1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Badaun Lift Canal project at District District Badaun, Uttar Pradesh | (b)Name of the Company / Organisation | UTTAR PRADESH IRRIGATION DEPARTMENT | (c)Registered Address | Cant Road, Udayganj, Lucknow,,Lucknow,Uttar Pradesh-226027 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ajay Kumar Singh | (b)Designation (Owner/ Partner/ CEO) | Chief Engineer | (c)Address | Moradabad,,Moradabad,Moradabad,Uttar Pradesh-244001 | (d)Pin code | 244001 | (e)E-mail | mcrodelhi@gmail.com | (f)STD Code. | 522(f)Telephone No. | 2435869 | (g)Fax No. | 2202152 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(c) River Valley projects
| Minor Activity | 1(c) River Valley projects
| (b)Category | A | (c)Proposal Number | IA/UP/RIV/26603/2015 | (d)Master Proposal Number(Single Window) | SW/99691/2019 | (e)EAC concerned (for category A Projects only) | River Valley and Hydroelectric Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Nil | (b)Pincode | 244001 | (c)Bounded Latitudes (North) | | From | | Degree | 28.1167 | Minutes | | Second | | From | | Degree | 28.194444 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.4056 | Minutes | | Second | | From | | Degree | 79.189 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53 L/8, L/11, L/12, L/15, L/16; 53 P/3, 53 P/4, 54 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 183 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Uttar Pradesh | Budaun | Gunnaur | | (2.) | Uttar Pradesh | Budaun | Bisauli | | (3.) | Uttar Pradesh | Budaun | Bilsi | | (4.) | Uttar Pradesh | Budaun | Sahaswan | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-12011/2/2015-IA-1> | (b)Date of Apply of TOR | 23 Jan 2015 | (c)Date of Issue of TOR / Standard ToR | 09 Apr 2015 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 25 |
| Collectorate Auditorium, Badaun | State : | Uttar Pradesh | District : | Budaun | Tehsil : | Budaun | Village : | Budaun |
| 35 | What will be the effect on Air, Water, Noise and Soil due to the proposed project and what will be its mitigation measures | District Magistrate | | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| Block Office | State : | Uttar Pradesh | District : | Sambhal | Tehsil : | No Data | Village : | Gannaur |
| 44 | Land compensation related querries | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Baudaun Lift Canal | 199522 ha. | Gross Command Area | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Baudaun Lift Canal | 139665 | Hectares | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3128.39 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 414.89 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 13.67 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2650000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2650000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Aggregate | 2350000 | Cubic Meter per Day | | Approved Stone crusher | Road | | 150 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 30 Sep 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 49.9 | 32.5 | 48.902 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 41.5 | 23.6 | 40.67 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 9.9 | 5.0 | 9.70 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 13.7 | 10.2 | 13.426 | 80 | |
14.2. No. of Ground Water monitoring locations : 25 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | pH | | | NA | | 8.3 | 7.2 | 6.5 | 8.5 | (3.) | TDS | | | mg/l | | 371.2 | 228.8 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 231.2 | 138.23 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 27.6 | 11.6 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.78 | 0.33 | 1 | 1.5 | (7.) | Heavy Metals | | Iron | mg/l | | 0.21 | 0.09 | 0.3 | 0 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.0 | 7.5 | C | (2.) | BOD | | mg/l | | 5.0 | 4.2 | C | (3.) | Others | TDS | mg/l | | 258.2 | 198.92 | C | (4.) | DO | | mg/l | | 7.9 | 7.2 | C | (5.) | COD | | mg/l | | 9.80 | 8.3 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 46.3 | 34.3 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 60.1 | 45.4 | 65 | |
14.5. No. of Soil Sample Monitored locations : 30 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 151.5 | 50.6 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 11.05 | 5.4 | (3.) | K(Potassium) | Milligram per Kilogram | | 233.1 | 64.3 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 301.2 | 215 | (5.) | pH | | | 7.83 | 6.19 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 13.50 To 3.38 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14.10 To 2.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 2700 | 0 | Not Appliacble | Canal | | Barrage | | NIL | 04 Apr 2018 | 2700 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NIL | 0 | 0 | NIL | Green Belt Renewal Plant | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid waste | Municipal Solid Waste | | 135 | Tons | 5 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 13.7 | 0.025 | 0.13 | 13.84 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 60 | (3.) | Others(Specify) | CO | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 4 | (4.) | PM10 | | Microgram per Meter Cube | 49.9 | 0.025 | 12.4 | 62.4 | 100 | (5.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200 | (b)Source | Madhyanchal Vidyut Vitaran Nigam Limited, Lucknow | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 504.26 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 504.26 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 454 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 9.91 | (e)Settlements (ha.) | 40.35 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 504.26000000000005 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Lift Canal Project | 504.26 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NIL | 0 | NA | (2.) | ESAs | None | 0 | NA | (3.) | Corridors | None | 0 | NA | (4.) | Critically Polluted Area | None | 0 | NA | (5.) | Wildlife Corridors | None | 0 | NA | (6.) | ESZs | None | 0 | NA | (7.) | WLS | NIL | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | NA | (2.) | Archaeological Sites | | None | 0 | NA | (3.) | Defence Installations | | None | 0 | NA | (4.) | Others | NA | None | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 750 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 504.26 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 37944 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Leopard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | River Ganga | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 25 | (b)Permanent Employment-During Operation | 25 | (c)Temporary Employment- During Construction | 1800 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 340 | (f)Total Manpower | 1850 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 166.32 | (b)Percentage of Total Project Area | 32.98 | (c)No. of Plants to be Planted | 23500 | (d)Funds Allocated for Plantation | 29500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | There will be number of positive changes on the socio-economic conditions of the people in the surrounding area. There will be obvious change in the scenario leading into the Socio-economic development of the area such as Increased Irrigation Potential, Better Living Standards, Improved Market Facilities, Employment Potential / Fisheries, Tourism / Recreation Facilities, Sustained Water Availability for Agriculture and Cattle rearing, Increased Green cover, Improvement in Ground Water Level, Imp | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For River Valley and Hydroelectric Projects |
|
1. | Project Sub Sector | Irrigation Project | 2. | Name of the River | Ganga | 3. | Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? | No |
|
|
4. Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme) |
---|
S. No. | Project Type | Dam Height (in meters) | Dam Length (in meters) | Total Submergence Area (in hectare) | Gross Command Area (GCA) (in hectare) | Irrigable Command Area (ICA) (in hectare) | Culturable Command Area (CCA) (in hectare) | Total Command Area (in hectare) |
---|
(1.) | Lift Irrigation Scheme | 0 | 0 | 0 | 199522 | 139665 | 104749 | 199522 | |
5. | Powerhouse Installed Capacity | No | (a) Type of Powerhouse | Surface | (b) Capacity (in megawatts) | 0 | (c) No. of Tunnels | 0 | (d) No. of Units | 0 | (e) Bank of River | Left |
|
|
6. | Generation of Electricity Annually. | (a) Quantity of Generation of Electricity Annually (in giga watt hours) | 0 | (b) Water Availability at Various percentage | S. No. | Percentage | Water availability (in cusecs) | Dependable year | Remarks |
---|
(1.) | 50 % | 0 | 0 | NA | (2.) | 90 % | 0 | 0 | NA | (3.) | 75 % | 0 | 0 | NA | | (c) Machine Availability (in percent) | 0 | (d) Cost of Electricity Generation (in INR) | 0 | (e) Internal Rate of Return (in percent) | 0 | (f) Year of achievement of Internal Rate of Return | 0 |
| 7. | Catchment Area Treatment Plan | Copy of Catchment Plan | 8. | Muck Management Plan | (a)Muck Management Plan | Copy of Muck Management Plan | (b) Total Excavation Muck (in cubic meter) | 76.686 | (c) Utilized for Construction (in cubic meter) | 31.166 | (d) No. of Muck Disposal sites | 01 | (e) Total Muck Disposal Area (in hectare) | 130 |
| 9. | Fishery Development and Management Plan | (a)Fishery Development and Management Plan | Copy of Fishery Development and Management Plan | (b) No. of Fish Species | 15 | (c) Name of the umbrella Fish Species (Scientific Name) | Anabas testidinius, Catla catla, Cirrhina mrigala, |
| 10. | Status of Environmental Flow | S. No. | Season | Average Inflow (in cumec) | Percent of Flow |
---|
(1.) | Non-Lean Non-Monsoon | 0 | 0 | (2.) | Lean | 8.64 | 81.8 | (3.) | Monsoon | 0 | 0 | |
| 11. | Free Flow Stretch (in km) | 0 | 12. | Approval of Central Water Commission | No |
| 13. | Approval of Central Electricity Authority | No |
| 14. | Details of Coffer Dam (Upstream) | None |
| 15. | Details of Coffer Dam (Downstream) | None |
| |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 48 | (ii)Name of the EIA Consultant | Enviro Infra Solution Pvt. Ltd | (iii)Address | 301, 302 SRBC Building Sector 9 Vasundhara Ghaziabad | (iv)Mobile No. | 9818922344 | (v)Landline No. | 0120415118 | (vi)Email Id | eis@enviroinfrasolutions.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | River Valley and Hydroelectric Projects | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | REPLY TO ADDITIONAL INFORMATIONS DESIRED BY EAC DURING ITS 23RD MEETING ON DATED 23.04.2019 FOR AGENDA ITEM NO. 23.4: BADAUN LIFT CANAL PROJECT DISTRICT BADAUN, UTTAR PRADESH BY M/S EASTERN GANGA CANAL, IRRIGATION DEPARTMENT, UTTAR PRADESH | 23 Nov 2020 | 2. | NA | Please submit the requisite information through Parivesh Portal | 20 Nov 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ajay Kumar Singh | Designation | Chief Engineer | Name of Company (Applicant Name should not be given here) | UTTAR PRADESH IRRIGATION DEPARTMENT | Address | Cant Road, Udayganj, Lucknow |
|