|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion and debottlenecking of existing petrochemical manufacturing facility at Vadodara Manufacturing Division (VMD) of M/s. Reliance Industries Limited (RIL) | (b)Name of the Company / Organisation | Reliance Industries Limited | (c)Registered Address | Bldg. No. 7, B Wing, 2nd Floor,
Reliance Corporate Park,
Thane Belapur Road,
Ghansoli,
Navi Mumb,Bldg. No. 7, B Wing, 2nd Floor,
Reliance Corporate Park,
Thane Belapur Road,
Ghansoli,
Navi Mumb,Thane,Maharashtra-400701 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Prashant Gogate | (b)Designation (Owner/ Partner/ CEO) | Vice President | (c)Address | Reliance Industries LimiteM-10 First Floor,,Motikhavdi,Jamnagar,Jamnagar,Gujarat-361142 | (d)Pin code | 361142 | (e)E-mail | prashant.gogate@ril.com | (f)STD Code. | 288(f)Telephone No. | 3512167 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(c) Petro-chemical complexes (industries based on processing of
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/100410/1998 | (d)Master Proposal Number(Single Window) | SW/100395/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | PCC, GIDC Notified Industrial Area, Pls refer EIA | (b)Pincode | 391346 | (c)Bounded Latitudes (North) | | From | | Degree | 22.371980 | Minutes | | Second | | From | | Degree | 22.395234 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.104936 | Minutes | | Second | | From | | Degree | 73.107488 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F 43 & H3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 42 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/212/2017-IA-II (I) | (c)Date of Issue of TOR | 01 Dec 1998 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 25 Jun 2019 | (c)Date of Issue of EC | 04 Feb 2021 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is located within Notified Industrial Area | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 1999 (ENV)/487 dated 14.09.2018 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 12 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ortho Xylene | 3784 | 0 | 3784 | Others | MTM | Road | | (2.) | Para Xylene | 4050 | 0 | 4050 | Others | MTM | Road | | (3.) | Dimethyl Terephthalate | 3333 | 0 | 3333 | Others | MTM | Road | | (4.) | Ethylene Glycol (EG) | 1670 | 470 | 2140 | Others | MTM | Road | | (5.) | Low Density Poly Ethylene (LDPE) | 13335 | 0 | 13335 | Others | MTM | Road | | (6.) | Carbon Fiber (CF) | 1 | 0 | 1 | Others | MTM | Road | | (7.) | Ethylene Oxide | 836 | 1004 | 1840 | Others | MTM | Road | | (8.) | Ethylene Dichloride (EDC) | 8335 | 0 | 8335 | Others | MTM | Others | Pipeline | (9.) | Poly Vinyl Chloride (PVC) | 4585 | 3315 | 7900 | Others | MTM | Road | | (10.) | Poly Propylene (PP-IV) | 6250 | 7120 | 13370 | Others | MTM | Road | | (11.) | Methyl Acrylates | 170 | 0 | 170 | Others | MTM | Road | | (12.) | Normal Paraffin (new product( | 0 | 5000 | 5000 | Others | MTM | Road | | (13.) | Utilities (Steam) | 620 | 96 | 716 | Others | TPH | Others | Used internaly | (14.) | Utilities (Steam-Petcoke Boiler) | 0 | 500 | 500 | Others | TPH | Others | Used internaly | (15.) | Utilities (Power) | 81 | 14 | 95 | Mega Watt(MW) | | Others | Used internaly | (16.) | Pyrolysis Gasoline (PGH), (By Product) | 18335 | 0 | 18335 | Others | MTM | Road | | (17.) | Tri Ethylene Glycol (TEG-New By Product) | 0 | 15 | 15 | Others | MTM | Road | | (18.) | Poly Ethylene Glycol (PEG-New By Product) | 0 | 150 | 150 | Others | MTM | Road | | (19.) | C4 Raffinate (By Product) | 6085 | 0 | 6085 | Others | MTM | Road | | (20.) | Mix C4, (By Product) | 10585 | 0 | 10585 | Others | MTM | Road | | (21.) | Heavy Normal Paraffin (HNP) New By product | 0 | 700 | 700 | Others | MTM | Road | | (22.) | Carbon Black Feed Stock (CBFS, By Product) | 1585 | 1415 | 3000 | Others | MTM | Road | | (23.) | Heavy Aromatics (new by product) | 0 | 4500 | 4500 | Others | MTM | Road | | (24.) | Vinyl Chloride Monomer (VCM) | 4750 | 3020 | 7770 | Others | MTM | Others | Pipeline | (25.) | Acrylonitrile | 2500 | 0 | 2500 | Others | MTM | Road | | (26.) | Butadiene | 4500 | 2000 | 6500 | Others | MTM | Road | | (27.) | Dry Spun Acrylic Fiber (DSAF) | 1000 | 0 | 1000 | Others | MTM | Road | | (28.) | Di Ethylene Glycol (DEG-New By product) | 0 | 135 | 135 | Others | MTM | Road | | (29.) | Light Normal Paraffin (LNP) new by product | 0 | 200 | 200 | Others | MTM | Road | | (30.) | HCl (by product) | 0 | 1417 | 1417 | Others | MTM | Road | | (31.) | Benzene | 4585 | 2655 | 7240 | Others | MTM | Road | | (32.) | Chlorinated Poly Vinyl Chloride (CPVC-New Product) | 0 | 6000 | 6000 | Others | MTM | Road | | (33.) | Polypropylene (PP-I) | 3000 | 0 | 3000 | Others | MTM | Road | | (34.) | Linear Alkyl Benzene | 3625 | 3295 | 6920 | Others | MTM | Road | | (35.) | Petroleum Resin | 417 | 0 | 417 | Others | MTM | Road | | (36.) | Ethyl Acrylates | 250 | 0 | 250 | Others | MTM | Road | | (37.) | Poly Butadiene Rubber (PBR-II) | 4166 | 1134 | 5300 | Others | MTM | Road | | (38.) | Acrylic Fiber (AF) | 1000 | 0 | 1000 | Others | MTM | Road | | (39.) | Heavy Alkylates (new by product) | 0 | 400 | 400 | Others | MTM | Road | | (40.) | Poly Butadiene Rubber (PBR-I) | 1670 | 2260 | 3930 | Others | MTM | Road | | (41.) | Ethylene | 17000 | 8000 | 25000 | Others | MTM | Others | Pipeline | (42.) | Toluene (new product) | 0 | 2250 | 2250 | Others | MTM | Road | | (43.) | Propylene | 8000 | 7000 | 15000 | Others | MTM | Others | Pipeline | (44.) | Butyl Acrylates | 334 | 0 | 334 | Others | MTM | Road | | (45.) | Naphtha Return Stream (NRS, By Product) | 13750 | 0 | 13750 | Others | MTM | Road | | (46.) | Poly Propylene (PPCP (PP-II)) | 2085 | 3255 | 5340 | Others | MTM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Cracker | 17000 | 8000 | 25000 | Mother Plant | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jan 2019 | (iv)Valid Upto | 30 Sep 2023 | (v)File No. | AWH-98810 | (vi)Application No. | 147162 dated 27.11.2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2270 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 47 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.515 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 7.6274 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 209250 | (b)Existing quantity of raw material/fuel | 707550 | (c)Total quantity of raw material/fuel | 916800 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | naphtha | 916800 | Tons per Annum | | RIL Jamnagar | Others | Sea, Pipeline | 200 | Captive | | Copy of Linkage | (2.) | Fuel OIl | 107091 | Tons per Annum | | RIL Jamnagar | Road | | 600 | Captive | | Copy of Linkage | (3.) | Natural Gas | 15857425 | Others | Nm3 | Gail pipeline | Others | Pipeline | 2 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 99 | 36 | 96 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 18.4 | 4.9 | 16 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 68 | 10 | 58 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 22.4 | 10.2 | 22.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.7 | 7.13 | 8.5 | 9.2 | (2.) | TDS | | | mg/l | | 1104 | 444 | 500 | 2000 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Total Hardness | | | mg/l | | 720 | 350 | 300 | 600 | (5.) | Chlorides | | | mg/l | | 325 | 88 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 1.26 | 0.18 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 11 | 3 | C | (2.) | COD | | NA | | 0 | 0 | C | (3.) | DO | | mg/l | | 4.2 | 3.2 | C | (4.) | pH | | NA | | 8.21 | 7.42 | C | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 73.4 | 48.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 68.7 | 43.3 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 2575 | 311 | (2.) | P(Phosphorus) | Kilogram per hectare | | 339.7 | 4.2 | (3.) | pH | | | 9.1 | 7.5 | (4.) | K(Potassium) | Kilogram per hectare | | 1755 | 179 | (5.) | Electric Conductivity | Others | ds/m | 4.05 | 0.10 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 28 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 25 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | french wells in Mahi river | 35000 | 20 | Copy of Permission Letter | Pipeline | | Others | french wells | VID/AB/IND/REQ.2016-17/RIL-Vadodara/1114 | 16 Mar 2016 | 40915 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | CT Blow Down | 5000 | 0 | Gardening | Green Belt Renewal Plant | | 5000 | | (2.) | Process/Service water/Domestic/DM | 19800 | 24000 | ETP | Others | VECL | 1000 | 18800 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 24800 | (b)Total Discharged Water (Kilolitre per Day) | 18800 | (c)Total Reused Water (Kilolitre per Day) | 6000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Non polymerized residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 5 | Road | | Others | secured landfill | (2.) | Highly flammable substance | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 95.87 | Tons | 0 | Road | | Others | collection/storage/incineration | (3.) | Process waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 28 | Tons | 0 | Road | | Others | collection/storage/incineration | (4.) | spent catalysts from LAB modificastion | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1700 | Tons | 25 | Road | | Authorized Recyclers | | (5.) | Ash | Fly Ash | | 6930 | Tons | 100 | Road | | Others | cement/brick/concrete making | (6.) | soiled waste | Bio-Medical Waste | | 0.30 | Tons | 20 | Road | | Others | biomedical waste disposal facility | (7.) | Contaminated cotton waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 0 | Road | | Others | collection/storage/incineration | (8.) | Furnace/reactor residue & debris | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 115.3 | Tons | 5 | Road | | Others | secured landfill/incineration | (9.) | Tarry residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 107.75 | Tons | 0 | Road | | Others | collection/storage/incineration | (10.) | Spent catalysts and molecular sieves | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50.086 | Tons | 5 | Road | | Others | secured land fill/sell to reg. recycler | (11.) | Oil emulsions (slop oil) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 909.19 | Tons | 0 | Road | | Others | collection/storage/incineration/sell | (12.) | Oily Sludge emulsions | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 92.53 | Tons | 0 | Road | | Others | collection/storage/incineration | (13.) | filters & filter mat. with organic liquids | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 21 | Tons | 0 | Road | | Others | collection/storage/incineration | (14.) | discrded medicine & cytotoxic drugs | Bio-Medical Waste | | 0.24 | Tons | 20 | Road | | Others | biomedical waste disposal facility | (15.) | Organic residues | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 115.16 | Tons | 0 | Road | | Others | collection/storage/incineration | (16.) | residues from preparation of VCM | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2500 | Tons | 0 | Road | | Others | incineration/sell | (17.) | Residues from preparation of ACN | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Tons | 5 | Road | | Others | secured landfill | (18.) | asbestos | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Tons | 5 | Road | | Others | secure landfill | (19.) | used/spent oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 450 | Tons | 0 | Road | | Others | collection/storage/sell/incinerator | (20.) | discarded containers | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10000 | Tons | 0 | Road | internal | Others | decontamination | (21.) | ash | Bottom Ash | | 2970 | Tons | 100 | Road | | Others | cement making | (22.) | Sharps | Bio-Medical Waste | | 0.36 | Tons | 20 | Road | | Others | biomedical waste disposal facility | (23.) | solid waste | Bio-Medical Waste | | 0.25 | Tons | 20 | Road | | Others | biomedical waste disposal facility | (24.) | Ash from incinerator | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20.43 | Tons | 0 | Road | | Others | collection/storage/incineration | (25.) | Acid Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Tons | 5 | Road | | Others | secure landfill/recylce/reuse | (26.) | ETP sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1315.07 | Tons | 5 | Road | | Others | Secure landfill/incineration | (27.) | Spent resin | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 100 | Tons | 5 | Road | | Others | collection/storage/secure landfill | (28.) | Copper scarp | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 25 | Road | | Authorized Recyclers | | (29.) | liquid waste | Bio-Medical Waste | | 9.6 | Tons | 20 | Road | | Others | biomedical waste disposal facility | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 96 | 0.9 | 1.61 | 98 | 100 | (2.) | NOx | | Microgram per Meter Cube | 22.4 | 0.7 | 12.6 | 36 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 68 | 0 | 0 | 69 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 18.4 | 0.7 | 3.24 | 22 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | GOP GT 1709 | NG/LSHS | 50.3 | 2.5 | SO2 | | 0.17 | (2.) | GOP GT 1709 | NG/LSHS | 50.3 | 2.5 | NOx | | 0.83 | (3.) | GOP GT 1710 | NG/LSHS | 50.3 | 2.5 | PM10 | | - | (4.) | GOP SH 107 & 108 | NG/FG/Methane | 65 | 1.755 | SO2 | | 0.60 | (5.) | GOP SH 107 & 108 | NG/FG/Methane | 65 | 1.755 | NOx | | 3 | (6.) | LAB PAH 1 | NG/LSHS/CBFS | 56 | 1.6 | SO2 | | 0.56 | (7.) | LAB PAH1 | NG/LSHS/CBFS | 56 | 1.6 | NOx | | 2.79 | (8.) | LAB PAH 2 | NG/LSHS/CBFS | 56 | 1.6 | PM10 | | 0.05 | (9.) | LAB PAH 2 | NG/LSHS/CBFS | 56 | 1.6 | SO2 | | 0.51 | (10.) | LAB HH1 | NG/LSHS | 30.48 | 0.8 | PM10 | | 0.004 | (11.) | LAB HH2 | NG/LSHS | 51.6 | 3 | PM10 | | 0.26 | (12.) | LAB HH2 | NG/LSHS | 51.6 | 3 | NOx | | 13.25 | (13.) | VC/PVC Cracker 201 | NG/FG | 48 | 1.4 | PM10 | | 0.01 | (14.) | VC/PVC Cracker 201 | NG/FG | 48 | 1.4 | SO2 | | 0.14 | (15.) | VC/PVC Cracker 201 | NG/FG | 48 | 1.4 | NOx | | 0.72 | (16.) | CPP HRSG 1 | NG/LSHS | 30 | 2.8 | PM10 | | 0.61 | (17.) | CPP HRSG 2 | NG/LSHS | 30 | 2.8 | NOx | | 28.35 | (18.) | CPP HRSG 1 | NG/LSHS | 30 | 2.8 | SO2 | | 6.10 | (19.) | GOP GT 1709 | NG/LSHS | 50.3 | 2.5 | PM10 | | - | (20.) | GOP GT 1710 | NG/LSHS | 50.3 | 2.5 | NOx | | 0.41 | (21.) | GOP SH 107/108 | NG/FG/Methane | 65 | 1.755 | PM10 | | - | (22.) | LAB PAH 1 | NG/LSHS/CBFS | 56 | 1.6 | PM10 | | 0.06 | (23.) | LAB HH1 | NG/LSHS | 30.48 | 0.8 | SO2 | | 0.04 | (24.) | LAN HH2 | NG/LSHS | 51.6 | 3 | SO2 | | 2.65 | (25.) | CPP HRSG1 | NG/LSHS | 30 | 2.8 | NOx | | 30.49 | (26.) | CPP HRSG 2 | NG/LSHS | 30 | 2.8 | PM10 | | 0.57 | (27.) | CPP HRSG2 | NG/LSHS | 30 | 2.8 | SO2 | | 5.67 | (28.) | VCm Srubber vent | - | 21.5 | 1.4 | PM10 | | - | (29.) | VCM Srubber vent | - | 21.5 | 1.4 | SO2 | | - | (30.) | VCM srubber vent | - | 21.5 | 1.4 | NOx | | - | (31.) | PVC dryer | - | 10 | 1.2 | SO2 | | - | (32.) | Petcoke boiler 1&2 | petcoke | 151 | 3.2 | NOx | | 8.92 | (33.) | CPVC Dryer | - | 27 | 0.6 | PM10 | | 0.56 | (34.) | CPVC dryer | - | 27 | 0.6 | SO2 | | - | (35.) | CPCV PVC unloading system | - | 10 | 0.3 | SO2 | | - | (36.) | CPVC srubber | - | 27 | 0.4 | SO2 | | - | (37.) | CPVC srubber | - | 27 | 0.4 | NOx | | - | (38.) | petcoke boiler1&2 | petcoke | 151 | 3.2 | SO2 | | 8.92 | (39.) | GOP GT 1710 | NG/LSHS | 50.3 | 2.5 | SO2 | | 0.08 | (40.) | LAB PAH 2 | NG/LSHS/CBFS | 56 | 1.6 | NOx | | 2.56 | (41.) | LAB HH1 | NG/LSHS | 30.48 | 0.8 | NOx | | 0.19 | (42.) | PVC dryer | - | 20 | 1.2 | NOx | | - | (43.) | petcoke boiler 1&2 | petrcoke | 151 | 3.2 | PM10 | | 2.68 | (44.) | PVC dryer | - | 10 | 1.2 | PM10 | | 0.14 | (45.) | CPVC Scrubber | - | 27 | 0.4 | PM10 | | - | (46.) | CPVC dryer | - | 27 | 0.6 | NOx | | - | (47.) | CPVC PVC unloading system | - | 10 | 0.3 | PM10 | | 0.15 | (48.) | CPVC PVC unloading system | - | 10 | 0.3 | NOx | | - | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 95000 | (b)Source | CPP | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 5 DG sets | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 350 | Total Land (ha.) | 350 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 350 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 350 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 135 | | (2.) | Green belt | | 105 | | (3.) | Others | Roads, Storage, Misc | 110 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | none | (2.) | NPA | NA | 0 | none | (3.) | ESAs | NA | 0 | none | (4.) | ESZs | NA | 0 | None | (5.) | Corridors | NA | 0 | none | (6.) | Wildlife Corridors | NA | 0 | none | (7.) | WLS | NA | 0 | none | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | None | (2.) | Forest | | NA | 0 | none | (3.) | Defence Installations | | NA | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 350 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1 Lakh | (iii)Period of Implementation | Continuous Activity | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 3000 | (c)Temporary Employment- During Construction | 200 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 365 | (f)Total Manpower | 3300 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 105 | 10.5 | 115.5 | (2.) | Percentage of Total Project Area | 30 | 3 | 33 | (3.) | No. of Plants | 73720 | 15000 | 88720 | (4.) | Funds Allocated | 17000000 | 100000 | 17100000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Existing plants already have robust management systems for quality, environment and occupational health and safety which are certified against the standards ISO 9001, ISO 14001,-OHSAS 18001 & ISO 50001 respectively. The same shall be extended to the proposed project as well. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0042 | (ii)Name of the EIA Consultant | Kadam Environmental Consultants | (iii)Address | 871/B/3, GIDC Makarpura, Vadodara, India – 390 010 | (iv)Mobile No. | 9714861611 | (v)Landline No. | 0265613100 | (vi)Email Id | kadam@kadamenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 26 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Relevant details against column 6 of Form-2 along with the the desired documents. Product details in column 9(b) need to be revisited vis-a-vis the schedule to the EIA Notification, 2006.
- Whether exemption from public hearing was allowed at the ToR stage itself. In any case, extant norms/guidelines of the Ministry in this regard is to be necessary followed.
- Permission for water withdrawal of 9 MGD is for 2016-17 only. What would be the scenario and the permission required for water withdrawal for the proposed expansion. | 06 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The reply to points from MoM of EAC meeting of Dec '19 is being submitted as this upload.
May please consider for further processing. | 23 Nov 2020 | 2. | ADS Raise Letter | Please see the attached letter for necessary action. | 20 Feb 2020 | 3. | ADS Reply Letter | Dear Sir,
Please find attached herewith the Pointwise response against the Additional Inputs/clarifications sought as per the EAC MOM uploaded to MoEF& CC website on 6th October 2019. | 27 Nov 2019 | 4. | NA | Deferred
| 06 Oct 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Prashant Gogate | Designation | Vice President | Name of Company (Applicant Name should not be given here) | Reliance Industries Limited | Address | Bldg. No. 7, B Wing, 2nd Floor,
Reliance Corporate Park,
Thane Belapur Road,
Ghansoli,
Navi Mumb |
|