Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Outer Harbour, Inner Harbour including Western Dock &Mechanization of existing Operational Berths at Paradip Port, Odisha.
(b)Name of the Company / Organisation PARADIP PORT TRUST
(c)Registered Address ADMINISTRATIVE BUILDING PARADIP PORT TRUST PARADIP,,Jagatsinghapur,Orissa-754142
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant KOTHAPALLI RAMACHANDRA RAO
(b)Designation (Owner/ Partner/ CEO) CHIEF ENGINEER
(c)Address ENGINEERING DEPARTMENT ADMINISTRATIVE BUILDING PARADIP PORT TRUST PARADIP,,Kujang,Jagatsinghapur,Orissa-754142
(d)Pin code 754142
(e)E-mail ce@paradipport.gov.in
(f)STD Code. 6722(f)Telephone No. 222026
(g)Fax No. 06722222351
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIS/70593/2017
(d)Master Proposal Number(Single Window) SW/98165/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. ---
(b)Pincode 754142
(c)Bounded Latitudes (North)
From
Degree 2239443.7078
Minutes
Second
From
Degree 2240003.8381
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 463822.0605
Minutes
Second
From
Degree 466719.9395
Minutes
Second
(e)Survey of India Topo Sheet No. F45U11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1.70
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaJagatsinghapurKujang
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-62/2017-IA-III
(c)Date of Apply of TOR 27 Oct 2017
(d)Date of Issue of TOR / Standard ToR 30 Jan 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :1.5
MUNCIPALITY KALYAN MANDAP PARADEEP
State :Orissa
District :Jagatsinghapur
Tehsil :Kujang
Village :SANDHAKUDA
250Local employment, health, education related issues raised mainly with emphasis on spending of more CSR funds on these matters.OthersAdditional District Magistrate
(2.)
Date of Advertisement :26 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :1.5
MUNCIPALITY KALYAN MANDAP PARADEEP
State :Orissa
District :Jagatsinghapur
Tehsil :Kujang
Village :SANDHAKUDA
250Mainly local employment, health, education related issues raised with emphasis on spending more CSR funds on these mattersOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)General cargo & container Handling80OthersMillion Tons per AnnumRoad,Rail,OthersThrough water ways
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Mar 2017
(iv)Valid Upto 31 Mar 2021
(v)File No. 4699
(vi)Application No. ID NO. 457235 dtd. 10.01.2017
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12743
(b) Funds Allocated for Environment Management (Capital) (in Crores) 128
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 35
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 46
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 96000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 96000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Construction materials96000OthersTON (STEEL CEMENT & OTHER AGGREGATESNARoad90 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2017 To 31 Jan 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube23014129.460
(2.)SO2Micro Gram per Meter Cube1589101.280
(3.)NOxMicro Gram per Meter Cube25813145.280
(4.)PM10Micro Gram per Meter Cube24587216100
    14.2.     No. of Ground Water monitoring locations : 13
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.178.5
(2.)Total Hardnessmg/l40452200600
(3.)Heavy MetalsArsenicmg/l0.0460.0010.010.05
(4.)TDSmg/l38343415002000
(5.)Fluoridemg/l0.960.051.01.5
(6.)TSSmg/l3135001000
(7.)Chloridesmg/l1228462501000
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.52.6C
(2.)Othersnitrate as NO3mg/l5.342.28C
(3.)BODmg/l33C
(4.)pHNA7.97.2C
(5.)CODmg/l566C
    14.4.     No. of Ambient Noise monitoring locations : 16
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.543.555
(2.)Leq(Night)A-weighted decibels(dB(A))53.543.555
    14.5.     No. of Soil Sample Monitored locations : 13
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare1229.362.7
(2.)K(Potassium)Othersmeq/l2.50.1
(3.)Electric ConductivityOthersdS/cm1.50.01
(4.)P(Phosphorus)Kilogram per hectare54.529.6
(5.)pH7.93.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface58001Copy of Permission LetterPipelineWeir137407 Feb 20191023882
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic100100Activated Sludge Process(ASP)Discharge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant6040
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 100
(b)Total Discharged Water (Kilolitre per Day) 40
(c)Total Reused Water (Kilolitre per Day) 60
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Construction and Demolition wasteConstruction & Demolition Waste00Tons00OthersPIPELINEOthersC & D Waste will be disposed in low laying area
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000000.160
(2.)PM10Microgram per Meter Cube0000000.1100
(3.)NOxMicrogram per Meter Cube0000000.180
(4.)SO2Microgram per Meter Cube0000000.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA0000OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 76000
(b)Source OPTCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Not Yet Finalized
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 75.635
(b)Private Land (ha.) 00
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 169.365
    Total Land (ha.) 245
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 00
(g)Forest (ha.) 75.635
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : All land (including Forest land) required for the 169.365
    Total (ha.) 245
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersBerth Construction,Stack Yard etc.245
Total (ha.) 245
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSGahirmatha, Kendrapada40far from project location
(2.)Critically Polluted AreaNA00NO CPA Near Project Site
(3.)NPAGahirmatha, Kendrapada40far from project location
(4.)CorridorsNA00NO Corridors Near Project Site
(5.)Wildlife CorridorsNA00NO Wildlife Corridors Near Project Site
(6.)ESZsNA00NO ESZs Near Project Site
(7.)ESAsNA00NO ESAs Near Project Site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00NA
(2.)ForestSandhakuda06Village Forest
(3.)Defence InstallationsCoastguard Headquarters1.5no effect of project on this installation
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 4272
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 245
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired all land of 245 Ha are under the possession of Par
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1375
(c)Temporary Employment- During Construction 2000
(d)Temporary Employment- During Operation 5000
(e)No. of working days 600
(f)Total Manpower 8375
32.
Green Belt in Ha:
(a)Total Area of Green Belt 100
(b)Percentage of Total Project Area 40.82
(c)No. of Plants to be Planted 100000
(d)Funds Allocated for Plantation 25000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification II
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any NA
(d)Area of Mangroves Land (hectare) 00
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Impact on land environment is anticipated due to v
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Nov 2017
(iv)Period of Study To (EIA Terrestrial) 31 Jan 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies The overall physico-chemical characteristics ind
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Nov 2017
(iv)Period of Study to (EIA Marine) 31 Jan 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Details given in EIA report
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Anna University Chennai
(ii)Please Specify with salient features Expansion of inner harbour including western dock
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity II
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 00
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 00
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed The details available in the letter
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) The details available in the letter
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 12
(b)Total No. of Flats to be Build 00
(c)No. of Buildings 8
(d)Total plot area (sqm) 15000
(e)Total built up area (sqm) 10000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 40000
(c)No. of Recharge Pits 2
(d)Capacity 5000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 400 Sqm.
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 00
(c)Quantity 00
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0088
(ii)Name of the EIA Consultant CSIR-NEERI Nagpur
(iii)Address Nehru Marg Nagpur, Maharashtra PIN-440020
(iv)Mobile No. 9820839821
(v)Landline No. 0712224999
(vi)Email Id r_kumar@neeri.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 17 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per ToR condition No. (iii) Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued earlier along with an action taken report on issues which have been stated to be partially complied or non/not complied. Kindly submit the same. 15 Mar 2019
2.NAThe correction have been made as per the instruction received 05 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKOTHAPALLI RAMACHANDRA RAO
DesignationCHIEF ENGINEER
Name of Company (Applicant Name should not be given here)PARADIP PORT TRUST
AddressADMINISTRATIVE BUILDING PARADIP PORT TRUST PARADIP
Print