1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Pesticide Technical Manufacturing Plant | (b)Name of the Company / Organisation | HM INDUSTRIES | (c)Registered Address | Plot No. A2/2115, GIDC Vapi, DIst: Valsad-396195,,Valsad,Gujarat-396195 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Omankuttan R Pillai | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | Plot No. A2/2115, GIDC Vapi, Dist Valsad,,Pardi,Valsad,Gujarat-396195 | (d)Pin code | 396195 | (e)E-mail | hmindustries15@gmail.com | (f)STD Code. | 260(f)Telephone No. | 239449 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/78855/2018 | (d)Master Proposal Number(Single Window) | SW/100446/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | A2/2115 | (b)Pincode | 396195 | (c)Bounded Latitudes (North) | | From | | Degree | 20.367428 | Minutes | | Second | | From | | Degree | 20.368019 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.948881 | Minutes | | Second | | From | | Degree | 72.949319 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | IRS-P6:LIS | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 30 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Valsad | Pardi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/281/2018-IA-II(I) | (b)Date of Apply of TOR | 05 Oct 2018 | (c)Date of Issue of TOR / Standard ToR | 09 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Plant is located in notified Industrial estate, va | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 4 | 4 | -- | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Group-1 (Fungicide) - Pesticide Products | 100 | Others | Tons per Month | Road | | (2.) | Group-2 (Herbicide) - Pesticide Products | 100 | Others | Tons per Month | Road | | (3.) | Group-3 (Insecticide) - Pesticide Products | 100 | Others | Tons per Month | Road | | (4.) | Group-4 (Specialty Chemicals) | 100 | Others | Tons per Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 09 Nov 2018 | (iv)Valid Upto | 08 Nov 2021 | (v)File No. | J-11011/281/2018 | (vi)Application No. | IA/GJ/IND2/78855/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 7.5 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.225 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4800 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 4800 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 1,2,4-Triazole | 324 | Tons per Annum | | Imported | Road,Rail | | 650 | Linkage | | Copy of Linkage | (2.) | Toluene | 1355 | Tons per Annum | | Neraest | Road | | 100 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 82.5 | 76.9 | 82 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 44.2 | 41.1 | 44 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 17.4 | 13.9 | 17 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 20.1 | 16.9 | 20.0 | 80.0 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.18 | 7.02 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 1218 | 438 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 0.8 | 0.4 | 1.0 | 1.5 | (4.) | TSS | | | mg/l | | 250 | 100 | 300 | 600 | (5.) | Total Hardness | | | mg/l | | 835 | 268 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 344 | 104 | 250 | 1000 | (7.) | Heavy Metals | | COpper | mg/l | | 00 | 00 | 0.05 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.18 | 6.81 | A | (2.) | DO | | mg/l | | 5.1 | 4.6 | B | (3.) | BOD | | mg/l | | 6 | 4 | B | (4.) | COD | | mg/l | | 12 | 6 | A | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 62.4 | 39.1 | 65 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.9 | 44.1 | 75 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milliequivalents per 100 Gram | | 1.6 | 1.1 | (2.) | pH | | | 7.82 | 7.55 | (3.) | N(Nitrogen) | Kilogram per hectare | | 1158 | 386 | (4.) | Electric Conductivity | Centimeter per Second | | 1.18 | 0.82 | (5.) | P(Phosphorus) | Kilogram per hectare | | 407.7 | 215.0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 100 To 50 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25 To 50 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply | 91.5 | 100 | Copy of Permission Letter | Pipeline | | Others | Pipeline | GIDC/RM/VAP/TRF/FTO/VAP1/0003 | 20 Jul 2017 | 91.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial-High COD | 42.33 | 42.33 | ETP and MEE | Reuse within the Plant & Recycling,Others | MEE salt residue to TSDF | 40.23 | 2.1 | (2.) | Industrial-Low COD | 9.8 | 9.8 | ETP | Others | CETP of M/s. VGEL | 4.8 | 5 | (3.) | Domestic | 5 | 5 | Septic tank & Soak Pit | Others | Septic tank & Soak pit | 0 | 5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 57.13 | (b)Total Discharged Water (Kilolitre per Day) | 12.1 | (c)Total Reused Water (Kilolitre per Day) | 45.03 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Industrial Waste | | 0.3 | Tons | 100 | Road | | Authorized Recyclers | | (2.) | SLudge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1.2 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Discarded Drum/Bags/ | Industrial Waste | | 60 | Tons | 100 | Road | | Authorized Recyclers | | (4.) | Process Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 24 | Tons | 15 | Road | | Co-Processing | | (5.) | Expired Pesticide | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 15 | Road | | Co-Processing | | (6.) | Spent Solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 240 | Tons | 150 | Road | | Authorized Recyclers | | (7.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2400 | Tons | 15 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (8.) | Potassium Sulfate | Industrial Waste | | 10800 | Tons | 250 | Road | | Authorized Recyclers | | (9.) | HCL | Industrial Waste | | 2280 | Tons | 500 | Road | | Authorized Recyclers | | (10.) | Sodium Sulfite | Industrial Waste | | 1944 | Tons | 500 | Road | | Authorized Recyclers | | (11.) | Used Filter Cloth | Industrial Waste | | 0.6 | Tons | 100 | Road | | Co-Processing | | (12.) | Used Hyflow | Industrial Waste | | 1.2 | Tons | 100 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (13.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 12 | Tons | 15 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 80.00 | 3.12 | 0.042 | 80.42 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 44.2 | 3.12 | 0.042 | 44.442 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 17.4 | 3.12 | 0.029 | 17.69 | 80 | (4.) | NOx | | Microgram per Meter Cube | 20.1 | 3.12 | 0.00 | 20.2 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Process vent - 4 Nos. | -- | 10 | 0.1 | PM10 | | 0.002 | (2.) | Boiler | Natural Gas | 10 | 0.1 | PM10 | | 0.005 | (3.) | D G Set | HSD | 10 | 0.1 | PM10 | | 0.005 | (4.) | Process Vent | -- | 10 | 0.1 | Others | HCl | 0.002 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | D.G. Set * 1 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.1809 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.1809 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 107.518 | (b)Waste/Barren Land (ha.) | 69.256 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 27.622 | (e)Settlements (ha.) | 19.255 | (f)Industrial (ha.) | 15.503 | (g)Forest (ha.) | 71.23 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Grass land | 4.258 | Total (ha.) | 314.642 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 0.0585 | | (2.) | Green belt | | 0.065 | | (3.) | Others | Road & Open area | 0.032 | | (4.) | Main Plant | | 0.0254 | ETP Area, R.M. Store & Utility | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | -- | 0 | -- | (2.) | Corridors | -- | 0 | -- | (3.) | ESAs | -- | 0 | -- | (4.) | Wildlife Corridors | -- | 0 | -- | (5.) | Critically Polluted Area | -- | 0 | -- | (6.) | ESZs | -- | 0 | -- | (7.) | NPA | -- | 0 | -- | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | -- | -- | 0 | -- | (2.) | Archaeological Sites | | -- | 0 | -- | (3.) | Defence Installations | | -- | 0 | -- | (4.) | Forest | | -- | 0 | -- | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.1809 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | Land already acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 25 | (d)Temporary Employment- During Operation | 25 | (e)No. of working days | 330 | (f)Total Manpower | 50 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.065 | (b)Percentage of Total Project Area | 35.93 | (c)No. of Plants to be Planted | 165 | (d)Funds Allocated for Plantation | 400000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI NABET | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 30 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- As per the products details in EIA/EMP report, specialty chemicals @100 TPM, covered under item 5(f), are to be manufactured. the relevant details in Form-2 needs to be corrected accordingly. Why the same was informed earlier.
- Entry at column 8.1 viz.Project configuration is not clear.
- None of the proposed technical grade pesticides is under banned category.
- | 30 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 17 May 2019 | 3. | NA | Please reply to our observations dated 30/3/2019. | 25 May 2019 | 4. | NA | The correction have been made as per the instruction received | 07 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | |
|