|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Treatment, Storage, Disposal Facility (Incineration only) for Hazardous waste proposed at Plot No. B-28 & 29, Industrial Area, Danewala, Malout-(Punjab) by M/s Sevrin Environ Management Co | (b)Name of the Company / Organisation | SAVRIN ENVIRON MANAGEMENT CO | (c)Registered Address | M/S Savrin Envirin Management Management Co. at plot No. B-28 &29,Industrial Area, Focal, Malout, Muktsar,152107 (Punjab),,Shri Muktsar Sahib,Punjab-152107 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Abhimanyu Goyal | (b)Designation (Owner/ Partner/ CEO) | PARTNER | (c)Address | Plot no. B-03, Indusrial Area, VPO Danewala, Malout, Punjab.,,Malout,Shri Muktsar Sahib,Punjab-152107 | (d)Pin code | 152107 | (e)E-mail | abhishekgarg178@gmail.com | (f)STD Code. | 98885(f)Telephone No. | 45268 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/PB/MIS/76992/2018 | (d)Master Proposal Number(Single Window) | SW/101126/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | B-28 & 29 | (b)Pincode | 152107 | (c)Bounded Latitudes (North) | | From | | Degree | 30.1645 | Minutes | | Second | | From | | Degree | 30.16488 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.51349 | Minutes | | Second | | From | | Degree | 74.5139 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 44J7,44J8,44J11,44J12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 200 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Punjab | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Punjab | Shri Muktsar Sahib | Malout | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-69/2018-IA-III | (c)Date of Apply of TOR | 29 Aug 2018 | (d)Date of Issue of TOR / Standard ToR | 09 Oct 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project “Common Treatment, Storage, Disposal Facil | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | CHWTSDF | 1690.83 m2 | Total Area | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Liquid Waste | 1460 | Others | Kilo Liters Per Annum | Road | | (2.) | Solid Waste | 365 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.78 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.185 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.02 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.028 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 5 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 5 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Liquid Waste | 1460 | Others | Kilo Litres per Annum | Nearby Industries | Road | | 200 | Open Market | | Copy of Linkage | (2.) | Solid Waste | 365 | Tons per Annum | | Nearby Industries | Road | | 200 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 76 | 38 | 73.61 | 60 | (2.) | Others | NH3 | Micro Gram per Meter Cube | 27 | 14 | 26 | 400 | (3.) | PM10 | | Micro Gram per Meter Cube | 130 | 71 | 126 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 30 | 15 | 29 | 80 | (5.) | SO2 | | Micro Gram per Meter Cube | 14 | 7 | 13 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 381 | 145 | 200 | 600 | (2.) | pH | | | NA | | 7.91 | 7 | 6.5 | 8.5 | (3.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 1250 | 530 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 325 | 85 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 1.15 | 0.24 | 1 | 1.5 | (7.) | Heavy Metals | | Zn | mg/l | | 0.05 | 0.05 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.95 | 7.58 | B | (2.) | COD | | mg/l | | 16 | 12 | B | (3.) | DO | | mg/l | | 6.6 | 6.3 | B | (4.) | Others | Total Hardness | mg/l | | 131 | 110 | B | (5.) | BOD | | mg/l | | 5 | 3 | B | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61 | 43 | 55/65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 61 | 43 | 50/60 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.43 | 7.83 | (2.) | N(Nitrogen) | | | 0 | 0 | (3.) | K(Potassium) | Milligram per Kilogram | | 610 | 27.5 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 0.684 | 0.143 | (5.) | P(Phosphorus) | | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.67 To 7.43 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.06 To 7.78 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | PSIEC Supply | 2 | 1 | Copy of Permission Letter | Pipeline | | Others | Pipeline | PSIEC/ESTA/EO/7735 | 27 Jun 2018 | 2 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Waste | 0.8 | 1 | Septic Tank Followed by Soak Pit | Others | NA | 0.8 | 0 | (2.) | Industrial | 0.2 | 0.5 | Used for Wet &Quencher Scrubber | Reuse within the Plant & Recycling | R | 0.2 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Incinerator Ash | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Tons | 230 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 130 | 0 | 0 | 130.1 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 76 | 0 | 0 | 76.1 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 14 | 0 | 0 | 14.1 | 80 | (4.) | NOx | | Microgram per Meter Cube | 30 | 0 | 0 | 30.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Incinerator | Hazardous Waste | 30 | 0.4 | PM10 | | 4.1 | (2.) | Propose DG Set | Diesel | 5 | 0.3 | PM10 | | 0.25 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 50 | (b)Source | PSIECL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 63 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0.1691 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1691 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 26187 | (b)Waste/Barren Land (ha.) | 1989 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 245 | (e)Settlements (ha.) | 2994 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0.1132 | Main Plant Area | (2.) | Green belt | | 0.0559 | Green Belt | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | ESAs | NA | 0 | NA | (3.) | ESZs | NA | 0 | NA | (4.) | Corridors | NA | 0 | NA | (5.) | WLS | NA | 0 | NA | (6.) | NPA | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.1691 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rajasthan Canal | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 4 | (b)Permanent Employment-During Operation | 6 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 10 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.0559 | (b)Percentage of Total Project Area | 33.06 | (c)No. of Plants to be Planted | 110 | (d)Funds Allocated for Plantation | 100000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Common Treatment Storage Facility shall be an important endeavor to mitigate the degradation of environment in the region. | (2.) | Social | The proposed project will provide direct employment to people of the area and business opportunity to feed the demand of project and the people working for the project. Small market will be developed to feed daily demand of the people working for the proposed project. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 1691 | (e)Total built up area (sqm) | 1132 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 5 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0040 | (ii)Name of the EIA Consultant | Shivalik Solid Waste Management Limited | (iii)Address | Ist Floor,sco 20-21, Near Dolphin Dhakoli, Zirakpur, Punjab 140604 | (iv)Mobile No. | 8288079360 | (v)Landline No. | 0176250949 | (vi)Email Id | s.brahma@beil.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 16 Aug 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Abhimanyu Goyal | Designation | PARTNER | Name of Company (Applicant Name should not be given here) | SAVRIN ENVIRON MANAGEMENT CO | Address | M/S Savrin Envirin Management Management Co. at plot No. B-28 &29,Industrial Area, Focal, Malout, Muktsar,152107 (Punjab) |
|