Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Lanjiberna Limestone and Dolomite Mine (M.L. Area - 873.057 ha) with expansion in Production Capacity from 4.2 million TPA Limestone & 0.08 million TPA Dolomite to 9.5 million TPA Limestone & 0.08 mil
(b)Name of the Company / Organisation OCL INDIA LTD
(c)Registered Address Hansalya Building, 12th Floor, 15, Barakhamba Road, New Delhi,,Central,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sunil Kumar Gupta
(b)Designation (Owner/ Partner/ CEO) ExecutiveDirector
(c)Address Rajgangpur, Sundargarh, Odisha,,Rajagangapur,Sundargarh,Orissa-770017
(d)Pin code 770017
(e)E-mail ocl_rajgangpur@dalmiacement.com
(f)STD Code. 11(f)Telephone No. 221212
(g)Fax No. 23313303
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/OR/MIN/100679/2016
(d)Master Proposal Number(Single Window) SW/100678/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Enclosed with EIA Report
(b)Pincode 770011
(c)Bounded Latitudes (North)
From
Degree 22143196383
Minutes
Second
From
Degree 221537.47389
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 842910.73846
Minutes
Second
From
Degree 84361779270
Minutes
Second
(e)Survey of India Topo Sheet No. 76B/7, 76B/8, 76B/11, 76B/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 280
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/202/2016-IA-II(M)
(c)Date of Issue of TOR 16 Dec 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 25 Oct 2019
(c)Date of Issue of EC 04 Mar 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :2
In front of Playground gate of Dalmia ITI industrial training institute (DITI) of Jhagarpur G.P., Block:Rajgangpur
State :Orissa
District :Sundargarh
Tehsil :Rajagangapur
Village :Jhagarpur
3000Issues raised during public hearing were about Employments to the local unemployed youths,Social Welfare activities like Drinking water facility, Electricity facility,Health care facilitOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-70/EPE,101-190/EPE,101673/EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Nov 16 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Dolomite80000080000Tons per Annum(TPA)Conveyor Belt
(2.)Lanjiberna Limestone and Dolomite Mine873.0570873.057Hectares(ha)Others.
(3.)Limestone420000053000009500000Tons per Annum(TPA)Conveyor Belt
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Dumpers of 50 tonner101525.
(2.)Crusher (Aggregate) 200 TPH202.
(3.)Water Tanker 18 KL112.
(4.)Explosive Van112.
(5.)Tractor101.
(6.)Primary Rock breaker attachment112.
(7.)Crusher 1600 TPH011.
(8.)Water Tanker 10 KL1010
(9.)Pumps10212.
(10.)Shovel (Hydraulic) 1.00 CuM101.
(11.)Air Compressors235.
(12.)Dozer235.
(13.)Crusher 1200 TPH101.
(14.)Dumpers of 35 tonner161531.
(15.)Road Roller112.
(16.)Other HEM Machinery8as required8.
(17.)Rock Drill426.
(18.)Shovel (Hydraulic) 4.00 CuM549.
(19.)Crusher 400 TPH101.
(20.)Terminator Attachment112.
(21.)Motor Grader112.
(22.)Shovel (Hydraulic) 6.00CuM549.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 23 Mar 2017
(iv)Valid Upto 31 Mar 2019
(v)File No. 4449/IND-I-CON-258
(vi)Application No. 1454336
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.80
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 400
(b)Existing quantity of raw material/fuel 450
(c)Total quantity of raw material/fuel 850
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD850OthersKilo litreOpen marketRoad200 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube26.38.624.8180
(2.)SO2Micro Gram per Meter Cube11.85.211.2180
(3.)PM2.5Micro Gram per Meter Cube40.221.539.4360
(4.)PM10Micro Gram per Meter Cube87.652.984.59100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.436.696.88.5
(2.)TSSmg/l....
(3.)Heavy Metals.NA....
(4.)Fluoridemg/l0.950.121.01.5
(5.)Chloridesmg/l95.9423.822501000
(6.)TDSmg/l5621645002000
(7.)Total Hardnessmg/l45696.50200600
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l33.605.80D
(2.)CODmg/l92.8016.28D
(3.)pHNA7.727.13D
(4.)DOmg/l4.904.10D
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.441.4I-70-75, C-55-65, R-45-55, S-40-50
(2.)Leq(Night)A-weighted decibels(dB(A))67.449.8I-70-75,C-55-65,R-45-55,S-40-50
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram316.15176.35
(2.)Electric Conductivity0.200.11
(3.)N(Nitrogen)Milligram per Kilogram250.75186.40
(4.)P(Phosphorus)Milligram per Kilogram35.0421.32
(5.)pH7.867.18
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.60 To 62.90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 08.20 To 55.20
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/1311/OR/MIN/2017-2277
(f)Date of Issue 07 Dec 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGround water and seepage water5090Copy of Permission LetterPipelineTube Well21-4/1311/OR/MIN/2017-227707 Dec 20181469
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop1225ETPReuse within the Plant & Recycling12
(2.)Domestic4545Soak Pit via septic tankOthersSoak pit via septic tank045
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 57
(b)Total Discharged Water (Kilolitre per Day) 45
(c)Total Reused Water (Kilolitre per Day) 12
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste/RejectsOthersRejects/waste7420000Tons100RoadOthersSell, stored and remaining backfilled
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube36.403.040.060
(2.)SO2Microgram per Meter Cube11.203.715.080
(3.)PM10Microgram per Meter Cube76.504.280.8100
(4.)NOxMicrogram per Meter Cube21.503.124.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Crusher 1 & 3.301PM10Covered in GLC due to mine
(2.)Crusher 2.301.8PM10Covered in GLC due to mine
(3.)Crusher 4.301.8PM10Covered in GLC due to MIne
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4.3
(b)Source captive power plant & WHRS at plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) None
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 62.56
(b)Private Land (ha.) 745.097
(c)Government Land (ha.) 65.40
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 873.057
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 745.097
(b)Waste/Barren Land (ha.) 65.40
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 62.56
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : . 0
    Total (ha.) 873.057
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant10.72Includes Workshopcrusheradminbuildingmagazine
(2.)Township0.12
(3.)Green belt70.441.
(4.)Ash Pond0
(5.)Quarry Area484.826
(6.)OB Dump Area81.0
(7.)Safety Zone102.199
(8.)Tailing Pond0
(9.)OthersUndisturbed area, road123.751
Total (ha.) 873.057
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Corridorsnone..
(2.)ESZsnone..
(3.)Wildlife Corridorsnone..
(4.)NPAnone..
(5.)Critically Polluted AreaNone.no
(6.)WLSNone..
(7.)ESAsnone..
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone..
(2.)Defence InstallationsNone..
(3.)Forest19 RF & 2 PF.ranges from 1.5 to 9.0 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserved forest and DLC
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) .
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 333.43
(b)Land yet to be acquired(Ha) 539.627
(c)Status of Land acquisition if not acquired .
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 9
(b)No. of Households 300
(c)No. of PDFs (Project Displaced Families) 300
(d)No. of PAFs (Project Affected Families) 426
(e)Funds Allocated for R&R(in INR) (in Lacs) .
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 2
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pada Nadi
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 572
(c)Temporary Employment- During Construction 87
(d)Temporary Employment- During Operation 30
(e)No. of working days 309
(f)Total Manpower 689
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt84.89286.16371.05
(2.)Percentage of Total Project Area9.7232.7742.49
(3.)No. of Plants3234507154001038850
(4.)Funds Allocated3.1514.30817.458
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe proposed expansion project will contribute about Rs. 100 crores to the State and Central Govt. in the form of royalty, DMF, NMET etc
(2.)SocialThe Project has generated positive direct and indirect employment. Manpower is required for mining operations and other mining related activities such as transportation, day to day operations etc. Preference will be given to the local people for employment based on their qualification and eligibility in the mines. The expansion project has a manpower requirement of 689 persons
(3.)EnvironmentalAt the conceptual stage, out of the total lease area (i.e. 873.057 ha), mined out area will be 484.826 ha, out of which, 117.410 ha area will be backfilled & reclaimed by plantation and rest 367.416 ha area will be developed as rainwater storage. Green belt development/Plantation will be done on 371.050 ha including green belt over 70.441 ha along 7.5m barrier zone & road and plantation on 81 ha dump area, 117.410 ha on backfilled area, 102.199 ha on safety zone left for magazine, village & wate
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
(2.)DolomiteMinor
2.
Mine Capacity in ROM (Run of Mine) 17.0 total excavation
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MSM/FM/37-ORI/BHU/2017-18
(b)Date of Approval 25 Jan 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 873.057
(f)Approved Capacity 17
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 152.94
(b)Mineable Reserves (Million Ton) 87.87
(c)Extractable Reserves(Million Ton) 87.87
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral cement grade
(f)Stripping Ratio 1 : 0.82
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) None
(h)Average Gradient(Degree) 65
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)41600 Peak rated capacity of crusher is 1800 TPH Average feed rate is 1600 TPH
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 873.057
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease has already been granted
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 873.057
(iii)Validity of the lease deed From : 01 Mar 1990 To : 29 Feb 2040
(iv)Date of Execution of Mining Lese 29 Jan 1997
(v)Reference Number 80
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease has already been granted
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 12
(ii)Total Area (in Hectare) 81.0
(iii)Height (in meter) 45
(iv)Quantity (in Million Cubic meter) 24.952
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 367.416
(b)Depth (in meter) 99
(c)Volume (in Million Cubic meter) 227
12.
Details of Quarry:
(a)Final Void of 367.416 (hectare) at a Depth of 99 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 484.826
13.
Details of Transportation:
(a)In Pit/Underground to Surface For transportation of limestone/reject to crusher
(b)Surface to Siding/Loading none
(c)Transportation / Conveyor Details conveyor
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)SURFACE WATER BODIES000
(3.)SETTLEMENTS000
(4.)AGRICULTURE LAND745.0970745.097
(5.)FOREST LAND62.56062.56
(6.)WASTE LAND65.40065.4
TOTAL873.0570873.057
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)OtherInfrastructure, NGT, Transmission line00125.31125.31
(3.)EXCAVATION/QUARRY117.410367.4160484.826
(4.)ROADS0000
(5.)VIRGIN AREA0000
(6.)INTERNAL OB DUMPS81.00081
(7.)TOP SOIL STORAGE0000
(8.)BUILT UP AREA (COLONY/OFFICE)000.120.12
(9.)GREEN BELT172.6400172.64
TOTAL371.05367.416125.430863.896
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 81.0
(c)Quarry(in hectare) 484.826
(d)Safety Zone(in hectare) 20.981
(e)Final Void of 367.416 (hectare) at a Depth of 99 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 19.98
(h)Total afforestation plant (in hectare) 371.050
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan Given in attched doc
Total Area Excavated (in hectare) 140.51
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)199798.584000821200822072.570822072.570
(2.)20002001780000584000800000842744.380258744.380
(3.)20012002780000584000800000919326.270335326.000
(4.)200520061700000170000017720501194132.500.
(5.)20042005..15520059737.50059737.500
(6.)201720188000080000737375572.000.
(7.)20052006800008000010880012360.500.
(8.)20122013800008000074700840.000.
(9.)2004200578000017000001501320887266.500107266.500
(10.)200820091700000170000042328501341508.000.
(11.)199495.....
(12.)199596...18348.00018348.000
(13.)201120128000080000116716840.000.
(14.)199091...777279.810777279.810
(15.)199192...830541.460830541.460
(16.)199495.584000821200802119.430802119.430
(17.)199596.584000821200840492.900840492.900
(18.)199697.584000821200801544.110801544.110
(19.)199899.584000821200685892.850685892.850
(20.)19992000.584000800000788301.620788301.620
(21.)2002200378000058400080000096008.000376008.000
(22.)200320047800001022000800000977044.500197044.500
(23.)20062007170000017000001753290114511.500.
(24.)200720081700000170000025441801235106.000.
(25.)201020114200000170000041202662301986.500601986.500
(26.)201320144200000420000042000002640415.500.
(27.)201420154200000420000042000002789670.500.
(28.)201620174200000420000043587103828182.640.
(29.)199394...4079.0004079.000
(30.)199899...14167.00014167.000
(31.)19992000...60171.00060171.000
(32.)20012002...134230.000134230.000
(33.)20072008800008000017440019558.500.
(34.)200820098000080000784405988.500.
(35.)200920108000080000728001416.000.
(36.)2010201180000800001167161620.690.
(37.)2013201480000800007200052936.000.
(38.)201520168000080000635351457.000.
(39.)201520164200000420000041696503539799.500.
(40.)201720184200000420000043896904150721.000.
(41.)199697.....
(42.)20002001...121396.000121396.000
(43.)20022003...32767.00032767.000
(44.)199293.584000.813445.840813445.840
(45.)199394.5840001020695811251.070811251.070
(46.)2009201017000000170000038642601671798.500.
(47.)201120124200000420000042434601699787.500.
(48.)199798...1058.0001058.000
(49.)201620178000080000554791024.000.
(50.)201220134200000420000042000002829234.500.
(51.)20032004...49589.50049589.500
(52.)200620078000080000.9469.5009469.500
(53.)2014201580000800007920034488.000.
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Orissa
(d)Case No. WP(c)/15143 of 2013)
(e)Orders/Directions of the court ,if any and its relevance with the proposed project sub juidice
(f)Case Details Stamp duty
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt Ltd
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAYou are requested to submit the following information 1. Copy of letter of authorization for the applicant 2.Copy of FC documents 4. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018 5. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. 6. Current Status of the Court cases 7. The details of Schedule-I species present, it Conservation plan. 08 Aug 2019
2.NAThe correction have been made as per the instruction received 25 Oct 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are herewith submitting the ADS Reply 31 Dec 2019
2.NA

PP submitted the compliance response to ToR conditions and presented the other details including site photographs and .kml files before EAC. Based on the presentation made by PP and the discussion held, the Committee observed the following and deferred the proposal for want of requisite information for further consideration.

(i).       PP needs to refurbish the R & R plan for village within the lease area. Specifically the details of percentage of money going to spend for compensation of villagers.

Print