Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Onshore Oil & Gas Development & Production, EPS & Laying of Pipeline in Duarmara Block, Margherita, District-Tinsukia, Assam by M/s Oilmax Energy Private Limited.
(b)Name of the Company / Organisation OILMAX ENERGY PRIVATE LIMITED
(c)Registered Address 3-A,Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion (E), Mumbai,,Tinsukia,Assam-400022
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rabi Bastia
(b)Designation (Owner/ Partner/ CEO) President
(c)Address 3-A, Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion East, Mumbai,,Pynursla,Mumbai (Suburban),Maharashtra-400022
(d)Pin code 400022
(e)E-mail oilmaxenergy.ec@gmail.com
(f)STD Code. 22(f)Telephone No. 42441100
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/AS/IND2/71746/2017
(d)Master Proposal Number(Single Window) SW/100796/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. not applicable
(b)Pincode 786160
(c)Bounded Latitudes (North)
From
Degree 27.26
Minutes
Second
From
Degree 27.28
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 95.41
Minutes
Second
From
Degree 95.43
Minutes
Second
(e)Survey of India Topo Sheet No. G46F10, G46F14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 156
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamTinsukiaMargherita
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/575/2017-IA-II(I)
(b)Date of Apply of TOR 21 Dec 2017
(c)Date of Issue of TOR / Standard ToR 22 Feb 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :3
Community Hall, Dhekiajan, Raja Ali JFMC, Under Digboi Forest Division in Khal Gaon
State :Assam
District :Tinsukia
Tehsil :Margherita
Village :Dekiajan
119Employment, Social responsibilityOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Drilling rig equipment & facilities1000 HP
(2.)Drilling rig equipment & facilities2000 HP
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Facilities and wells24.75HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 120
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.8
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FUEL4Kilo Litre per DayLocalRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube50.122.849.8100
(2.)PM2.5Micro Gram per Meter Cube26.112.225.560
(3.)SO2Micro Gram per Meter Cube6.556.480
(4.)NOxMicro Gram per Meter Cube14.16.614.080
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Total Hardnessmg/l11260200600
(3.)Chloridesmg/l56272501000
(4.)pHNA6.836.566.58.5
(5.)TDSmg/l192985002000
(6.)Fluoridemg/l0.510.1811.5
(7.)Heavy MetalsLeadmg/l0.0010.0010.0010.001
(8.)OthersSulphatemg/l123200400
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.017.65C
(2.)DOmg/l6.44.1C
(3.)BODmg/l3.12C
(4.)OthersTDSmg/l7642C
(5.)CODmg/l2112C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))48.244.155
(2.)Leq(Night)A-weighted decibels(dB(A))41.135.845
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare82.429.6
(2.)K(Potassium)Kilogram per hectare367196
(3.)Electric ConductivityMillisiemens per Centimetre0.2140.046
(4.)pH6.525.66
(5.)N(Nitrogen)Kilogram per hectare378253
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker supply205Copy of Permission LetterPipelineOthersTanker supplyxyz01 Mar 201920
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater1020Modular STPOthersSoak Pit55
(2.)Drilling and rig wash45Mobie ETPReuse within the Plant & Recycling4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 14
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill cuttingsIndustrial Waste250Tons1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube50.10.20.4850.6100
(2.)PM2.5Microgram per Meter Cube26.10.20.026.260
(3.)SO2Microgram per Meter Cube6.50.20.1056.6180
(4.)NOxMicrogram per Meter Cube14.10.20.3914.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETHSD180.52SO20.106
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source DG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVA X 1
(e)Stack Height (in m) 18
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 9.3
(b)Private Land (ha.) 0
(c)Government Land (ha.) 15.45
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 24.75
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 1595.92
(c)Grazing/ Community Land (ha.) 8812.68
(d)Surface Water Bodies (ha.) 1836.52
(e)Settlements (ha.) 2224.28
(f)Industrial (ha.) 0
(g)Forest (ha.) 14413.11
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Rail, Roads 2589.18
    Total (ha.) 31471.690000000002
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant24.25
(2.)OthersDrilling0.5
Total (ha.) 24.75
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Not applicable
(2.)NPANil0Not applicable
(3.)ESZsNil0Not applicable
(4.)WLSNil0Not applicable
(5.)ESAsNil0Not applicable
(6.)Wildlife CorridorsNil0Not applicable
(7.)CorridorsNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Not applicable
(2.)ForestDekiajan Forest0Reserve Forest within Duarmara block area
(3.)Defence InstallationsNil0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 24.75
(c)Status of Land acquisition if not acquired Ongoing
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area DoomDooma River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dehing River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 25
(e)No. of working days 365
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.8
(b)Percentage of Total Project Area 3.23
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - As per the ToR dated 22/2/2018, 9 well were proposed to be drilled in the said Block. It is shown as nine in the proposal for EC (Form-2). - Present status of the proposal dated 16/2/2018 for diversion of 9.3 ha of forest land involved under the project. Also, in view of the said forest land, entry at column 23.3 & 24 are not consistent. - Land acquisition status for 22.5 ha of the proposed project area. 31 Mar 2019
2.NAThe correction have been made as per the instruction received 17 Apr 2019
3.NAIn view of the present land acquisition status for 24.75 ha of land, please inform about any allotment of the said land in your name. Entry at item no.27(f) of Form-2 is also not clear. All the details mentioned in Form-2 need to be rechecked and confirmed. 28 Apr 2019
4.NAThe correction have been made as per the instruction received 14 May 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterFC stage-I along with letter is attached. 02 Jan 2024
2.NAFC-I to be submitted for consideration. 18 Dec 2020
3. ADS Reply LetterFRA 15 Dec 2020
4.NAThe information submitted by the PP vide ADS letter dated 05.03.2020 which are incomplete. PP once again requested to submit the details as sought by the Ministry vide dated 19.09.2019 immediately for further necessary action. 'Stage-1 forest clearance shall be submitted for the forest area involved under the project as per the provisions of the Forest (Conservation) Act, 1980. No drilling/installation of associated facilities shall be carried out in forest areas without prior permission from the concerned regulatory authority. Project Proponent may be requested through the online portal of the Ministry to submit the details of the Stage-1 forest clearance, for further action into the matter. 17 Mar 2020
5. ADS Reply LetterNA 05 Mar 2020
6.NA'Stage-1 forest clearance shall be submitted for the forest area involved under the project as per the provisions of the Forest (Conservation) Act, 1980. No drilling/installation of associated facilities shall be carried out in forest areas without prior permission from the concerned regulatory authority. Project Proponent may be requested through the online portal of the Ministry to submit the details of the Stage-1 forest clearance, for further action into the matter. 19 Sep 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRabi Bastia
DesignationPresident
Name of Company (Applicant Name should not be given here)OILMAX ENERGY PRIVATE LIMITED
Address3-A,Omkar Esquare, Off Chunnabhatti Signal, Eastern Express Highway, Sion (E), Mumbai
Print