Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of Energy Efficient Seven (7)-Effect Multiple Effect Falling Film evaporators and New Energy Efficient Recovery boiler (600 BD-TPD black liquor solids firing capacity) without increasing
(b)Name of the Company / Organisation ORIENT PAPER MILLS
(c)Registered Address PO, Amlai Paper Mills, District Shadhol, Madhya Pradesh,,Shahdol,Madhya Pradesh-484117
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajay Gupta
(b)Designation (Owner/ Partner/ CEO) Chief Executive Officer
(c)Address PO, amlai Paper Mills, district Shadhol, Madhya Pradesh,,,Shahdol,Madhya Pradesh-484117
(d)Pin code 484117
(e)E-mail unit-amlai@orientpaperindia.com
(f)STD Code. 7652(f)Telephone No. 286273
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(i) Pulp & paper industry excluding manufacturing of paper from waste
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/IND/98866/2019
(d)Master Proposal Number(Single Window) SW/98865/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Jhagraha Village- 1370,1372, 1373, 1374, 1375, 137
(b)Pincode 484117
(c)Bounded Latitudes (North)
From
Degree 23.188036
Minutes
Second
From
Degree 23.199251
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.589983
Minutes
Second
From
Degree 81.596057
Minutes
Second
(e)Survey of India Topo Sheet No. 66-E/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaAdilabadTamsiKorata
(2.)MaharashtraYavatmalKelapurChannaka
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-210/2008 (ENV)/1259
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 14 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)In house pulp mill capacity26510275OthersBD-TPDOthersCaptive
(2.)Chemical Recovery Boiler4806001080OthersBD-TPDOthersCaptive
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)New energy efficient recovery boiler480 BD tpd600 BD tpd600 BD tpdExisting old recovery boiler will be kept as standby
(2.)In house pulp mill capacity265 BD tpd10 BD tpd275 BD tpdNo increase in overall annual pulp production beyond permitted level of 90,000 BD TPA as per EC-2019
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 14 May 2018
(iv)Valid Upto 30 Apr 2019
(v)File No. AW-48319
(vi)Application No. 673378
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 185
(b) Funds Allocated for Environment Management (Capital) (in Crores) 12
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.28
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Wood0Tons per AnnumCaptive and Farm ForestryOthersCaptive0 OthersSocial and farm forestryCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.75 To 3.03
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 17.86 To 1.66
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNo additional water requirement00Copy of Permission LetterPipelineIntake WellAgreement for supply of water to OPM09 Sep 201036000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Paper & Pulp Mill facility954520500Biological TreatmentOthersLand Irrigation3509195
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9545
(b)Total Discharged Water (Kilolitre per Day) 9195
(c)Total Reused Water (Kilolitre per Day) 350
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Lime mudIndustrial Waste0Tons0RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube42.8910.8243.7280
(2.)PM2.5Microgram per Meter Cube5410.4654.560
(3.)PM10Microgram per Meter Cube93.510.7194.25100
(4.)SO2Microgram per Meter Cube15.2911.1516.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed new chemical recovery boilerBlack Liquor Solids453SO27
(2.)Proposed new chemical recovery boilerBlack Liquor Solids453PM109
(3.)Proposed new chemical recovery boilerBlack Liquor Solids453NOx3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 180
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) None
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 598.59
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 598.59
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 598.59
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : None 0
    Total (ha.) 598.59
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0No additional land requirement
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)CorridorsNA0NA
(4.)Critically Polluted AreaNA0NA
(5.)NPANA0NA
(6.)Wildlife CorridorsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBurhar, Maikal and Mauhari8-
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 598.59
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Entire land is already acquired. No additional lan
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sone River- 2.3 km East
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Semra Dam
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2560256
(2.)Percentage of Total Project Area43043
(3.)No. of Plants5000000500000
(4.)Funds Allocated50050
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAchieving thermal energy neutral in pulp mill, reduction of coal consumption
(2.)SocialAdditional CER Budget of Rs 1.28 Crores
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA 076
(ii)Name of the EIA Consultant Cholamandalam MS Risk Services Limited
(iii)Address Parry House, 3rd Floor, No.2, NSC Bose Road, Chennai, Tamil Nadu, 600001
(iv)Mobile No. 9677003778
(v)Landline No. 0443044568
(vi)Email Id bhaskarVS@cholams.murugappa.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjay Gupta
DesignationChief Executive Officer
Name of Company (Applicant Name should not be given here)ORIENT PAPER MILLS
AddressPO, Amlai Paper Mills, District Shadhol, Madhya Pradesh
Print