1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion from 2x100 TPD DRI Kiln to 5x100 TPD DRI Kiln, 20 MW CPP, 2x9 MVA SAF, 1x250 TPD I/O sinter plant & 1x40 TPH I/O washery | (b)Name of the Company / Organisation | MAITHAN STEEL AND POWER LTD | (c)Registered Address | 9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata,,Barddhaman,West Bengal-700017 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Madhur Agarwalla | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | 9, AJC Bose Road, Ideal Centre, 6th Floor, Kolkata,,Kanksa,Barddhaman,West Bengal-700017 | (d)Pin code | 700017 | (e)E-mail | madhur@maithangroup.com | (f)STD Code. | 33(f)Telephone No. | 39877200 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/70780/2017 | (d)Master Proposal Number(Single Window) | SW/98424/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 2982,2860,3015,2995,2985,2989,2854,2976 | (b)Pincode | 723121 | (c)Bounded Latitudes (North) | | From | | Degree | 233754.03 | Minutes | | Second | | From | | Degree | 233757.05 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 865006.13 | Minutes | | Second | | From | | Degree | 865008.14 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45C14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 117 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.6 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Purulia | | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | NIL | (b)Date of Apply of TOR | NIL | (c)Date of Issue of TOR / Standard ToR | NIL | (d)Previous TOR Letter | NIL | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 11 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| Sampriti bhawan, Sarbari More | State : | West Bengal | District : | Purulia | Tehsil : | Raghunathpur | Village : | Bonra |
| 70 | Concern on source of water for the project, Environment Management Plan, Enquired about local development and abatement of pollution , health consciousness program, employment opportunities , plantati | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | DRI Kiln | 5x100 TPD | | (2.) | CPP | 20 MW | WHRB-10 MW, FBC-10 MW | (3.) | I/O Washery | 1x40 TPH | | (4.) | SAF | 2x9 MVA | | (5.) | I/O Sinter | 1x250 TPD | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Fe-Mn | 9500 | Tons per Annum | | Road | | (2.) | Fe-Si | 3500 | Tons per Annum | | Road | | (3.) | Pig Iron | 10000 | Tons per Annum | | Road | | (4.) | Iron Ore Concentrate | 160000 | Tons per Annum | | Conveyor Belt | | (5.) | Sponge Iron | 160000 | Tons per Annum | | Road,Rail | | (6.) | Si-Mn | 7000 | Tons per Annum | | Road | | (7.) | Sinter | 80000 | Tons per Annum | | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Aug 2018 | (iv)Valid Upto | 31 Aug 2023 | (v)File No. | CO110150 | (vi)Application No. | CO110150 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 165 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 6.6 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.49 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 820504 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 820504 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coal | 198157 | Tons per Annum | | South Africa | Rail | | 750 | Linkage | | Copy of Linkage | (2.) | Iron ore | 510000 | Tons per Annum | | Barbil | Rail | | 250 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 23.5 | 11.1 | 22.1 | 80 | (2.) | Others | CO | Micro Gram per Meter Cube | 530 | 313 | 498 | 2000 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 51.1 | 30.3 | 48.8 | 60 | (4.) | PM10 | | Micro Gram per Meter Cube | 89.7 | 65.1 | 89.3 | 100 | (5.) | NOx | | Micro Gram per Meter Cube | 28.4 | 14.1 | 26.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.5 | 7.1 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 401 | 319 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 128 | 96 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 50 | 42 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.36 | 0.26 | 1 | 1.5 | (6.) | Heavy Metals | | Fe | mg/l | | 0.13 | 0.06 | 0.3 | 0.3 | (7.) | TSS | | | mg/l | | 16 | 6 | 0 | 0 | (8.) | Others | Sulphate | | mg/l | | 21 | 15 | 200 | 400 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 7.2 | 4.8 | C | (2.) | Others | Chloride | mg/l | | 52.3 | 42.1 | C | (3.) | COD | | mg/l | | 50 | 30 | C | (4.) | pH | | NA | | 7.8 | 7.2 | C | (5.) | DO | | mg/l | | 6.6 | 4.6 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.4 | 50.7 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.4 | 39.1 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Percent | | 0.025 | 0.016 | (2.) | P(Phosphorus) | Percent | | 0.019 | 0.013 | (3.) | K(Potassium) | Percent | | 0.021 | 0.012 | (4.) | pH | | | 7.9 | 7.2 | (5.) | Electric Conductivity | Others | millimho/cm | 330 | 294 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.5 To 4.9 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.8 To 2.3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1800 | 3.7 | Copy of Permission Letter | Pipeline | | Intake Well | | MSPL/U2/SMS/17-18/289 | 03 Apr 2018 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 340 | 340 | ETP | Reuse within the Plant & Recycling | | 340 | | (2.) | Domestic | 70 | 70 | STP | Green Belt Renewal Plant | | 70 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 410 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 410 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dolchar | Industrial Waste | | 25650 | Tons | 0 | Conveyor Belt | | Co-Processing | | (2.) | Pig Iron Slag | Industrial Waste | | 16000 | Tons | 5.33 | Road | | Authorized Recyclers | | (3.) | Washery rejects | Industrial Waste | | 80000 | Tons | 2.6 | Road | | Others | SOld to brick plant | (4.) | ESP Dust | Industrial Waste | | 15000 | Tons | 0 | Road | | Sanitary Landfills | | (5.) | CPP ash | Fly Ash | | 29000 | Tons | 2.6 | Road | | Authorized Recyclers | | (6.) | CPP Bed ash | Bottom Ash | | 4100 | Tons | 2.6 | Road | | Authorized Recyclers | | (7.) | Si-Mn Slag | Industrial Waste | | 7700 | Tons | 5.33 | Road | | Authorized Recyclers | | (8.) | Fe-Mn Slag | Industrial Waste | | 12700 | Tons | 0 | Conveyor Belt | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 48.8 | 6.2 | 2.05 | 50.85 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 22.1 | 8.92 | 4.7 | 26.81 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 89.3 | 6.2 | 3.62 | 92.93 | 100 | (4.) | NOx | | Microgram per Meter Cube | 26.7 | 8.92 | 4.18 | 30.9 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DRI Cooler 4 & 5 | --- | 35 | 0.5 | PM10 | | 14.6 g/s | (2.) | DRI Kiln 4 & 5 | Coal | 30 | 1.4 | PM10 | | 1.23 g/s | (3.) | SAF 2x9 MVA | Electricity | 30 | 1.6 | PM10 | | 2.8 g/s | (4.) | Sinter Plant | Coal | 32 | 1.0 | PM10 | | 0.15 g/s | (5.) | Sinter Plant | Coal | 32 | 1 | SO2 | | 3.6 g/s | (6.) | DRi Kiln 4 & 5 | Coal | 30 | 1.4 | SO2 | | 6.26 g/s | (7.) | DRI Kiln-3 | Coal | 30 | 1.8 | PM10 | | 0.6 g/s | (8.) | DRI Kiln-3 | Coal | 30 | 1.8 | SO2 | | 3.13 g/s | (9.) | AFBC 10 MW | Coal | 46 | 2.4 | PM10 | | 2.26 g/s | (10.) | Sinter | Coal | 32 | 1 | NOx | | 2.4 g/s | (11.) | DRI Cooler 3 | - | 30 | 0.4 | PM10 | | 7.3 g/s | (12.) | AFBC 10 MW | Coal | 46 | 2.4 | SO2 | | 13.9 g/s | (13.) | AFBC 10 MW | Coal | 46 | 2.4 | NOx | | 20.56 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20 | (b)Source | Own CPP generation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1800 KVA | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 11.9 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 11.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17431 | (b)Waste/Barren Land (ha.) | 3023 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 3319 | (e)Settlements (ha.) | 3986 | (f)Industrial (ha.) | 1107 | (g)Forest (ha.) | 3453 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mining , Road, Infrastructure | 598 | Total (ha.) | 32917 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 7.21 | | (2.) | Water Reservoir | | 0.76 | | (3.) | Green belt | | 3.93 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | Not found | 0 | Not Applicable | (2.) | Critically Polluted Area | Not found | 0 | Not Applicable | (3.) | NPA | Not found | 0 | Not Applicable | (4.) | ESAs | Not found | 0 | Not Applicable | (5.) | Wildlife Corridors | Not found | 0 | Not Applicable | (6.) | WLS | Not found | 0 | Not Applicable | (7.) | ESZs | Not found | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Not found | 0 | Not Applicable | (2.) | Defence Installations | | Not found | 0 | Not Applicable | (3.) | Forest | | Panchet RF | 5.15 | Reserve forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 11.9 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Damodar | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 85 | (b)Permanent Employment-During Operation | 80 | (c)Temporary Employment- During Construction | 120 | (d)Temporary Employment- During Operation | 165 | (e)No. of working days | 320 | (f)Total Manpower | 450 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 3.93 | (b)Percentage of Total Project Area | 33.03 | (c)No. of Plants to be Planted | 5224 | (d)Funds Allocated for Plantation | 766010 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment generation, Social upliftment | (2.) | Environmental | Afforestation | (3.) | Financial | Revenue Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 77 | (ii)Name of the EIA Consultant | Global Tech Enviro Experts Pvt Ltd | (iii)Address | C - 23, B J B NAGAR Bhubaneswar | (iv)Mobile No. | 9437033487 | (v)Landline No. | 0674243685 | (vi)Email Id | global1experts@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 23 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Details regarding compliance to the specific ToR conditions has not been included in the EIA report. It is requested to revise the EIA/EMP report by incorporating the compliance to the specific ToR points along with the requisite supporting documents. | 08 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 08 Mar 2019 | 3. | NA | Certified compliance report to the CTO conditions by the Regional Office of SPCB has not been submitted as against compliance to specific ToR no.iv. It is requested to submit the same. | 08 Mar 2019 | 4. | NA | The correction have been made as per the instruction received | 09 Mar 2019 | 5. | NA | Certified compliance report to the CTO conditions by the Regional Office of SPCB has not been submitted as against compliance to specific ToR no.iv. It is requested to submit the same. It may be noted that repeatedly you are submitting the same report wherein certified compliance report to the CTO conditions by WBPCB is not there. It is to inform that without the requisite report from WBPCB your proposal cannot be considered by the Ministry. | 11 Mar 2019 | 6. | NA | The correction have been made as per the instruction received | 02 Jan 2020 | 7. | NA | Proposal is returned due to the folLowing shortcomings:
Form 2:
S.No.2: Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency has not been submitted.
S.No. 7.1: Complete PH proceedings inter-alia including written representations have not been furnished.
S.No.9: Certified compliance report existing CTO conditions from the Regional Office of SPCB has not been furnished.
S.No. 15: Permission obtained from the Competent Authority for the drawl of 1900 KLD shall be submitted.
EIA report:
i. Compliance to the ToR conditions are not given in the EIA report.
ii. Consolidated water balance diagram for the existing and proposed expansion shall be furnished.
iii. Satellite image of the land cover/land use map of the study area has not been furnished.
iv. Material balance and Energy balance has not been furnished. | 08 Jan 2020 | 8. | NA | The correction have been made as per the instruction received | 09 Jan 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS raised for M/s.Maithan Steel & Power Ltd, P.o-Bonra, PS-Neturia, Purulia,WB in 16th meeting held on 24-25th February,2020 is complied pointwise herewith. | 14 May 2021 | 2. | NA | NIL
| 13 Mar 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Madhur Agarwalla | Designation | Director | Name of Company (Applicant Name should not be given here) | MAITHAN STEEL AND POWER LTD | Address | 9, AJC Bose Road, Ideal Centre, 6th floor, Kolkata |
|