Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Badaun Lift Canal project at District District Badaun, Uttar Pradesh
(b)Name of the Company / Organisation UTTAR PRADESH IRRIGATION DEPARTMENT
(c)Registered Address Cant Road, Udayganj, Lucknow,,Lucknow,Uttar Pradesh-226027
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Kumar Singh
(b)Designation (Owner/ Partner/ CEO) Chief Engineer
(c)Address Moradabad,,Moradabad,Moradabad,Uttar Pradesh-244001
(d)Pin code 244001
(e)E-mail mcrodelhi@gmail.com
(f)STD Code. 522(f)Telephone No. 2435869
(g)Fax No. 2202152
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity1(c) River Valley projects
(b)Category A
(c)Proposal Number IA/UP/RIV/26603/2015
(d)Master Proposal Number(Single Window) SW/99691/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Nil
(b)Pincode 244001
(c)Bounded Latitudes (North)
From
Degree 28.1167
Minutes
Second
From
Degree 28.194444
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.4056
Minutes
Second
From
Degree 79.189
Minutes
Second
(e)Survey of India Topo Sheet No. 53 L/8, L/11, L/12, L/15, L/16; 53 P/3, 53 P/4, 54
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 183
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshBudaunGunnaur
(2.)Uttar PradeshBudaunBisauli
(3.)Uttar PradeshBudaunBilsi
(4.)Uttar PradeshBudaunSahaswan
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/2/2015-IA-1>
(b)Date of Apply of TOR 23 Jan 2015
(c)Date of Issue of TOR / Standard ToR 09 Apr 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :25
Collectorate Auditorium, Badaun
State :Uttar Pradesh
District :Budaun
Tehsil :Budaun
Village :Budaun
35What will be the effect on Air, Water, Noise and Soil due to the proposed project and what will be its mitigation measuresDistrict Magistrate
(2.)
Date of Advertisement :16 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :3
Block Office
State :Uttar Pradesh
District :Sambhal
Tehsil :No Data
Village :Gannaur
44Land compensation related querriesDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Baudaun Lift Canal199522 ha.Gross Command Area
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Baudaun Lift Canal139665HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3128.39
(b) Funds Allocated for Environment Management (Capital) (in Crores) 414.89
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 13.67
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2650000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2650000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aggregate2350000Cubic Meter per DayApproved Stone crusherRoad150 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 30 Sep 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube49.932.548.902100
(2.)PM2.5Micro Gram per Meter Cube41.523.640.6760
(3.)SO2Micro Gram per Meter Cube9.95.09.7080
(4.)NOxMicro Gram per Meter Cube13.710.213.42680
    14.2.     No. of Ground Water monitoring locations : 25
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA8.37.26.58.5
(3.)TDSmg/l371.2228.85002000
(4.)Total Hardnessmg/l231.2138.23200600
(5.)Chloridesmg/l27.611.62501000
(6.)Fluoridemg/l0.780.3311.5
(7.)Heavy MetalsIronmg/l0.210.090.30
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.07.5C
(2.)BODmg/l5.04.2C
(3.)OthersTDSmg/l258.2198.92C
(4.)DOmg/l7.97.2C
(5.)CODmg/l9.808.3C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.334.345
(2.)Leq(Day)A-weighted decibels(dB(A))60.145.465
    14.5.     No. of Soil Sample Monitored locations : 30
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram151.550.6
(2.)P(Phosphorus)Milligram per Kilogram11.055.4
(3.)K(Potassium)Milligram per Kilogram233.164.3
(4.)Electric ConductivityMillisiemens per Centimetre301.2215
(5.)pH7.836.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.50 To 3.38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.10 To 2.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface27000 Not Appliacble CanalBarrageNIL04 Apr 20182700
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NIL00NILGreen Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid wasteMunicipal Solid Waste135Tons5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube13.70.0250.1313.8480
(2.)PM2.5Microgram per Meter Cube0000.160
(3.)Others(Specify)COMicrogram per Meter Cube0000.14
(4.)PM10Microgram per Meter Cube49.90.02512.462.4100
(5.)SO2Microgram per Meter Cube0000.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source Madhyanchal Vidyut Vitaran Nigam Limited, Lucknow
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 504.26
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 504.26
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 454
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 9.91
(e)Settlements (ha.) 40.35
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 504.26000000000005
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersLift Canal Project504.26
Total (ha.) 504.26
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANIL0NA
(2.)ESAsNone0NA
(3.)CorridorsNone0NA
(4.)Critically Polluted AreaNone0NA
(5.)Wildlife CorridorsNone0NA
(6.)ESZsNone0NA
(7.)WLSNIL0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0NA
(2.)Archaeological SitesNone0NA
(3.)Defence InstallationsNone0NA
(4.)OthersNANone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 750
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 504.26
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 37944
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area River Ganga
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 1800
(d)Temporary Employment- During Operation 0
(e)No. of working days 340
(f)Total Manpower 1850
32.
Green Belt in Ha:
(a)Total Area of Green Belt 166.32
(b)Percentage of Total Project Area 32.98
(c)No. of Plants to be Planted 23500
(d)Funds Allocated for Plantation 29500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThere will be number of positive changes on the socio-economic conditions of the people in the surrounding area. There will be obvious change in the scenario leading into the Socio-economic development of the area such as Increased Irrigation Potential, Better Living Standards, Improved Market Facilities, Employment Potential / Fisheries, Tourism / Recreation Facilities, Sustained Water Availability for Agriculture and Cattle rearing, Increased Green cover, Improvement in Ground Water Level, Imp
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Ganga
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Lift Irrigation Scheme000199522139665104749199522
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %00NA
(2.)90 %00NA
(3.)75 %00NA
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 76.686
(c) Utilized for Construction (in cubic meter)31.166
(d) No. of Muck Disposal sites01
(e) Total Muck Disposal Area (in hectare)130
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 15
(c) Name of the umbrella Fish Species (Scientific Name)Anabas testidinius, Catla catla, Cirrhina mrigala,
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Non-Lean Non-Monsoon00
(2.)Lean8.6481.8
(3.)Monsoon00
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 48
(ii)Name of the EIA Consultant Enviro Infra Solution Pvt. Ltd
(iii)Address 301, 302 SRBC Building Sector 9 Vasundhara Ghaziabad
(iv)Mobile No. 9818922344
(v)Landline No. 0120415118
(vi)Email Id eis@enviroinfrasolutions.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterREPLY TO ADDITIONAL INFORMATIONS DESIRED BY EAC DURING ITS 23RD MEETING ON DATED 23.04.2019 FOR AGENDA ITEM NO. 23.4: BADAUN LIFT CANAL PROJECT DISTRICT BADAUN, UTTAR PRADESH BY M/S EASTERN GANGA CANAL, IRRIGATION DEPARTMENT, UTTAR PRADESH 23 Nov 2020
2.NAPlease submit the requisite information through Parivesh Portal 20 Nov 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Kumar Singh
DesignationChief Engineer
Name of Company (Applicant Name should not be given here)UTTAR PRADESH IRRIGATION DEPARTMENT
AddressCant Road, Udayganj, Lucknow
Print