Consultant Shivalik Solid Waste Management Limited (SSWML)
(iii)Address Vill: Majra, P.O: Dabhota, Teh: Nalagarh, Distt: Solan (Himachal Pradesh) 174 101
(iv)Mobile No. 8288079366
(v)Landline No. 0179526042
(vi)Email Id s.brahma@beil.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 16 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1.Groundwater abstraction permission shall be furnished. 2.Feasibility for drawl of surface water shall be furnished 3.Feasibility to use railway siding for transportation of materials shall be furnished. 16 Apr 2019
2.NAThe correction have been made as per the instruction received 17 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply of ADS is attached. 12 Nov 2019
2.NAProposal deferred for want of additional information. 06 Nov 2019
3. ADS Reply LetterReply of ADS is uploaded. 07 Oct 2019
4.NA

 Defer the consideration of the project proposal on the request of the PP

14 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Kedia
DesignationDirector
Name of Company (Applicant Name should not be given here)GENEXT STEELS PVT LTD
Address5-4-83 to 85, TSK Chambers, MG Road, Secunderabad
Print