1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | SANU-1 Limestone Mine | (b)Name of the Company / Organisation | RAJASTHAN STATE MINES AND MINERALS LTD | (c)Registered Address | 8-west patel nagar
circuit house road,
jodhpur-342001,4-meera marg,
Udaipur-313001,Jodhpur,Rajasthan-342001 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | durga dutt shripat | (b)Designation (Owner/ Partner/ CEO) | Group General Manager | (c)Address | SBU & PC Limestone
8-west patel nagar
circuit house road
Jodhpur-342001,sanu limestone mines
Jaisalmer-345001,,Jodhpur,Rajasthan-342001 | (d)Pin code | 342001 | (e)E-mail | ashjais.64@gmail.com | (f)STD Code. | 291(f)Telephone No. | 2511031 | (g)Fax No. | 02912511029 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/MIN/100413/2019 | (d)Master Proposal Number(Single Window) | SW/100412/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | ML No 27/1996 | (b)Pincode | 345001 | (c)Bounded Latitudes (North) | | From | | Degree | 70.33 | Minutes | | Second | | From | | Degree | 70.35 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 27.16 | Minutes | | Second | | From | | Degree | 27.19 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 40 I/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 211 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 13 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | F.No IV/ENV/R/R/Mine-100/588/2008/03 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 17 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | ROM Limestone | 2.799 | .501 | 3.3 | Others | Million Tonne Per Annum | Road | | (2.) | SMS grade limestone | 1.25 | 0.25 | 1.5 | Others | Million Tonne Per Annum | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Crushing & Screening Plant | 2 | 0 | 2 | No change in configuration | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 23 Jan 2017 | (iv)Valid Upto | 31 Jul 2019 | (v)File No. | F(Mines)/Jaisalmer (Jaisalmer/1958(1)/2016-2017/98 | (vi)Application No. | 30811 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.30 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 00 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Deisel | 900 | Others | KILOLITER PER ANNUM | IOC DEPOT | Road | | 300 | Open Market | | Not Applicable | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 110 To 110 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 110 To 110 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 55 | 12 | Copy of Permission Letter | modeOthers | ROAD BY WATER TANKERS | Others | CANAL SUPPLY | F.6(6)IGNP/2005 | 06 Feb 2007 | 120 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage | 3 | 0 | septic tank | Others | septic tank & soak pits | 0 | 3 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3 | (b)Total Discharged Water (Kilolitre per Day) | 3 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sanitary waste | Municipal Solid Waste | | 0 | Kilolitre | 0 | Road | | Sanitary Landfills | | (2.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (3.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (4.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (5.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (6.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (7.) | NIL | Others | NA | 0 | Kilolitre | 0 | Others | na | Others | NA | (8.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (9.) | NIL | Others | NA | 0 | Kilolitre | 0 | Road | | Others | NA | (10.) | Sanitary waste | Municipal Solid Waste | | 0 | Kilolitre | 0 | Road | | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 97 | 0.750 | 1.141 | 99.141 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 52 | 0.750 | 0.083 | 53 | 60 | (3.) | NOx | | Microgram per Meter Cube | 14.2 | 0.750 | 0.0001 | 14.4 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 10.3 | 0.750 | 0.0001 | 10.40001 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | HSD | 12 | 0.87 | SO2 | | 2.5 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1250 | (b)Source | JVVNL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1250 X 1 KVA | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.14 | (c)Government Land (ha.) | 999.55 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.31 | Total Land (ha.) | 1000 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.14 | (b)Waste/Barren Land (ha.) | 999.55 | (c)Grazing/ Community Land (ha.) | 0.31 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NIL | 0 | Total (ha.) | 999.9999999999999 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 828.625 | MINING AREA | (2.) | Others | OTHERS | 171.374 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | NA | 0 | NA | (2.) | Corridors | NA | 0 | NA | (3.) | Critically Polluted Area | NA | 0 | NA | (4.) | WLS | NA | 0 | NA | (5.) | ESAs | NA | 0 | NA | (6.) | NPA | NA | 0 | NA | (7.) | ESZs | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1000 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | WHOLE LAND AQUIRED | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 22 | (b)Permanent Employment-During Operation | 58 | (c)Temporary Employment- During Construction | 9 | (d)Temporary Employment- During Operation | 60 | (e)No. of working days | 365 | (f)Total Manpower | 149 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 237.35 | 115 | 352.35 | (2.) | Percentage of Total Project Area | 23 | 12 | 35 | (3.) | No. of Plants | 93000 | 30000 | 123000 | (4.) | Funds Allocated | 4290000 | 2250000 | 6540000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Increased revenue to the state ex-chequer & revenue to Indian railway. | (2.) | Environmental | Improved Soil quality .
Vegetation enhancement in semi arid area. | (3.) | Social | Improvement in social upliftment.
Direct & Indirect employment generation. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | LIMESTONE | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 3.30 MILLION TONNE PER ANNUM | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 584(4)(3)(1763)/2018-RCOM-AJM/1684 | (b)Date of Approval | 14 Dec 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 1000 | (f)Approved Capacity | 1500000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 25.421 | (b)Mineable Reserves (Million Ton) | 19.840 | (c)Extractable Reserves(Million Ton) | 9 | (d)Percent(%) of Extraction | 47 | (e)Grade of Coal /Ore /Mineral | SMS GRADE | (f)Stripping Ratio | NA : NA | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 75 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 6 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1000 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | LEASE GRANTED BY STATE GOVT RAJASTHAN | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 1000 | (iii)Validity of the lease deed | From : 01 Apr 1997 To : 31 Mar 2047 | (iv)Date of Execution of Mining Lese | 01 Apr 1997 | (v)Reference Number | P.4(270)MIN/GR-2/83 DATED 27 JAN 2010 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | WITHIN VALID PERIOD | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 440.202 | (iii)Height (in meter) | 4 | (iv)Quantity (in Million Cubic meter) | 2113 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 388.423 | (b)Depth (in meter) | 6 | (c)Volume (in Million Cubic meter) | 1500 | |
|
12. | Details of Quarry: | (a)Final Void of 388.423 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 828.625 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | TIPPERS | (b)Surface to Siding/Loading | TIPPERS | (c)Transportation / Conveyor Details | TIPPERS | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 999.55 | 0 | 999.55 | (3.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (4.) | OTHERS(Specify) | BARANI | 0.31 | 00 | 0.31 | (5.) | SETTLEMENTS | | 0 | 0 | 0 | (6.) | AGRICULTURE LAND | | 0.14 | 00 | 0.14 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 1000 | 0 | 1000 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | INTERNAL OB DUMPS | | 440.202 | 0 | 0 | | 440.202 | (4.) | ROADS | | 0 | 0 | 1.60 | | 1.6 | (5.) | EXCAVATION/QUARRY | BARANI | 0 | 388.432 | 0 | | 388.432 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 8.09 | | 8.09 | (7.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (8.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | |
TOTAL | 440.202 | 388.432 | 9.69 | 0 | 838.324 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 440.202 | (c)Quarry(in hectare) | 828.625 | (d)Safety Zone(in hectare) | 30.38 | (e)Final Void of 388.432 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 100 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 225 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2011 | 7.46 | 7.46 | 7.46 | 7.46 | 00 | (2.) | 2009 | 8.81 | 8.81 | 8.81 | 8.81 | 00 | (3.) | 2010 | 8.13 | 8.13 | 8.13 | 8.13 | 0 | (4.) | 2012 | 11.76 | 11.76 | 11.76 | 11.76 | 00 | (5.) | 2013 | 8.60 | 8.60 | 8.60 | 8.60 | 00 | (6.) | 2014 | 8.60 | 8.60 | 8.60 | 8.60 | 00 | (7.) | 2015 | 8.26 | 8.26 | 8.26 | 8.26 | 00 | (8.) | 2017 | 9.69 | 9.69 | 9.69 | 9.69 | 00 | (9.) | 2018 | 12.30 | 12.30 | 12.30 | 12.30 | 00 | (10.) | 2008 | 7.79 | 7.79 | 7.79 | 7.79 | 00 | (11.) | 2016 | 10.03 | 10.03 | 10.03 | 10.03 | 00 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/IA 0033 | (ii)Name of the EIA Consultant | OCEAO-ENVIRO MANAGEMENT SOLUTIONS (INDIA) PVT LTD | (iii)Address | 217,Ist Floor,Judge colony,sector 12 Vasundhra Ghaziabad,UP 201012 | (iv)Mobile No. | 9582570789 | (v)Landline No. | 0120433804 | (vi)Email Id | solutionsaps@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 23 Jan 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Please submit the copy of TOR.
2. Copy of Previous ECs.
3. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
4. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
5. Status of the Mine (working/ not).
6. Updated Compliance report. | 11 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 15 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | NA | 08 Mar 2021 | 2. | NA | Deferred | 16 Feb 2021 | 3. | ADS Reply Letter | Respected Sir,
Kindly consider the Reply to MoM of 5th meeting of EAC held on 29-30 May, 2019 and requesting you to grant necessary permission at the earliest.
Thanking You,
Yours faithfully
M/s RSML | 03 Jan 2021 | 4. | NA | Based on the discussion held and documents submitted the Committee has deferred the proposal for want of following information | 24 Jun 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | durga dutt shripat | Designation | Group General Manager | Name of Company (Applicant Name should not be given here) | RAJASTHAN STATE MINES AND MINERALS LTD | Address | 8-west patel nagar
circuit house road,
jodhpur-342001 |
|