Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Hotel Complex
(b)Name of the Company / Organisation DJ INFRASTRUCTURE DEVELOPERS PVT LTD
(c)Registered Address 339, Functional Industrial Estate, Patparganj, Delhi,,Central,Delhi-110092
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mahesh Chand Goyal
(b)Designation (Owner/ Partner/ CEO) GeneralManager
(c)Address 339, Functional Industrial estate, Patparganj, Delhi-110092,,Pahar Ganj,Central,Delhi-110092
(d)Pin code 110092
(e)E-mail mahesh.goyal@gopalcorp.com
(f)STD Code. 11(f)Telephone No. 43160260
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/100506/2018
(d)Master Proposal Number(Single Window) SW/100499/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 1
(b)Pincode 110055
(c)Bounded Latitudes (North)
From
Degree 283847.50
Minutes
Second
From
Degree 283850.23
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 771222.56
Minutes
Second
From
Degree 771223.89
Minutes
Second
(e)Survey of India Topo Sheet No. H43X2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.65
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-32/2019-IA-III
(c)Date of Issue of TOR 28 Mar 2018
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 10 Apr 2019
(c)Date of Issue of EC 19 Jul 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA Notification 2006 and its amendment, al
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/Parya/NDL/1362/2018/282
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 24 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)built up area23226.4577973.69631200.153Otherssquare metersOthersNA
(2.)plot area399203992Otherssquare metersOthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)No. of hotel150-150No change
(2.)No. of offices40-40No change
(3.)No. of Banquet hall2-2No change
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 Feb 2019
(iv)Valid Upto 14 Feb 2020
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 231.00
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.865
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.73
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.115
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)It is a construction project.1OthersN/ALocal nearby MarketRoad1 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 20 Dec 2018 To 21 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube42.142.142.180
(2.)SO2Micro Gram per Meter Cube7.27.27.280
(3.)PM2.5Micro Gram per Meter Cube125.6125.6125.660
(4.)PM10Micro Gram per Meter Cube192.3192.3192.3100
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l77.877.8500500
(2.)OthersAlkalinitymg/l1818200200
(3.)Chloridesmg/l1010250250
(4.)Total Hardnessmg/l2020200200
(5.)pHNA7.67.68.58.5
(6.)TSSmg/l0000
(7.)Fluoridemg/l0.210.2111
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.6E
(2.)BODmg/l24.024.0E
(3.)DOmg/l5.45.4E
(4.)OthersTSSmg/l125.0125.0E
(5.)CODmg/l96.096.0E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.154.165.0
(2.)Leq(Night)A-weighted decibels(dB(A))49.549.555
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.97.9
(2.)P(Phosphorus)Milligram per Kilogram13.713.7
(3.)K(Potassium)Milligram per Kilogram20.420.4
(4.)Electric ConductivityMillisiemens per Centimetre550.1550.1
(5.)N(Nitrogen)Milligram per Kilogram30.830.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 12
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board1500 Not Appliacble PipelineOthersDelhi Jal BoardNA26 Mar 2019150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing, Misc.184210STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersMisc.10084
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 184
(b)Total Discharged Water (Kilolitre per Day) 84
(c)Total Reused Water (Kilolitre per Day) 100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.04Tons0.1RoadAuthorized Recyclers
(2.)Municipal Solid Waste (Biodegradable Waste)Municipal Solid Waste115Tons0OthersOrganic Waste ConvertorOthersorganic waste convertor
(3.)Plastic wastePlastic Waste9.5Tons0.1RoadAuthorized Recyclers
(4.)electronic wasteE Waste0.04Tons0.1RoadAuthorized Recyclers
(5.)Municipal solid waste (non- biodegradable waste)Municipal Solid Waste68Tons0.1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube201.250.91.2202.46100
(2.)PM2.5Microgram per Meter Cube114.650.90.15114.8160
(3.)NOxMicrogram per Meter Cube42.70.92.545.2180
(4.)SO2Microgram per Meter Cube6.50.90.26.7180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG sets of 3x1250 kVALow sulphur diesel fuel860.55SO20.15
(2.)DG Sets of 1x500 kVALow sulphur diesel fuel860.0SO20.09
(3.)DG sets of 1x500 kVALow sulphur diesel fuel860.3PM100.025
(4.)DG set of 3x1250 kVALow sulphur diesel fuel860.55PM100.042
(5.)DG sets of 2x1250 kVALow sulphur diesel fuel860.55NOx0.258
(6.)DG sets of 3x1250 kVALow sulphur diesel fuel860.55OthersPM2.50.017
(7.)DG set of 1x500 kVALow sulphur diesel fuel860.3NOx0.09
(8.)DG set of 1x500 kVALow sulphur diesel fuel860.3OthersPM2.50.010
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8053
(b)Source BSES
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3x1250 kVA and 1x500 kVA
(e)Stack Height (in m) 86
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.3992
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.3992
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : plot area 0.3992
    Total (ha.) 0.3992
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersplot area0.3992
Total (ha.) 0.3992
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSOkhla Wildlife Sanctuary14.49South East direction of the project
(2.)ESAsNone0None
(3.)CorridorsNone0None
(4.)Wildlife CorridorsNone0None
(5.)NPAOkhla Wildlife Sanctuary14.49South East direction of the project
(6.)Critically Polluted AreaNone0None
(7.)ESZsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestCentral Ridge Reserve Forest0.58South west direction of the project
(2.)Archaeological SitesFortification Wall Asad Buri3.39South East East Direction of the project
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.3992
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Prasad Nagar Lake
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2.65
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 670
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 820
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt101201012
(2.)Percentage of Total Project Area25.35025.35
(3.)No. of Plants06060
(4.)Funds Allocated044
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social0.75% of project cost will be spent for corporate environment responsibility
(2.)Financialrevenue will be generated.
(3.)Environmental1012 sqm (25.35%) of green area will be developed
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 80
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 3992
(e)Total built up area (sqm) 31200.15
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 1
(d)Capacity 82
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 361 ECS
5.
Energy Saving Measures:
(a)Source/Mode Solar & LED
(b)Percentage 1
(c)Quantity 80.53
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will no extraction of ground water. Drainage
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev. 74, 7th March, 2019, Serial No. 117
(ii)Name of the EIA Consultant Perfact EnviroSoultions Pvt. Ltd.
(iii)Address 5th floor, NN Mall, Mangalam Palace, Sector-3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahesh Chand Goyal
DesignationGeneralManager
Name of Company (Applicant Name should not be given here)DJ INFRASTRUCTURE DEVELOPERS PVT LTD
Address339, Functional Industrial Estate, Patparganj, Delhi
Print