Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Bharat Petroleum Corporation Limited POL Installation Expansion
(b)Name of the Company / Organisation BHARAT PETROLEUM CORPORATION LIMITED CHERLAPALLI POL INSTALLATION
(c)Registered Address BPCL POL Installation, P.B. No:4, HCL, Cherlapalli, Kapra mandal, Medchal District, Telangana,,Medchal,Telangana-500051
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Himanshu Bhadani
(b)Designation (Owner/ Partner/ CEO) AssistantManager
(c)Address BPCL POL Installation, P.B. No 4, HCL, Cherlapalli, Kapra mandal, Telangana,,Kondapoor,Medchal,Telangana-500051
(d)Pin code 500051
(e)E-mail grajashekar@bharatpetroleum.in
(f)STD Code. 891(f)Telephone No. 2755528
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/IND2/101048/2018
(d)Master Proposal Number(Single Window) SW/101043/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 176 to 180 & 183
(b)Pincode 500051
(c)Bounded Latitudes (North)
From
Degree 17.451361
Minutes
Second
From
Degree 78.602519
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 17.451062
Minutes
Second
From
Degree 78.603689
Minutes
Second
(e)Survey of India Topo Sheet No. 56K/10, 56K/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 531
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/331/2018-IA-II(I)
(b)Date of Apply of TOR 16 Oct 2018
(c)Date of Issue of TOR / Standard ToR 18 Nov 2018
(d)Date of Apply of EC 18 Feb 2011
(e)Date of Issue of EC 20 May 2011
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The expansion project is proposed within the exist
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. 336
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 3 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Motor Spirit924709247OthersKilo LitersRail,Pipe Conveyor
(2.)Aviation Turbine Fuel509438008894OthersKilo LitersRail,Pipe Conveyor
(3.)High Speed Diesel27609027609OthersKilo LitersRail,Pipe Conveyor
(4.)Ethanol4000400OthersKilo LitersRail,Pipe Conveyor
(5.)Superior Kerosene Oil305003050OthersKilo LitersRail,Pipe Conveyor
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)POL Storage and Distribution TerminalPOL Storage and Distribution TerminaPOL Storage and Distribution TerminaPOL Storage and Distribution Termina
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Jan 2017
(iv)Valid Upto 31 Dec 2021
(v)File No. 17082533397
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.33
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.071
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3800
(b)Existing quantity of raw material/fuel 5094
(c)Total quantity of raw material/fuel 8894
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)POL products0OthersKLNARail,Pipe Conveyor0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube38.618.1060
(2.)SO2Micro Gram per Meter Cube19.48.5080
(3.)NOxMicro Gram per Meter Cube21.79.0080
(4.)PM10Micro Gram per Meter Cube68.341.70100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4654285002000
(2.)Total Hardnessmg/l469238300600
(3.)Chloridesmg/l46.437.12501000
(4.)Heavy MetalsIronmg/l0.120.070.30.3
(5.)pHNA7.57.16.58.5
(6.)TSSmg/l9400
(7.)Fluoridemg/l0.970.691.01.5
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.45.9E
(2.)BODmg/l1.31.1E
(3.)pHNA7.57.1E
(4.)CODmg/l3.93.3E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))51.146.9Industrial 70 / Residential 45
(2.)Leq(Day)A-weighted decibels(dB(A))62.959.2Industrial 75 / Residential 55
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.47.1
(2.)N(Nitrogen)Kilogram per hectare11299
(3.)P(Phosphorus)Kilogram per hectare46.241.9
(4.)K(Potassium)Kilogram per hectare206187
(5.)Electric ConductivityOthersmicro siemens per centimeter191170
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.6 To 9.4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2.80Copy of Permission LetterPipelineOthersBore well018 Nov 20182.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage1.51.5septic tank followed by soak pitGreen Belt Renewal Plant1.5
(2.)Tank washings1.21.2OWSReuse within the Plant & Recycling1.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)GarbageMunicipal Solid Waste10Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube00010
(2.)NOxMicrogram per Meter Cube00010
(3.)PM2.5Microgram per Meter Cube00010
(4.)PM10Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD90OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 240
(b)Source Existing plant, power from Southern Power Distribu
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 60, 380, 250 and 20 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 8.134
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.134
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 8.134
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 8.134
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant6.83
(2.)Green belt1.29
Total (ha.) 8.12
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)WLSNA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)Critically Polluted AreaNA0NA
(6.)ESAsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence Installations000
(3.)OthersWater bodiesRampalli cheruvu2.33NA
(4.)ForestChengicherla RF0.42NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.314
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Rampalli Cheruvu
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.33
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 250
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.2003.2
(2.)Percentage of Total Project Area000
(3.)No. of Plants120001200
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialAvailability of ATF
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 148
(ii)Name of the EIA Consultant SV Enviro Labs and Consultants
(iii)Address Enviro House, B-1, Block B, IDA, Autonagar, Visakhapatnam
(iv)Mobile No. 9440338628
(v)Landline No. 0891275552
(vi)Email Id svenviro_labs@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Relevant details to be filled in column 6 of Form-2, along with a copy of the EC dated 20/5/2001. - CTO dated 17/1/2017 is for storage of many more petroleum products. Whereas, the present proposal shows existing facilities for ATF (7400 kl) only. - Copy of the ToR dated 21/11/2018 to be attached. - Justification for exemption from public hearing. Whether the same has been allowed by the concerned regulatory authority and/or in conformity with the extant norms/guidelines in this regard. 13 Apr 2019
2.NAThe correction have been made as per the instruction received 13 Apr 2019
3.NAPlease confirm the existing POL storage facilities/capacity as mentioned in para 9(b) of Form-2, only after obtaining prior EC from the concerned regulatory authority. All the supporting documents need to be attached. 13 Apr 2019
4.NAThe correction have been made as per the instruction received 02 Aug 2019
5.NAIn view of the Ministry's Notification dated 13/6/2019, the proposal may be examined for the requirement of prior EC. 03 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHimanshu Bhadani
DesignationAssistantManager
Name of Company (Applicant Name should not be given here)BHARAT PETROLEUM CORPORATION LIMITED CHERLAPALLI POL INSTALLATION
AddressBPCL POL Installation, P.B. No:4, HCL, Cherlapalli, Kapra mandal, Medchal District, Telangana
Print