Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) SANU-1 Limestone Mine
(b)Name of the Company / Organisation RAJASTHAN STATE MINES AND MINERALS LTD
(c)Registered Address 8-west patel nagar circuit house road, jodhpur-342001,4-meera marg, Udaipur-313001,Jodhpur,Rajasthan-342001
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant durga dutt shripat
(b)Designation (Owner/ Partner/ CEO) Group General Manager
(c)Address SBU & PC Limestone 8-west patel nagar circuit house road Jodhpur-342001,sanu limestone mines Jaisalmer-345001,,Jodhpur,Rajasthan-342001
(d)Pin code 342001
(e)E-mail ashjais.64@gmail.com
(f)STD Code. 291(f)Telephone No. 2511031
(g)Fax No. 02912511029
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/MIN/100413/2019
(d)Master Proposal Number(Single Window) SW/100412/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. ML No 27/1996
(b)Pincode 345001
(c)Bounded Latitudes (North)
From
Degree 70.33
Minutes
Second
From
Degree 70.35
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 27.16
Minutes
Second
From
Degree 27.19
Minutes
Second
(e)Survey of India Topo Sheet No. 40 I/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 211
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 13
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. F.No IV/ENV/R/R/Mine-100/588/2008/03
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 17 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ROM Limestone2.799.5013.3OthersMillion Tonne Per AnnumRoad
(2.)SMS grade limestone1.250.251.5OthersMillion Tonne Per AnnumRoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Crushing & Screening Plant202No change in configuration
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 23 Jan 2017
(iv)Valid Upto 31 Jul 2019
(v)File No. F(Mines)/Jaisalmer (Jaisalmer/1958(1)/2016-2017/98
(vi)Application No. 30811
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.30
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.1
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel900OthersKILOLITER PER ANNUMIOC DEPOTRoad300 Open MarketNot Applicable
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 110 To 110
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 110 To 110
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5512Copy of Permission LettermodeOthersROAD BY WATER TANKERSOthersCANAL SUPPLYF.6(6)IGNP/200506 Feb 2007120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage30septic tankOthersseptic tank & soak pits03
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3
(b)Total Discharged Water (Kilolitre per Day) 3
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sanitary wasteMunicipal Solid Waste0Kilolitre0RoadSanitary Landfills
(2.)NILOthersNA0Kilolitre0RoadOthersNA
(3.)NILOthersNA0Kilolitre0RoadOthersNA
(4.)NILOthersNA0Kilolitre0RoadOthersNA
(5.)NILOthersNA0Kilolitre0RoadOthersNA
(6.)NILOthersNA0Kilolitre0RoadOthersNA
(7.)NILOthersNA0Kilolitre0OthersnaOthersNA
(8.)NILOthersNA0Kilolitre0RoadOthersNA
(9.)NILOthersNA0Kilolitre0RoadOthersNA
(10.)Sanitary wasteMunicipal Solid Waste0Kilolitre0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube970.7501.14199.141100
(2.)PM2.5Microgram per Meter Cube520.7500.0835360
(3.)NOxMicrogram per Meter Cube14.20.7500.000114.460
(4.)SO2Microgram per Meter Cube10.30.7500.000110.4000180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD120.87SO22.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1250
(b)Source JVVNL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1250 X 1 KVA
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.14
(c)Government Land (ha.) 999.55
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.31
    Total Land (ha.) 1000
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.14
(b)Waste/Barren Land (ha.) 999.55
(c)Grazing/ Community Land (ha.) 0.31
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NIL 0
    Total (ha.) 999.9999999999999
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area828.625MINING AREA
(2.)OthersOTHERS171.374
Total (ha.) 999.999
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNA0NA
(2.)CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)WLSNA0NA
(5.)ESAsNA0NA
(6.)NPANA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1000
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired WHOLE LAND AQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 22
(b)Permanent Employment-During Operation 58
(c)Temporary Employment- During Construction 9
(d)Temporary Employment- During Operation 60
(e)No. of working days 365
(f)Total Manpower 149
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt237.35115352.35
(2.)Percentage of Total Project Area231235
(3.)No. of Plants9300030000123000
(4.)Funds Allocated429000022500006540000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialIncreased revenue to the state ex-chequer & revenue to Indian railway.
(2.)EnvironmentalImproved Soil quality . Vegetation enhancement in semi arid area.
(3.)SocialImprovement in social upliftment. Direct & Indirect employment generation.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LIMESTONEMajor
2.
Mine Capacity in ROM (Run of Mine) 3.30 MILLION TONNE PER ANNUM
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1763)/2018-RCOM-AJM/1684
(b)Date of Approval 14 Dec 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 1000
(f)Approved Capacity 1500000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 25.421
(b)Mineable Reserves (Million Ton) 19.840
(c)Extractable Reserves(Million Ton) 9
(d)Percent(%) of Extraction 47
(e)Grade of Coal /Ore /Mineral SMS GRADE
(f)Stripping Ratio NA : NA
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 75
(i)Mining Method Opencast
(j)Life of Mine (Years) 6
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1000
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof LEASE GRANTED BY STATE GOVT RAJASTHAN
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 1000
(iii)Validity of the lease deed From : 01 Apr 1997 To : 31 Mar 2047
(iv)Date of Execution of Mining Lese 01 Apr 1997
(v)Reference Number P.4(270)MIN/GR-2/83 DATED 27 JAN 2010
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof WITHIN VALID PERIOD
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 440.202
(iii)Height (in meter) 4
(iv)Quantity (in Million Cubic meter) 2113
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 388.423
(b)Depth (in meter) 6
(c)Volume (in Million Cubic meter) 1500
12.
Details of Quarry:
(a)Final Void of 388.423 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 828.625
13.
Details of Transportation:
(a)In Pit/Underground to Surface TIPPERS
(b)Surface to Siding/Loading TIPPERS
(c)Transportation / Conveyor Details TIPPERS
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)WASTE LAND999.550999.55
(3.)SURFACE WATER BODIES000
(4.)OTHERS(Specify)BARANI0.31000.31
(5.)SETTLEMENTS000
(6.)AGRICULTURE LAND0.14000.14
(7.)GRAZING LAND000
TOTAL100001000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)EXTERNAL OB DUMPS0000
(3.)INTERNAL OB DUMPS440.20200440.202
(4.)ROADS001.601.6
(5.)EXCAVATION/QUARRYBARANI0388.4320388.432
(6.)BUILT UP AREA (COLONY/OFFICE)008.098.09
(7.)GREEN BELT0000
(8.)VIRGIN AREA0000
TOTAL440.202388.4329.690838.324
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 440.202
(c)Quarry(in hectare) 828.625
(d)Safety Zone(in hectare) 30.38
(e)Final Void of 388.432 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 100
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 225
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20117.467.467.467.4600
(2.)20098.818.818.818.8100
(3.)20108.138.138.138.130
(4.)201211.7611.7611.7611.7600
(5.)20138.608.608.608.6000
(6.)20148.608.608.608.6000
(7.)20158.268.268.268.2600
(8.)20179.699.699.699.6900
(9.)201812.3012.3012.3012.3000
(10.)20087.797.797.797.7900
(11.)201610.0310.0310.0310.0300
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/IA 0033
(ii)Name of the EIA Consultant OCEAO-ENVIRO MANAGEMENT SOLUTIONS (INDIA) PVT LTD
(iii)Address 217,Ist Floor,Judge colony,sector 12 Vasundhra Ghaziabad,UP 201012
(iv)Mobile No. 9582570789
(v)Landline No. 0120433804
(vi)Email Id solutionsaps@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 23 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Please submit the copy of TOR. 2. Copy of Previous ECs. 3. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. 4. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. 5. Status of the Mine (working/ not). 6. Updated Compliance report. 11 Apr 2019
2.NAThe correction have been made as per the instruction received 15 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterNA 08 Mar 2021
2.NA

Deferred

16 Feb 2021
3. ADS Reply LetterRespected Sir, Kindly consider the Reply to MoM of 5th meeting of EAC held on 29-30 May, 2019 and requesting you to grant necessary permission at the earliest. Thanking You, Yours faithfully M/s RSML 03 Jan 2021
4.NA

Based on the discussion held and documents submitted the Committee has deferred the proposal for want of following information

24 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantdurga dutt shripat
DesignationGroup General Manager
Name of Company (Applicant Name should not be given here)RAJASTHAN STATE MINES AND MINERALS LTD
Address8-west patel nagar circuit house road, jodhpur-342001
Print