Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Karakhendra Steel Plant
(b)Name of the Company / Organisation RUNGTA MINES LTD
(c)Registered Address Rungta Office, Main Road, At/PO: Barbil, Odisha nli,,Dist Sepahijala,Sikkim-758035
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HIRAK MAZUMDER
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Rungta Mines Limited Barbil, keonjhar,Odisha,,Barbil,Keonjhar,Orissa-758035
(d)Pin code 758035
(e)E-mail rml.forest@gmail.com
(f)STD Code. 33(f)Telephone No. 22816580
(g)Fax No. 03322815380
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/IND/100635/2019
(d)Master Proposal Number(Single Window) SW/100634/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Refer Enclosure II of Form I
(b)Pincode 758035
(c)Bounded Latitudes (North)
From
Degree 22.13815555
Minutes
Second
From
Degree 22.14135555
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 85.41276388
Minutes
Second
From
Degree 85.41620833
Minutes
Second
(e)Survey of India Topo Sheet No. 73F/7, 8 and 12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 454
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 6.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-1001/EPE
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 26 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)SMS-IF10560021120126720Tons per Annum(TPA)Road
(2.)Rolling Mill-TMT/Flat/Round/Wire/Rod/Struct/other10241819284121702Tons per Annum(TPA)Road,RailWithin Plant
(3.)Billets/Bloom/Slab caster CCM 2 Strand10348820698124186Tons per Annum(TPA)OthersWithin Plant
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)SMS-IF2x15 T1x15 T3x15T
(2.)SMS-LRF-1x20T1x20T
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Mar 2018
(iv)Valid Upto 28 Mar 2023
(v)File No. 3783
(vi)Application No. 1726878
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 85
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.69
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.76
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 146813
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 146813
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sponge119266Tons per AnnumOwn PlantRoad0.5 OthersEC letterCopy of Linkage
(2.)Pig Iron13774Tons per AnnumOpen MarketRoad70 Open MarketCopy of Linkage
(3.)Scrap13774Tons per AnnumOpen MarketRoad100 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.07 To 12.99
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.21 To 6.56
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater4.Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2018/375903 Jul 20184
(2.)Surface12265.2 Not Appliacble PipelineIntake Wellapplication RML/KSP-530/401/17-1801 Mar 2018760
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)SMS & RM4.74.7ETPGreen Belt Renewal Plant4.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 4.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 4.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BF dust from IFIndustrial Waste2936Tons.OthersWithin PlantSanitary Landfills
(2.)Rejects from RMIndustrial Waste1118Tons.OthersWithin PlantOthers100% REUSED IN DRI
(3.)SlagIndustrial Waste19692Tons.OthersWithin PlantCo-Processing
(4.)Mill ScaleIndustrial Waste1366Tons.OthersWithin PlantCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube38.92.70.870139.7701160
(2.)SO2Microgram per Meter Cube192.7019.000180
(3.)PM10Microgram per Meter Cube67.82.71.510169.3101100
(4.)NOxMicrogram per Meter Cube23.72.7023.700180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Re-heating FurnaceFO603OthersPM2.50.277582
(2.)Re-Heating FurnaceFO603SO24.878222
(3.)Re-heating FurnaceFO603NOx2.722222
(4.)3x15T IF-302.5PM100.520838
(5.)3x15T IF-302.5OthersPM2.50.299482
(6.)Re-heating FurnaceFO603PM100.482751
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20000
(b)Source CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x 1000
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 5.342
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 5.342
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 5.342
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 5.342
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.619
(2.)Green belt1.763
(3.)Built Up Area0.004
(4.)Water Reservoir1.214
(5.)Area for Solid Waste Management0.162
(6.)OthersRoad & Stock yard0.580
Total (ha.) 5.342
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA.NA
(2.)ESAsNA.NA
(3.)ESZsNA.NA
(4.)Wildlife CorridorsNA.NA
(5.)CorridorsNA.NA
(6.)NPANA.NA
(7.)WLSNA.NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA.NA
(2.)OthersNILNA.NA
(3.)ForestNA.NA
(4.)Defence InstallationsNA.NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5.342
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Elephant
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 116.79 lakhs
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 5861/iWL-EC.Industry-SSP-128/2018
(iii)Date of issue 23 Jun 2018
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Karo River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 40
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 60
(d)Temporary Employment- During Operation 60
(e)No. of working days 330
(f)Total Manpower 260
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.76301.763
(2.)Percentage of Total Project Area33033
(3.)No. of Plants500005000
(4.)Funds Allocated1250000125000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High Court of Delhi Order in LPA 110/2014 and CM N
(ii)Name of the EIA Consultant Min Mec Consultancy Pvt. Ltd.
(iii)Address A-121, Paryavaran Complex, IGNOU Road, New Delhi-110030
(iv)Mobile No. 9811077603
(v)Landline No. 0112953223
(vi)Email Id minmec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 29 Apr 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 14 May 2019
2.NA

Proposal deferred for want of additional information.

07 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHIRAK MAZUMDER
DesignationDirector
Name of Company (Applicant Name should not be given here)RUNGTA MINES LTD
AddressRungta Office, Main Road, At/PO: Barbil, Odisha
Print