Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of New Civil Enclave at Kanpur Air Force Base, Uttar Pradesh
(b)Name of the Company / Organisation AIRPORTS AUTHORITY OF INDIA KANPUR
(c)Registered Address Civil Aerodrome, Kanpur Cantonment, Kanpur,,Kanpur Nagar,Uttar Pradesh-208004
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jameel Khaliq
(b)Designation (Owner/ Partner/ CEO) AirportDirector
(c)Address Civil Aerodrome, Kanpur Cantonment, Kanpur - 208004,,Kanpur,Kanpur Nagar,Uttar Pradesh-208004
(d)Pin code 208004
(e)E-mail kanpurairport@gmail.com
(f)STD Code. 512(f)Telephone No. 2383553
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/MIS/81283/2018
(d)Master Proposal Number(Single Window) SW/98509/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Govt land
(b)Pincode 208004
(c)Bounded Latitudes (North)
From
Degree 26.396966
Minutes
Second
From
Degree 26.402487
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.424539
Minutes
Second
From
Degree 80.431703
Minutes
Second
(e)Survey of India Topo Sheet No. 63B11,63B7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 125
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshKanpur NagarKanpur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-74/2018-IA-III
(c)Date of Apply of TOR 04 Oct 2018
(d)Date of Issue of TOR / Standard ToR 30 Nov 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Project site
State :Uttar Pradesh
District :Kanpur Nagar
Tehsil :Kanpur
Village :Mawaiya
59Employment opportunities to local, Solid waste management, storm water drainsOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Nil0
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Airport with terminal building, taxiway, apron, parking area20.23OthershaOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Dec 2018
(iv)Valid Upto 31 Dec 2020
(v)File No. 42002/UPPCB/Kanpur Nagar(UPPCBRO)/CTO/air/KANPUR N
(vi)Application No. 3886751
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 168
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.56
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.29
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000OthersNA0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 30 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube121.452.7115.1100
(2.)PM2.5Micro Gram per Meter Cube75.632.071.760
(3.)SO2Micro Gram per Meter Cube15.75.215.180
(4.)NOxMicro Gram per Meter Cube28.910.126.680
(5.)OthersCOMili Gram per Meter Cube1.00.20.92
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsZincmg/l0.80.21515
(2.)pHNA7.447.186.58.5
(3.)TDSmg/l8264765002000
(4.)Total Hardnessmg/l492264200600
(5.)Fluoridemg/l0.770.281.01.5
(6.)TSSmg/l0000
(7.)Chloridesmg/l182612501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.25.7C
(2.)BODmg/l3.32.0C
(3.)pHNA7.947.25C
(4.)CODmg/l2616C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.453.655
(2.)Leq(Night)A-weighted decibels(dB(A))56.341.945
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare411254
(2.)pH8.397.2
(3.)P(Phosphorus)Kilogram per hectare66.151.5
(4.)N(Nitrogen)Kilogram per hectare514284
(5.)Electric ConductivityMillisiemens per Centimetre0.5210.195
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.2 To 27.13
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.08 To 27.13
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1190Copy of Permission LettermodeOthersNATube Well21-4/6893/UP/INF/201928 Feb 2019119
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic107125MBBRGreen Belt Renewal Plant107
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 107
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 107
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste133.225Tons10RoadAuthorized Recyclers
(2.)STP SludgeOthersNon Hazardous7.3Tons10OthersTrucksOthersManure in Landscaping
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Kilolitre15RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube28.90.53.532.580
(2.)PM10Microgram per Meter Cube121.40.50.55121.96100
(3.)SO2Microgram per Meter Cube15.70.54.220.080
(4.)PM2.5Microgram per Meter Cube75.60.50.5576.1660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (2 x 500 KVA)Diesel100.15NOx0.1
(2.)DG Set (2 x 500 KVA)Diesel100.15PM100.015
(3.)DG Set (2 x 500 KVA)Diesel100.15SO20.12
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 720
(b)Source State Electricity Supply
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 20.234
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 20.234
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 20.2343
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 20.2343
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt7.97
(2.)Built Up Area1.13
(3.)OthersParking, road, apron and open area11.1343
Total (ha.) 20.2343
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0-
(2.)NPANil0-
(3.)CorridorsNil0-
(4.)WLSNil0-
(5.)ESAsNil0-
(6.)ESZsNil0-
(7.)Wildlife CorridorsNil0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0-
(2.)ForestNil0-
(3.)Defence InstallationsKanpur Air Force Base0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.2343
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 60
(e)No. of working days 365
(f)Total Manpower 255
32.
Green Belt in Ha:
(a)Total Area of Green Belt 7.9713
(b)Percentage of Total Project Area 39.40
(c)No. of Plants to be Planted 2050
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10.8
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 202343
(e)Total built up area (sqm) 6040
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 24
(d)Capacity 28
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 150
5.
Energy Saving Measures:
(a)Source/Mode Compliance of “Energy Conservation Building Code"
(b)Percentage 30
(c)Quantity 240
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0048
(ii)Name of the EIA Consultant ABC Techno Labs India Private Limited
(iii)Address ABC Tower, No. 400, 13th Street, SIDCO Industrial Estate - North Phase, Ambattur, Chennai - 600098
(iv)Mobile No. 9566067777
(v)Landline No. 0442625778
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 19 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply for the points raised during 40th EAC meeting (Infra-2) is attached. 12 Jul 2019
2.NA

Kindly see the minutes of 40th meeting of EAC (Infra-2).

01 May 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJameel Khaliq
DesignationAirportDirector
Name of Company (Applicant Name should not be given here)AIRPORTS AUTHORITY OF INDIA KANPUR
AddressCivil Aerodrome, Kanpur Cantonment, Kanpur