Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mumbai Ahmedabad High Speed Railway Project
(b)Name of the Company / Organisation NATIONAL HIGH SPEED RAIL CORPORATION LTD
(c)Registered Address Asia Bhawan, Second Floor,Road No 205, Sector-9, Dwarka,South West,Delhi-110077
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant ANJUM PERVEZ
(b)Designation (Owner/ Partner/ CEO) OSD
(c)Address NATIONAL HIGH SPEED RAIL CORPORATION LTD,ASIA BHAWAN, SECOND FLOOR, ROAD NO.-205, SECTOR-9, DWARKA, NEW DELHI,Najafgarh,South West,Delhi-110077
(d)Pin code 110077
(e)E-mail nhsrcl.moefcc@nhsrcl.in
(f)STD Code. 11(f)Telephone No. 28070001
(g)Fax No. 28070250
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIS/99096/2019
(d)Master Proposal Number(Single Window) SW/99091/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 512
(b)Pincode 400051
(c)Bounded Latitudes (North)
From
Degree 190617
Minutes
Second
From
Degree 190640
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 728441
Minutes
Second
From
Degree 7308
Minutes
Second
(e)Survey of India Topo Sheet No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 2
(c)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It does not attract EIA Notification 2006
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)High Seeed Train508.17km350 km per/h maximum speed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Railway track, viaduct, tunnel508.17KilometersRail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 108000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 16600
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 30000
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 332
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 60960000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 60960000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Steel20320Tons per Annum600Rail300 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 May 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube82.540.165.1100
(2.)SO2Micro Gram per Meter Cube16.55.612.580
(3.)NOxMicro Gram per Meter Cube20.110.514.280
(4.)PM2.5Micro Gram per Meter Cube74.940.857.860
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.86.27.58.5
(2.)Fluoridemg/l0.580.1511.5
(3.)TSSmg/l123.550100
(4.)TDSmg/l5323175002000
(5.)Total Hardnessmg/l26082200600
(6.)Chloridesmg/l95522501000
    14.3.     No. of Surface Water monitoring locations : 13
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.856.87C
(2.)DOmg/l6.41.1C
(3.)BODmg/l17210C
(4.)CODmg/l54436C
    14.4.     No. of Ambient Noise monitoring locations : 31
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))63.232.270
(2.)Leq(Day)A-weighted decibels(dB(A))81.544.275
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.87.1
(2.)K(Potassium)Kilogram per hectare240102
(3.)P(Phosphorus)Kilogram per hectare25.610.2
(4.)Electric ConductivityMillisiemens per Centimetre5.12.2
(5.)N(Nitrogen)Kilogram per hectare510140
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.5 To 88.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.50 To 14.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker248002Copy of Permission LettermodeOthersBy RoadOthersPiped suppliedAnnexure-411 Jun 201824800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Domestic350440Root Zone TreatmentGreen Belt Renewal Plant350
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 350
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 350
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)C & D wasteConstruction & Demolition Waste1326000Tons1.5RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube74.90.752.777.62760
(2.)SO2Microgram per Meter Cube16.50.7502.522.580
(3.)NOxMicrogram per Meter Cube20.10.7503.625.880
(4.)PM10Microgram per Meter Cube82.50.7505.692.5100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD16.50.85PM105.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 23400
(b)Source Maharashtra State Power Generation Co. Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3 at every station
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 137.1486
(b)Private Land (ha.) 1022.37
(c)Government Land (ha.) 274.7614
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.00
    Total Land (ha.) 1434.28
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 700.52
(b)Waste/Barren Land (ha.) 200.52
(c)Grazing/ Community Land (ha.) 10.50
(d)Surface Water Bodies (ha.) 10.5
(e)Settlements (ha.) 45.00
(f)Industrial (ha.) 50.64
(g)Forest (ha.) 137.1486
(h)Mangroves (ha.) 13.500
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Rocky 265.9514
    Total (ha.) 1434.28
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersRailway station10Land requirement varies from station to station
(2.)Township75.56
(3.)Safety Zone75.56
Total (ha.) 161.12
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSThane Creek Flamingo Sanctuary0MAHSR alignment passes through under tunnel
(2.)ESZsTWLS17.20Not required
(3.)CorridorsNone0.00Not required
(4.)Wildlife CorridorsNone0.00Not required
(5.)ESAsSanjay Gandhi National Park15.20Not required
(6.)Critically Polluted AreaNone0.0Not required
(7.)NPANone0.0Not required
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesJhulta Minar2.5Not Required
(2.)Defence InstallationsCantonment area in Mumai5.5Not Required
(3.)OthersHeritage BuildingAhmedaad Rly Station4.5Not Required
(4.)ForestMangrove Forest0.00Pending with RO MOEFCC Nagpur
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 53467
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 660.50
(b)Land yet to be acquired(Ha) 773.78
(c)Status of Land acquisition if not acquired Not available
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Creek River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2000
(b)Permanent Employment-During Operation 4000
(c)Temporary Employment- During Construction 16000
(d)Temporary Employment- During Operation 2000
(e)No. of working days 365
(f)Total Manpower 24000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 143.428
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 7171400
(d)Funds Allocated for Plantation 1000000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalReduction in Green House Gas emission, Increase in green cover along entire stretch of MAHSR alignment
(2.)FinancialSaving in fuel expenditure, Saving in expenditure incurred on import of crude oil
(3.)SocialImproved social infrastructure, Employment opportunities, Easy connectivity between business hubs
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 25
(b)Total No. of Flats to be Build 20
(c)No. of Buildings 3
(d)Total plot area (sqm) 100000
(e)Total built up area (sqm) 75000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 5000
(c)No. of Recharge Pits 5
(d)Capacity 1000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 5000
5.
Energy Saving Measures:
(a)Source/Mode Solar PV
(b)Percentage 5
(c)Quantity 390
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No adverse impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant It does not attract EIA Notification 2006
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease upload the Maharashtra CZMA's recommendation for further n/a 14 Mar 2019
2.NAThe correction have been made as per the instruction received 14 Mar 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantANJUM PERVEZ
DesignationOSD
Name of Company (Applicant Name should not be given here)NATIONAL HIGH SPEED RAIL CORPORATION LTD
AddressAsia Bhawan, Second Floor
Print