Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kubri lime stone and bauxite mine
(b)Name of the Company / Organisation SUKHDEO PRASHAD GOENKA
(c)Registered Address M/s Sukhdeo Prasad Goenka, Goenka Bhawan Station Road,,Katni,Madhya Pradesh-483501
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Anand Goenka
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address Goenka Bhawan, Station Road,,,Murwara,Katni,Madhya Pradesh-483501
(d)Pin code 483501
(e)E-mail ashokchunawala5555@yahoo.com
(f)STD Code. 7622(f)Telephone No. 404937
(g)Fax No. 404937
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category B1
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry as per gazette notification dated 14/08/2018 the proposal is to be considered in SEIA M.P.
(c)Proposal Number IA/MP/MIN/99541/2016
(d)Master Proposal Number(Single Window) SW/99535/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 27,29,30p,31p,32p,33,34,35p,110p,112,113,114,119,1
(b)Pincode 483501
(c)Bounded Latitudes (North)
From
Degree 240649
Minutes
Second
From
Degree 240738
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 804744
Minutes
Second
From
Degree 80475.7
Minutes
Second
(e)Survey of India Topo Sheet No. 63D/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 390
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaAdilabadTamsiKorata
(2.)MaharashtraYavatmalKelapurChannaka
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA/MP/MIN/58931/2016
(b)Date of Apply of TOR 12 Sep 2016
(c)Date of Issue of TOR / Standard ToR 28 Mar 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Nov 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Dec 2017
Distance of Public Hearing Venue from the Proposed Project :.100
mine site
State :Madhya Pradesh
District :Satna
Tehsil :Maihar
Village :Kubri
54there should not be any damage to environment and mine should run as per approved norms. Employment should be given to local people on priorityDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)hydraluic excavator1.1for loading
(2.)dumper25for transportation
(3.)dozer155for road maintenance and for dumping
(4.)wagon drill110for drilling blast hole
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)waste and soil658Cubic Meter per DayRoad
(2.)Lime stone637205Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.00
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.10
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel1Kilo Litre per DaynoRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube1281060
(2.)NOxMicro Gram per Meter Cube1291160
(3.)PM10Micro Gram per Meter Cube35253060
(4.)SO2Micro Gram per Meter Cube1281060
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.0077
(2.)TSSmg/l153120200500
(3.)Heavy MetalsCNmg/l0.040.02200.05
(4.)Fluoridemg/l0.390.0901.2
(5.)TDSmg/l151100100500
(6.)Total Hardnessmg/l187157100300
(7.)Chloridesmg/l15599.610250
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l8.26.9E
(2.)CODmg/l3327.6E
(3.)BODmg/l1.70.8E
(4.)pHNA8.27.9E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))524975
(2.)Leq(Night)A-weighted decibels(dB(A))383670
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare2519
(2.)N(Nitrogen)Kilogram per hectare288219
(3.)K(Potassium)Kilogram per hectare142131
(4.)pHOthersno unit assigned7.26.1
(5.)Electric ConductivityMillisiemens per Centimetre0.300.19
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.3 To 9.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.1 To 8.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater8.30Copy of Permission LettermodeOthersfrom water tankerOpen Wellcgwb mail28 Mar 20188
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)ground water10362000sedimentation tankDischarge into Surface Water Body1036
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1036
(b)Total Discharged Water (Kilolitre per Day) 1036
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)overburdenOtherscapping above mineral33537Tons0.20RoadOtherswill be back filled and reclaimed
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube120.2051860
(2.)PM10Microgram per Meter Cube330.201044100
(3.)NOxMicrogram per Meter Cube130.2001460
(4.)SO2Microgram per Meter Cube120.2001360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000000Othersno pollutant00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 00
(b)Source 00
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 000
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 30
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 39.301
    Total Land (ha.) 69.301
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 30
(b)Waste/Barren Land (ha.) 39.301
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 00
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : no other land 00
    Total (ha.) 69.301
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt5.58
(2.)Built Up Area0.10
(3.)Water Reservoir29.29
(4.)Quarry Area34.33
Total (ha.) 69.3
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA0000nil
(2.)ESZs0000nil
(3.)Critically Polluted Area0000no critically plouted area
(4.)WLS0000no wls
(5.)ESAs0000nil
(6.)Wildlife Corridors0000no coridor
(7.)Corridors0000no coridor
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installations0000no defence installation
(2.)Forestno00no forest area
(3.)Archaeological Sites0000no
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4
(b)Land yet to be acquired(Ha) 65.301
(c)Status of Land acquisition if not acquired in progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 1
(c)No. of PDFs (Project Displaced Families) 1
(d)No. of PAFs (Project Affected Families) 1
(e)Funds Allocated for R&R(in INR) (in Lacs) 2.5
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 3
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 30
(e)No. of working days 250
(f)Total Manpower 33
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.58
(b)Percentage of Total Project Area 8.05
(c)No. of Plants to be Planted 14000
(d)Funds Allocated for Plantation 5.00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalbetter management of resource
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 3
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)lime stoneMajor
(2.)BauxiteMajor
(3.)clayMinor
2.
Mine Capacity in ROM (Run of Mine) 637205
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MP/SATNA/LIMESTONE/MPLM/MOD-29/2015-16/2225
(b)Date of Approval 26 Jul 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 69.301
(f)Approved Capacity 637205
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 45971480
(b)Mineable Reserves (Million Ton) 43672906
(c)Extractable Reserves(Million Ton) 25918007
(d)Percent(%) of Extraction 60
(e)Grade of Coal /Ore /Mineral cement grade
(f)Stripping Ratio 1 : 0.04
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 5
(i)Mining Method Opencast
(j)Life of Mine (Years) 44
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 69.301
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 11 Oct 2010
(iii)Validity of LOI 30
(iv)Reference No. of LOI f3-304/84/12/2
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 69.301
(iii)Validity of the lease deed From : 19 Aug 2014 To : 18 Aug 2044
(iv)Date of Execution of Mining Lese 19 Aug 2014
(v)Reference Number f-3-2/09/12/2
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof initial lease
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 00
(ii)Total Area (in Hectare) 00
(iii)Height (in meter) 00
(iv)Quantity (in Million Cubic meter) 00
(v)No. of year back fill up 00
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.8374
(iii)Height (in meter) 10
(iv)Quantity (in Million Cubic meter) 8374
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 00
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 00
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 00
11.
Details of Final Mine Void:
(a)Area (in Hectare) 40.6810
(b)Depth (in meter) 30
(c)Volume (in Million Cubic meter) 1220.43
12.
Details of Quarry:
(a)Final Void of 40.680 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 69.301
13.
Details of Transportation:
(a)In Pit/Underground to Surface road
(b)Surface to Siding/Loading road
(c)Transportation / Conveyor Details dump truck
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND30030
(2.)SURFACE WATER BODIES000
(3.)SETTLEMENTS000
(4.)WASTE LAND39.301039.301
(5.)FOREST LAND000
(6.)GRAZING LAND000
TOTAL69.301069.301
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT5.5765005.5765
(2.)ROADS0.20000.2
(3.)INTERNAL OB DUMPS0000
(4.)EXTERNAL OB DUMPS0000
(5.)VIRGIN AREA3.3003.3
(6.)EXCAVATION/QUARRY11.388529.29250.140.781
(7.)BUILT UP AREA (COLONY/OFFICE)0.1000.1
(8.)TOP SOIL STORAGE0000
TOTAL20.56529.29250.1049.9575
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 40.6810
(d)Safety Zone(in hectare) 10
(e)Final Void of 29.2925 (hectare) at a Depth of 3 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20180063720500
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QC/NABAT/ENV/0048
(ii)Name of the EIA Consultant csir cimfr
(iii)Address CSIR-CIFR Barwa Road Dhanbad
(iv)Mobile No. 9431122489
(v)Landline No. 0326229607
(vi)Email Id chakrabortymrinal09@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report Copy of District Survey Report
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data Copy of Replenishment Study Report & Baseline Survey Data
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per Ministry’s Notification 14th August, 2018 the proposal is covered under Category-B proposal may kindly apply respective SEIAA/SEAC. 11 Apr 2019
2.NAThe correction have been made as per the instruction received 15 Apr 2019
3.NAAs per Ministry’s Notification S.O. 3977(E) dated 14th August, 2018 the proposal is covered under Category-B proposal may kindly apply respective SEIAA/SEAC. 08 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnand Goenka
DesignationProprietor
Name of Company (Applicant Name should not be given here)SUKHDEO PRASHAD GOENKA
AddressM/s Sukhdeo Prasad Goenka, Goenka Bhawan Station Road