Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Molasses based distillery from 120 KLPD to 140 KLPD by modernization and efficiency improvement along with installation of incineration boiler and incidental 6.5 MW Co-generation Power Pl
(b)Name of the Company / Organisation DALMIA BHARAT SUGAR AND INDUSTRIES LIMITED
(c)Registered Address 11th & 12th Floors, Hansalaya Building, 15,Barakhamba Road, New Delhi,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pradeep Mittal
(b)Designation (Owner/ Partner/ CEO) AssistantExecutiveDirector
(c)Address 11th 12th Floors, Hansalaya Building, 15, Barakhamba Road, New Delhi,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail pradeep.mittalabr@gmail.com
(f)STD Code. 11(f)Telephone No. 23465100
(g)Fax No. 01123313303
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/IND2/98239/2019
(d)Master Proposal Number(Single Window) SW/98238/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1219, 1220, 1221, 1222, 1223, 1224, 1232, 1233, 12
(b)Pincode 261001
(c)Bounded Latitudes (North)
From
Degree 27.51916667
Minutes
Second
From
Degree 27.52472222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 80.55777778
Minutes
Second
From
Degree 80.56500000
Minutes
Second
(e)Survey of India Topo Sheet No. 63A11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 138
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaErnakulamParavurVarious Villages
(2.)KeralaErnakulamKochiVarious Villages
(3.)KeralaErnakulamKanayannurVarious Villages
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. file no IV/ENV/UP/IND-94/264/2008/667
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 13 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol / ENA /RS12020140Kilo Litre per Day(KLD)Road
(2.)Power06.56.5Mega Watt(MW)OthersThrough Cables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Molasses Based Distillery120 KLPD0140 KLPDExpansion by modernization and efficiency improvement within existing configuration
(2.)Co-generation Power Plant06.5 MW6.5 MWinstallation of incineration boiler and incidental 6.5 MW Co-generation Power Plant
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Dec 2017
(iv)Valid Upto 31 Dec 2019
(v)File No. 136/UPPCB/Lucknow(UPPCBRO)/CTO/air/Sitapur/2017
(vi)Application No. 58360
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 80
(b) Funds Allocated for Environment Management (Capital) (in Crores) 80
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.8
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 248200
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 248200
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses248200Tons per AnnumOwn & Nearby Sugar millsRoad200 OthersOwn & Nearby Sugar millsCopy of Linkage
(2.)Bagasse as fuel for co generation power plant63875Tons per AnnumAdjacent own Sugar MillConveyor Belt0.5 OthersAdjacent own Sugar MillCopy of Linkage
(3.)Conc Spent wash as fuel for co generation power plant182500Tons per AnnumOwn PlantOthersPipelines0 OthersOwn PlantCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 9.39
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.05 To 9.13
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater12210Copy of Permission LetterPipelineTube Wellletter no. 21-4(44)/NR/CGWA/2006-198304 Dec 20172850
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial waste water treated in CPU12521500anaerobic , aerobic, dual media filter+UF + RO and UVReuse within the Plant & Recycling1252
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1252
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1252
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly AshFly Ash36500Tons100RoadOthersIn house brick manufacturing or manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.261078.59100
(2.)SO2Microgram per Meter Cube18.211021.9180
(3.)PM2.5Microgram per Meter Cube53.141053.3560
(4.)NOxMicrogram per Meter Cube21.061025.86100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Incineration BoilerConc spent wash and Bagasse/Coal/Rice Husk801.5PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3250
(b)Source 6.5 MW Co-generation Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000 KVA
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 20.23
    Total Land (ha.) 20.23
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 20.23
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Expansion within Plant 0
    Total (ha.) 20.23
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.05
(2.)OthersBio-composting9.5
(3.)Green belt6.68
Total (ha.) 20.23
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(2.)ESAsNot Applicable0No ESAs within 10 km radius
(3.)ESZsNot Applicable0No ESZs within 10 km radius
(4.)CorridorsNot Applicable0No Corridors within 10 km radius
(5.)WLSNot Applicable0No WLS within 10 km radius
(6.)NPANot Applicable0No NPA within 10 km radius
(7.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0No Defence installation within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)ForestProtected Forests2.2Two Reserved Forests (RF) and seven Protected Forests (PF) within 10 km radius area from the plant site.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 20.123
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Saunri Nadi
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 69
(c)Temporary Employment- During Construction 120
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 204
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt6.6806.68
(2.)Percentage of Total Project Area33033
(3.)No. of Plants10425350013925
(4.)Funds Allocated10000000300000013000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialUpliftment of the nearby villagers through CSR
(2.)FinancialRevenue generation for State and Centre ex-chequer
(3.)EnvironmentalContribution in GOI Ethanol blending program. Hence reducing carbon foot print .Reduction in crude import.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe proposal may be first examined for applicability of the Ministry's Notification dated 23/11/2016 to arrive at the requirement of EC and/or amendment in the existing EC. 23 Mar 2019
2.NAThe correction have been made as per the instruction received 09 Apr 2019
3.NAPlease see our observations dated 23/3/2019 for the needful. 13 Apr 2019
4.NAThe correction have been made as per the instruction received 24 Apr 2019
5.NAThe proposal may be discussed with us in the Ministry to take it forward. 03 May 2019
6.NAThe correction have been made as per the instruction received 13 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPradeep Mittal
DesignationAssistantExecutiveDirector
Name of Company (Applicant Name should not be given here)DALMIA BHARAT SUGAR AND INDUSTRIES LIMITED
Address11th & 12th Floors, Hansalaya Building, 15,Barakhamba Road, New Delhi
Print