1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Gularia Chini Mills Unit-Distillery | (b)Name of the Company / Organisation | M/S GULARIA CHINI MILLS | (c)Registered Address | M/s Gularia Chini Mills
Village Nausar Gularia, Block Bijua, Tehsil-Gola, District Lakhimpur Kheri,,Lakhimpur Kheri,Uttar Pradesh-262901 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NKAGARWAL Agarwal | (b)Designation (Owner/ Partner/ CEO) | EXECUTIVEPRESIDENT | (c)Address | Village Nausar Gularia, Block Bijua, Tehsil Gola, District Lakhimpur Kheri Uttar Pradesh,,Mohammadi,Lakhimpur Kheri,Uttar Pradesh-262901 | (d)Pin code | 262901 | (e)E-mail | chinimillgularia@gmail.com | (f)STD Code. | 522(f)Telephone No. | 212223 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UP/IND2/75830/2018 | (d)Master Proposal Number(Single Window) | SW/98513/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | (Khasra no. 265, 264, 272, 267, 274, 266, 269, 270 | (b)Pincode | 262901 | (c)Bounded Latitudes (North) | | From | | Degree | 28.13.41 | Minutes | | Second | | From | | Degree | 28.13.47 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80.38.08 | Minutes | | Second | | From | | Degree | 80.38.24 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 62D/11,62D/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 89 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Adilabad | Tamsi | Korata | (2.) | Maharashtra | Yavatmal | Kelapur | Channaka | (3.) | Manipur | Bishnupur | Nambol Sub-Division | Laikot | (4.) | Manipur | Imphal East | Sawombung Sub-Division | Laikot | (5.) | Manipur | Ukhrul | Ukhrul Central Sub-Division | Zalengbung to Hatha | (6.) | Manipur | Ukhrul | Phungyar Phaisat Sub-Division | Thawai and Leingangching | (7.) | Uttar Pradesh | Lakhimpur Kheri | Mohammdi | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/236/2018-IA-II(I) | (b)Date of Apply of TOR | 22 Jul 2018 | (c)Date of Issue of TOR / Standard ToR | 24 Aug 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.1 |
| Inside proposed project site | State : | Uttar Pradesh | District : | Lakhimpur Kheri | Tehsil : | Mohammadi | Village : | rudrapur gularia |
| 186 | Issues regarding employment, social responsibilities, control of waste water
generation, ground water abstraction, air pollution control measures, rain water
harvesting, ash disposal, were raised | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Molasses based distillery | 160 KLD | RS/ENA/Ethanol | (2.) | Co-generation power plant | 8.0 MW | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Co-generation power plant | 8.0 | Mega Watt(MW) | | Others | electric transmission line | (2.) | Molasses based distillery | 160 | Kilo Litre per Day | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Mar 2019 | (iv)Valid Upto | 01 Mar 2019 | (v)File No. | na | (vi)Application No. | after grant of EC unit will apply for CTE and CTO | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 208.742 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 110 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 3.13 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 720 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 720 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Molasses | 259200 | Others | ton/annum | from adjacent own sugar unit | Road | | 0.4 | Captive | | Copy of Linkage | (2.) | Bagasse as fuel for co generation power plant | 91800 | Others | ton/annum | from adjacent own sugar unit | Road | | 0.4 | Others | from adjacent own sugar unit | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Sep 2018 To 15 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 16.8 | 9.8 | 14.4 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 58.2 | 29.4 | 58.1 | 60 | (3.) | PM10 | | Micro Gram per Meter Cube | 88.8 | 47.6 | 87.5 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 26.4 | 15.2 | 22.1 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | pH | 7.6 | 7.3 | 8.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 344 | 220 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 0.42 | 0.17 | 1.0 | 1.5 | (4.) | Heavy Metals | | Iron | mg/l | | 0.24 | 0.11 | 0.16 | 0.3 | (5.) | TDS | | | mg/l | | 753.4 | 437.4 | 500 | 2000 | (6.) | TSS | | | mg/l | | . | . | .. | . | (7.) | Chlorides | | | mg/l | | 80.08 | 14.11 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 26.6 | 16.2 | B | (2.) | COD | | mg/l | | 82.2 | 64 | B | (3.) | pH | | Others | pH | 7.7 | 7.5 | B | (4.) | DO | | mg/l | | 4.9 | 4.7 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.8 | 50 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.7 | 44 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | pH | 7.8 | 7.6 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 28.76 | 23.24 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 140.2 | 109.9 | (4.) | K(Potassium) | Milligram per Kilogram | | 89.3 | 55.2 | (5.) | Electric Conductivity | Others | micro siemens/Cm | 308 | 250 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3.0 To 5.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.0 To 3.0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 980 | 0.1 | Copy of Permission Letter | modeOthers | GROUND WATER | Tube Well | | 21-4/6727/UP/IND/2019 | 01 Mar 2019 | 980 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | SPENT WASH | 800 | 1000 | SPENT WASH SHALL BE CONCENTRATED IN MEE | Others | CONC. SPENTWASH SHALL BE USED AS FUEL IN BOILER | 800 | 0 | (2.) | CONDENSATES | 1100 | 1200 | CONDENSATE POLISHING UNIT | Others | 100%RECYCLING WILL BE DONE | 1100 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1900 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1900 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | FERMENTER SLUDGE | Industrial Waste | | 5760 | Tons | 1 | Road | | Co-Processing | | (2.) | ASH | Bottom Ash | | 21610.8 | Tons | 1 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 88.8 | 0.605 | 1.53 | 90.4 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 16.8 | 0.520 | 4.62 | 21.45 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | . | . | . | . | . | (4.) | NOx | | Microgram per Meter Cube | . | . | . | . | . | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | SLOP FIRED BOILER 60 TPH | SLOP + BAGASSE | 72 | 2.5 | PM10 | | 1.53 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4500 | (b)Source | UNIT SHALL INSTALL OWN CO-GENERATION POWER PLANT | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | . | (e)Stack Height (in m) | . | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 8.747 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 8.747 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 229300 | (b)Waste/Barren Land (ha.) | 16000 | (c)Grazing/ Community Land (ha.) | 2198 | (d)Surface Water Bodies (ha.) | 5300 | (e)Settlements (ha.) | 26815 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 34410 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 314023 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | COMPLETE PLANT | 8.747 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NO WLS OBSERVED IN STUDY AREA | (2.) | ESAs | NA | 0 | NO ESA OBSERVED IN STUDY AREA | (3.) | Corridors | NA | 0 | NO Corridor OBSERVED IN STUDY AREA | (4.) | ESZs | NA | 0 | NO ESZ OBSERVED IN STUDY AREA | (5.) | Critically Polluted Area | NA | 0 | NO CPA OBSERVED IN STUDY AREA | (6.) | Wildlife Corridors | NA | 0 | NO Corridor OBSERVED IN STUDY AREA | (7.) | NPA | NA | 0 | NO NPA OBSERVED IN STUDY AREA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | FOREST | Rayapur Reserved Forest | 1.93 | South Direction | (2.) | Defence Installations | | NA | . | NO ANY DEFENSE AREA OBSERVED IN STUDY AREA | (3.) | Forest | | Chhairasi Reserved Forest | 13.2 | South West Direction | (4.) | Archaeological Sites | | NA | . | NO ANY ARCHAEOLOGICAL SITES OBSERVED IN STUDY AREA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 8.747 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | LAND ACQUIRED AND LAND CONVERSION HAS BEEN DONE | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 30 | (b)Permanent Employment-During Operation | 60 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 40 | (e)No. of working days | 360 | (f)Total Manpower | 160 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 2.888 | (b)Percentage of Total Project Area | 33.02 | (c)No. of Plants to be Planted | 2000 | (d)Funds Allocated for Plantation | 1500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The proposed CER Cost is
Rs. 4.17484 Lakhs
(2% of capital investment), as per office memorandum no. F.No.
22-65/2017-IA.III dated 1st May 2018 as project is green field
(New distillery project). | (2.) | Environmental | unit shall work on 4 r principle: reduction, reuse, recycling and recovery | (3.) | Financial | The industry shall create direct/indirect employment due to upcoming project | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA056 | (ii)Name of the EIA Consultant | Ascenso Enviro Private Limited | (iii)Address | Ascenso Enviro Private Limited D-79, Second Floor Sector-6, Noida Uttar Pradesh-201301 | (iv)Mobile No. | 9454721732 | (v)Landline No. | 011232323 | (vi)Email Id | anshumaan110@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 03 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Whether the proposed industrial operations (molasses/grain based distillery) are in conformity with permitted land use of the area. That needs to be confirmed along with supporting documents.
- As per the ToR, distillery is to be operated on dual feed stock (molasses and grain), whereas, the proposal for EC shows a different picture. As such, the proposal is not in compliance with the ToR issued for the project.
- Adequate availability of raw materials (molasses and grain) to run the distillery @160 KLD. | 24 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 27 Mar 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We have re-modelled and estimated the incremental concentrations as per direction.. | 07 Jun 2019 | 2. | NA | Deferred | 17 May 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | NKAGARWAL Agarwal | Designation | EXECUTIVEPRESIDENT | Name of Company (Applicant Name should not be given here) | M/S GULARIA CHINI MILLS | Address | M/s Gularia Chini Mills
Village Nausar Gularia, Block Bijua, Tehsil-Gola, District Lakhimpur Kheri |
|