1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Lanjiberna Limestone and Dolomite Mine (M.L. Area - 873.057 ha) with expansion in Production Capacity from 4.2 million TPA Limestone & 0.08 million TPA Dolomite to 9.5 million TPA Limestone & 0.08 mil | (b)Name of the Company / Organisation | OCL INDIA LTD | (c)Registered Address | Hansalya Building, 12th Floor, 15, Barakhamba Road, New Delhi,,Central,Delhi-110001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sunil Kumar Gupta | (b)Designation (Owner/ Partner/ CEO) | ExecutiveDirector | (c)Address | Rajgangpur, Sundargarh, Odisha,,Rajagangapur,Sundargarh,Orissa-770017 | (d)Pin code | 770017 | (e)E-mail | ocl_rajgangpur@dalmiacement.com | (f)STD Code. | 11(f)Telephone No. | 221212 | (g)Fax No. | 23313303 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 2(b) Mineral beneficiation
| (b)Category | A | (c)Proposal Number | IA/OR/MIN/100679/2016 | (d)Master Proposal Number(Single Window) | SW/100678/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Enclosed with EIA Report | (b)Pincode | 770011 | (c)Bounded Latitudes (North) | | From | | Degree | 22143196383 | Minutes | | Second | | From | | Degree | 221537.47389 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 842910.73846 | Minutes | | Second | | From | | Degree | 84361779270 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 76B/7, 76B/8, 76B/11, 76B/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 280 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/202/2016-IA-II(M) | (c)Date of Issue of TOR | 16 Dec 2016 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 25 Oct 2019 | (c)Date of Issue of EC | 04 Mar 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 03 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| In front of Playground gate of Dalmia ITI industrial training institute (DITI) of Jhagarpur G.P., Block:Rajgangpur | State : | Orissa | District : | Sundargarh | Tehsil : | Rajagangapur | Village : | Jhagarpur |
| 3000 | Issues raised
during public
hearing were
about
Employments
to the local
unemployed
youths,Social
Welfare
activities like
Drinking
water facility,
Electricity
facility,Health
care facilit | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-70/EPE,101-190/EPE,101673/EPE | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 16 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Dolomite | 80000 | 0 | 80000 | Tons per Annum(TPA) | | Conveyor Belt | | (2.) | Lanjiberna Limestone and Dolomite Mine | 873.057 | 0 | 873.057 | Hectares(ha) | | Others | . | (3.) | Limestone | 4200000 | 5300000 | 9500000 | Tons per Annum(TPA) | | Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Dumpers of 50 tonner | 10 | 15 | 25 | . | (2.) | Crusher (Aggregate) 200 TPH | 2 | 0 | 2 | . | (3.) | Water Tanker 18 KL | 1 | 1 | 2 | . | (4.) | Explosive Van | 1 | 1 | 2 | . | (5.) | Tractor | 1 | 0 | 1 | . | (6.) | Primary Rock breaker attachment | 1 | 1 | 2 | . | (7.) | Crusher 1600 TPH | 0 | 1 | 1 | . | (8.) | Water Tanker 10 KL | 1 | 0 | 1 | 0 | (9.) | Pumps | 10 | 2 | 12 | . | (10.) | Shovel (Hydraulic) 1.00 CuM | 1 | 0 | 1 | . | (11.) | Air Compressors | 2 | 3 | 5 | . | (12.) | Dozer | 2 | 3 | 5 | . | (13.) | Crusher 1200 TPH | 1 | 0 | 1 | . | (14.) | Dumpers of 35 tonner | 16 | 15 | 31 | . | (15.) | Road Roller | 1 | 1 | 2 | . | (16.) | Other HEM Machinery | 8 | as required | 8 | . | (17.) | Rock Drill | 4 | 2 | 6 | . | (18.) | Shovel (Hydraulic) 4.00 CuM | 5 | 4 | 9 | . | (19.) | Crusher 400 TPH | 1 | 0 | 1 | . | (20.) | Terminator Attachment | 1 | 1 | 2 | . | (21.) | Motor Grader | 1 | 1 | 2 | . | (22.) | Shovel (Hydraulic) 6.00CuM | 5 | 4 | 9 | . | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 23 Mar 2017 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | 4449/IND-I-CON-258 | (vi)Application No. | 1454336 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 70 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.80 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 400 | (b)Existing quantity of raw material/fuel | 450 | (c)Total quantity of raw material/fuel | 850 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 850 | Others | Kilo litre | Open market | Road | | 200 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 26.3 | 8.6 | 24.81 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 11.8 | 5.2 | 11.21 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 40.2 | 21.5 | 39.43 | 60 | (4.) | PM10 | | Micro Gram per Meter Cube | 87.6 | 52.9 | 84.59 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.43 | 6.69 | 6.8 | 8.5 | (2.) | TSS | | | mg/l | | . | . | . | . | (3.) | Heavy Metals | | . | NA | | . | . | . | . | (4.) | Fluoride | | | mg/l | | 0.95 | 0.12 | 1.0 | 1.5 | (5.) | Chlorides | | | mg/l | | 95.94 | 23.82 | 250 | 1000 | (6.) | TDS | | | mg/l | | 562 | 164 | 500 | 2000 | (7.) | Total Hardness | | | mg/l | | 456 | 96.50 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 33.60 | 5.80 | D | (2.) | COD | | mg/l | | 92.80 | 16.28 | D | (3.) | pH | | NA | | 7.72 | 7.13 | D | (4.) | DO | | mg/l | | 4.90 | 4.10 | D | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.4 | 41.4 | I-70-75, C-55-65, R-45-55, S-40-50 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 67.4 | 49.8 | I-70-75,C-55-65,R-45-55,S-40-50 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 316.15 | 176.35 | (2.) | Electric Conductivity | | | 0.20 | 0.11 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 250.75 | 186.40 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 35.04 | 21.32 | (5.) | pH | | | 7.86 | 7.18 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10.60 To 62.90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 08.20 To 55.20 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/1311/OR/MIN/2017-2277 | (f)Date of Issue | 07 Dec 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Ground water and seepage water | 509 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/1311/OR/MIN/2017-2277 | 07 Dec 2018 | 1469 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshop | 12 | 25 | ETP | Reuse within the Plant & Recycling | | 12 | | (2.) | Domestic | 45 | 45 | Soak Pit via septic tank | Others | Soak pit via septic tank | 0 | 45 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 57 | (b)Total Discharged Water (Kilolitre per Day) | 45 | (c)Total Reused Water (Kilolitre per Day) | 12 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Waste/Rejects | Others | Rejects/waste | 7420000 | Tons | 100 | Road | | Others | Sell, stored and remaining backfilled | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 36.4 | 0 | 3.0 | 40.0 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 11.2 | 0 | 3.7 | 15.0 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 76.5 | 0 | 4.2 | 80.8 | 100 | (4.) | NOx | | Microgram per Meter Cube | 21.5 | 0 | 3.1 | 24.7 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Crusher 1 & 3 | . | 30 | 1 | PM10 | | Covered in GLC due to mine | (2.) | Crusher 2 | . | 30 | 1.8 | PM10 | | Covered in GLC due to mine | (3.) | Crusher 4 | . | 30 | 1.8 | PM10 | | Covered in GLC due to MIne | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4.3 | (b)Source | captive power plant & WHRS at plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | None | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 62.56 | (b)Private Land (ha.) | 745.097 | (c)Government Land (ha.) | 65.40 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 873.057 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 745.097 | (b)Waste/Barren Land (ha.) | 65.40 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 62.56 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : . | 0 | Total (ha.) | 873.057 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 10.72 | Includes Workshopcrusheradminbuildingmagazine | (2.) | Township | | 0.12 | | (3.) | Green belt | | 70.441 | . | (4.) | Ash Pond | | 0 | | (5.) | Quarry Area | | 484.826 | | (6.) | OB Dump Area | | 81.0 | | (7.) | Safety Zone | | 102.199 | | (8.) | Tailing Pond | | 0 | | (9.) | Others | Undisturbed area, road | 123.751 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | none | . | . | (2.) | ESZs | none | . | . | (3.) | Wildlife Corridors | none | . | . | (4.) | NPA | none | . | . | (5.) | Critically Polluted Area | None | . | no | (6.) | WLS | None | . | . | (7.) | ESAs | none | . | . | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | . | . | (2.) | Defence Installations | | None | . | . | (3.) | Forest | | 19 RF & 2 PF | . | ranges from 1.5 to 9.0 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Reserved forest and DLC | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | . | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 333.43 | (b)Land yet to be acquired(Ha) | 539.627 | (c)Status of Land acquisition if not acquired | . | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 9 | (b)No. of Households | 300 | (c)No. of PDFs (Project Displaced Families) | 300 | (d)No. of PAFs (Project Affected Families) | 426 | (e)Funds Allocated for R&R(in INR) (in Lacs) | . | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 2 | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pada Nadi | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 1.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 572 | (c)Temporary Employment- During Construction | 87 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 309 | (f)Total Manpower | 689 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 84.89 | 286.16 | 371.05 | (2.) | Percentage of Total Project Area | 9.72 | 32.77 | 42.49 | (3.) | No. of Plants | 323450 | 715400 | 1038850 | (4.) | Funds Allocated | 3.15 | 14.308 | 17.458 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The proposed expansion project will contribute about Rs. 100 crores to the State and Central Govt. in the form of royalty, DMF, NMET etc | (2.) | Social | The Project has generated positive direct and indirect employment. Manpower is
required for mining operations and other mining related activities such as transportation,
day to day operations etc. Preference will be given to the local people for employment
based on their qualification and eligibility in the mines. The expansion project has a
manpower requirement of 689 persons | (3.) | Environmental | At the conceptual stage, out of the total lease area (i.e. 873.057 ha), mined out area
will be 484.826 ha, out of which, 117.410 ha area will be backfilled & reclaimed by
plantation and rest 367.416 ha area will be developed as rainwater storage. Green belt
development/Plantation will be done on 371.050 ha including green belt over 70.441 ha
along 7.5m barrier zone & road and plantation on 81 ha dump area, 117.410 ha on
backfilled area, 102.199 ha on safety zone left for magazine, village & wate | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | (2.) | Dolomite | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 17.0 total excavation | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MSM/FM/37-ORI/BHU/2017-18 | (b)Date of Approval | 25 Jan 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 873.057 | (f)Approved Capacity | 17 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 152.94 | (b)Mineable Reserves (Million Ton) | 87.87 | (c)Extractable Reserves(Million Ton) | 87.87 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | cement grade | (f)Stripping Ratio | 1 : 0.82 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | None | (h)Average Gradient(Degree) | 65 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 10 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 4 | 1600 | Peak rated capacity of crusher is 1800 TPH Average feed rate is 1600 TPH | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 873.057 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Lease has already been granted | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 873.057 | (iii)Validity of the lease deed | From : 01 Mar 1990 To : 29 Feb 2040 | (iv)Date of Execution of Mining Lese | 29 Jan 1997 | (v)Reference Number | 80 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Lease has already been granted | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 12 | (ii)Total Area (in Hectare) | 81.0 | (iii)Height (in meter) | 45 | (iv)Quantity (in Million Cubic meter) | 24.952 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 367.416 | (b)Depth (in meter) | 99 | (c)Volume (in Million Cubic meter) | 227 | |
|
12. | Details of Quarry: | (a)Final Void of 367.416 (hectare) at a Depth of 99 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 484.826 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | For transportation of limestone/reject to crusher | (b)Surface to Siding/Loading | none | (c)Transportation / Conveyor Details | conveyor | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | GRAZING LAND | | 0 | 0 | 0 | (2.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (3.) | SETTLEMENTS | | 0 | 0 | 0 | (4.) | AGRICULTURE LAND | | 745.097 | 0 | 745.097 | (5.) | FOREST LAND | | 62.56 | 0 | 62.56 | (6.) | WASTE LAND | | 65.40 | 0 | 65.4 | |
TOTAL | 873.057 | 0 | 873.057 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (2.) | Other | Infrastructure, NGT, Transmission line | 0 | 0 | 125.31 | | 125.31 | (3.) | EXCAVATION/QUARRY | | 117.410 | 367.416 | 0 | | 484.826 | (4.) | ROADS | | 0 | 0 | 0 | | 0 | (5.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (6.) | INTERNAL OB DUMPS | | 81.0 | 0 | 0 | | 81 | (7.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (8.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.12 | | 0.12 | (9.) | GREEN BELT | | 172.64 | 0 | 0 | | 172.64 | |
TOTAL | 371.05 | 367.416 | 125.43 | 0 | 863.896 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 81.0 | (c)Quarry(in hectare) | 484.826 | (d)Safety Zone(in hectare) | 20.981 | (e)Final Void of 367.416 (hectare) at a Depth of 99 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 19.98 | (h)Total afforestation plant (in hectare) | 371.050 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 199798 | . | 584000 | 821200 | 822072.570 | 822072.570 | (2.) | 20002001 | 780000 | 584000 | 800000 | 842744.380 | 258744.380 | (3.) | 20012002 | 780000 | 584000 | 800000 | 919326.270 | 335326.000 | (4.) | 20052006 | 1700000 | 1700000 | 1772050 | 1194132.500 | . | (5.) | 20042005 | . | . | 155200 | 59737.500 | 59737.500 | (6.) | 20172018 | 80000 | 80000 | 73737 | 5572.000 | . | (7.) | 20052006 | 80000 | 80000 | 108800 | 12360.500 | . | (8.) | 20122013 | 80000 | 80000 | 74700 | 840.000 | . | (9.) | 20042005 | 780000 | 1700000 | 1501320 | 887266.500 | 107266.500 | (10.) | 20082009 | 1700000 | 1700000 | 4232850 | 1341508.000 | . | (11.) | 199495 | . | . | . | . | . | (12.) | 199596 | . | . | . | 18348.000 | 18348.000 | (13.) | 20112012 | 80000 | 80000 | 116716 | 840.000 | . | (14.) | 199091 | . | . | . | 777279.810 | 777279.810 | (15.) | 199192 | . | . | . | 830541.460 | 830541.460 | (16.) | 199495 | . | 584000 | 821200 | 802119.430 | 802119.430 | (17.) | 199596 | . | 584000 | 821200 | 840492.900 | 840492.900 | (18.) | 199697 | . | 584000 | 821200 | 801544.110 | 801544.110 | (19.) | 199899 | . | 584000 | 821200 | 685892.850 | 685892.850 | (20.) | 19992000 | . | 584000 | 800000 | 788301.620 | 788301.620 | (21.) | 20022003 | 780000 | 584000 | 800000 | 96008.000 | 376008.000 | (22.) | 20032004 | 780000 | 1022000 | 800000 | 977044.500 | 197044.500 | (23.) | 20062007 | 1700000 | 1700000 | 1753290 | 114511.500 | . | (24.) | 20072008 | 1700000 | 1700000 | 2544180 | 1235106.000 | . | (25.) | 20102011 | 4200000 | 1700000 | 4120266 | 2301986.500 | 601986.500 | (26.) | 20132014 | 4200000 | 4200000 | 4200000 | 2640415.500 | . | (27.) | 20142015 | 4200000 | 4200000 | 4200000 | 2789670.500 | . | (28.) | 20162017 | 4200000 | 4200000 | 4358710 | 3828182.640 | . | (29.) | 199394 | . | . | . | 4079.000 | 4079.000 | (30.) | 199899 | . | . | . | 14167.000 | 14167.000 | (31.) | 19992000 | . | . | . | 60171.000 | 60171.000 | (32.) | 20012002 | . | . | . | 134230.000 | 134230.000 | (33.) | 20072008 | 80000 | 80000 | 174400 | 19558.500 | . | (34.) | 20082009 | 80000 | 80000 | 78440 | 5988.500 | . | (35.) | 20092010 | 80000 | 80000 | 72800 | 1416.000 | . | (36.) | 20102011 | 80000 | 80000 | 116716 | 1620.690 | . | (37.) | 20132014 | 80000 | 80000 | 72000 | 52936.000 | . | (38.) | 20152016 | 80000 | 80000 | 63535 | 1457.000 | . | (39.) | 20152016 | 4200000 | 4200000 | 4169650 | 3539799.500 | . | (40.) | 20172018 | 4200000 | 4200000 | 4389690 | 4150721.000 | . | (41.) | 199697 | . | . | . | . | . | (42.) | 20002001 | . | . | . | 121396.000 | 121396.000 | (43.) | 20022003 | . | . | . | 32767.000 | 32767.000 | (44.) | 199293 | . | 584000 | . | 813445.840 | 813445.840 | (45.) | 199394 | . | 584000 | 1020695 | 811251.070 | 811251.070 | (46.) | 20092010 | 17000000 | 1700000 | 3864260 | 1671798.500 | . | (47.) | 20112012 | 4200000 | 4200000 | 4243460 | 1699787.500 | . | (48.) | 199798 | . | . | . | 1058.000 | 1058.000 | (49.) | 20162017 | 80000 | 80000 | 55479 | 1024.000 | . | (50.) | 20122013 | 4200000 | 4200000 | 4200000 | 2829234.500 | . | (51.) | 20032004 | . | . | . | 49589.500 | 49589.500 | (52.) | 20062007 | 80000 | 80000 | . | 9469.500 | 9469.500 | (53.) | 20142015 | 80000 | 80000 | 79200 | 34488.000 | . | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | High Courts | (c)Name of the Sub Court | Orissa | (d)Case No. | WP(c)/15143 of 2013) | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | sub juidice | (f)Case Details | Stamp duty | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0069 | (ii)Name of the EIA Consultant | JM EnviroNet Pvt Ltd | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001 | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | You are requested to submit the following information
1. Copy of letter of authorization for the applicant
2.Copy of FC documents
4. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018
5. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
6. Current Status of the Court cases
7. The details of Schedule-I species present, it Conservation plan. | 08 Aug 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Oct 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting the ADS Reply | 31 Dec 2019 | 2. | NA | PP submitted the compliance response to ToR conditions and presented
the other details including site photographs and .kml files before EAC. Based
on the presentation made by PP and the discussion held, the Committee observed
the following and deferred
the proposal for want of requisite information for further consideration. (i). PP needs to refurbish
the R & R plan for village within the lease area. Specifically the details
of percentage of money going to spend for compensation of villagers.