Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) LNG Regasification Terminal on the bank of Hooghly River at Kukrahati, West Bengal
(b)Name of the Company / Organisation BENGAL CONCESSIONS PRIVATE LIMITED
(c)Registered Address 514, Dalamal Towers, 211, FPJ Marg, Nariman point, Mumbai, India,,Mumbai City,Maharashtra-400021
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Abhirup Bhattacharya
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 12th floor, Hiranandani Knowledge Park, Hiranandani Gardens, Powai, Mumbai,,Mumbai,Mumbai City,Maharashtra-400021
(d)Pin code 400021
(e)E-mail abhattacharya@in.henergy.com
(f)STD Code. 22(f)Telephone No. 25715100
(g)Fax No. 25763777
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
Minor Activity8(a) Building and Construction projects
(b)Category A
(c)Proposal Number IA/WB/IND2/69588/2017
(d)Master Proposal Number(Single Window) SW/98885/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 7 to 108, 104/139,7/140,41/141,41/142,41/
(b)Pincode 721635
(c)Bounded Latitudes (North)
From
Degree 22.186839
Minutes
Second
From
Degree 22.191652
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 88.105115
Minutes
Second
From
Degree 88.112697
Minutes
Second
(e)Survey of India Topo Sheet No. F45K4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalEast MedinipurSutahata - I
(2.)TelanganaAdilabadTamsiKorata
(3.)MaharashtraYavatmalKelapurChanakha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/472/2017-IA-II(I)
(b)Date of Apply of TOR 05 Oct 2017
(c)Date of Issue of TOR / Standard ToR 16 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :12.2
SDO Office Haldia
State :West Bengal
District :East Medinipur
Tehsil :Sutahata - I
Village :Durgachak
41Development of site approach road, benefit to locals, impact to crematorium and nallah close to site, safety of school childrenOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LNG Regasification terminal5MMTPAInitial 3 MMTPA. Maximum 5 MMTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LNG/RLNG5000000Tons per AnnumRoad,Pipe Conveyor,OthersShip
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1500
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.2057
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5000000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5000000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Natural Gas5000000Tons per AnnumLocal supplierOthersShip1000 OthersProposedCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 25 Oct 2017 To 15 Jan 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube11.84.29.580
(2.)PM2.5Micro Gram per Meter Cube73135960
(3.)PM10Micro Gram per Meter Cube13423102.86100
(4.)NOxMicro Gram per Meter Cube36.513.334.380
(5.)OthersCOMili Gram per Meter Cube0.950.120.872
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersno unit7.687.26.58.5
(2.)TDSmg/l9846405002000
(3.)Heavy MetalsCadmiummg/l0.0010.0010.0030.003
(4.)Fluoridemg/l0.420.2911.5
(5.)Total Hardnessmg/l256200300600
(6.)TSSOthersnot analyzed0000
(7.)Chloridesmg/l3281052501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.25.9B
(2.)CODmg/l124B
(3.)pHOthersNo unit7.287.18A
(4.)OthersTotal ColiformOthersMPN/100ml4900350C
(5.)BODmg/l2.22.0B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))48.538.545
(2.)Leq(Day)A-weighted decibels(dB(A))61.951.555
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersno unit7.826.66
(2.)Electric ConductivityMillisiemens per Centimetre1420551
(3.)N(Nitrogen)Milligram per Kilogram18970
(4.)K(Potassium)Milligram per Kilogram27882
(5.)P(Phosphorus)Milligram per Kilogram8.03.0
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.34 To 3.05
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.63 To 2.71
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSupply water320Copy of Permission LettermodeOthersWater tankersOthersSupply waterApplication to be filed11 Mar 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater2.45Sewage Treatment PlantReuse within the Plant & Recycling2.4
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2.4
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 2.4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Oily wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre20RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Municipal solid wasteMunicipal Solid Waste109.5Tons20RoadOthersTo be handed over to municipal authorities
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube660.31.8667.8601100
(2.)SO2Microgram per Meter Cube6.00.30.906.90000180
(3.)PM2.5NA0000.0000160
(4.)NOxMicrogram per Meter Cube25.00.33.4028.40000180
(5.)Others(Specify)COMicrogram per Meter Cube10000.321.681021.68000012000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Gas generatorNatural Gas301.66PM100.23
(2.)Gas generatorNatural Gas301.66NOx1.59
(3.)Gas generatorNatural Gas301.66OthersCO0.682
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 23000
(b)Source Power will be sourced from WBSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x11.5 MW Gas turbines, 2X 500 KW DG sets
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 4.6
(c)Government Land (ha.) 15
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 19.6
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 4.6
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 15
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : none 0
    Total (ha.) 19.6
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.76
(2.)Built Up Area1.62
(3.)Green belt6.50
(4.)OthersArea for future expansion, parking9.72
Total (ha.) 19.6
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone10No National Parks within 10 km
(2.)WLSNone10No WLS within 10 km
(3.)ESZsNone10No ESZs within 10 km
(4.)Critically Polluted AreaHaldia14No critically polluted area within 10 km
(5.)ESAsNone10No ESA within 10 km
(6.)Wildlife CorridorsNone10No wildlife corridors within 10 km
(7.)CorridorsNone10No corridors within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone10No archaeological sites within 10 km
(2.)Defence InstallationsNone10No major defense installations within 10 km
(3.)ForestNone10No forest areas within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 15
(b)Land yet to be acquired(Ha) 4.6
(c)Status of Land acquisition if not acquired Negotiations underway
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 3 schedule I species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 7.25 lakhs
(iii)Period of Implementation 5 years during operation phase
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hooghly River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 170
(d)Temporary Employment- During Operation 40
(e)No. of working days 365
(f)Total Manpower 260
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.50
(b)Percentage of Total Project Area 33.16
(c)No. of Plants to be Planted 10400
(d)Funds Allocated for Plantation 15
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalLNG being a cleaner fuel, lower carbon footprint on substitution of liquid fuels Natural gas, being a cleaner fuel, will replace HFO, DO, Naphtha and Diesel requirements as a fuel source in the future
(2.)FinancialCheaper and cleaner source of energy will lead growth and revival of gas based industries There is a possibility that the gas would be exported to Bangladesh thereby, increasing bilateral trade
(3.)SocialThe Proposed LNG storage and regasification terminal development will generate employment for roughly 50 – 200 people directly and 300-400 people indirectly Helps in CGD networks in major towns and cities, mainly benefitting vehicular transport & households Industries dependent on Natural Gas will be developed significantly in the eastern India generating additional employment in the future
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1618/RA 0055
(ii)Name of the EIA Consultant ERM India Private Limited
(iii)Address Building 10, Tower A, 4th Floor, DLF Cyber City Gurgaon 122002
(iv)Mobile No. 981006161
(v)Landline No. 0124417030
(vi)Email Id subir.gupta@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, Pls find attached the reponse to queries raised in EAC meeting on 8th May 2019. Regards 10 Jun 2019
2.NA

Deferred

17 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAbhirup Bhattacharya
DesignationDirector
Name of Company (Applicant Name should not be given here)BENGAL CONCESSIONS PRIVATE LIMITED
Address514, Dalamal Towers, 211, FPJ Marg, Nariman point, Mumbai, India
Print